Determine the probability that the annual runoff from

Assignment Help Civil Engineering
Reference no: EM13552754

1.A 10 ft. boom is acted upon by the 840-lb forceshown. Determine the tension in each cable and the reactionat the ball-and-socket joint at A.

2.The total annual runoff from small drainage basin is determined to be approximately normal with a mean of 14.0 in. and a variance of 9.0in^2. Determine the probability that the annual runoff from the basin will be less than 11.0 in. in all three of the next three consecutive years.

Reference no: EM13552754

Questions Cloud

Evaluate the linear distance on the screen : Light with a wavelength of 650 nm passes through a slit 7.56 µm wide, Find the linear distance on the screen from the central bright fringe to the third dark fringe on either side
Evaluate the wavelength of the light used in this experiment : A two-slit experiment with slits separated by 4.3 10-4 m produces a second-order maximum at an angle of 0.0650° , Find the wavelength of the light used in this experiment
What will be the probability that the pile can carry : Assume the capacity of a pile supporting a transmission tower is modeled with a log-normal random distribution with a mean of 250 tons and a c.o.v. of 20%.
Calculate the absolute pressure at an ocean depth : Calculate the absolute pressure at an ocean depth of 75 m. Assume the density of sea water is 1 028 kg/m3 and the air above exerts a pressure of 101.3 kPa
Determine the probability that the annual runoff from : The total annual runoff from small drainage basin is determined to be approximately normal with a mean of 14.0 in. and a variance of 9.0in^2. Determine the probability that the annual runoff from the basin will be less than 11.0 in. in all three of t..
What is the period of the second harmonic? : One of the mooring lines of USS BOXER (LHD-4) is under a tension of 4500 N and is set into resonance by the vibration of a CHT pump. What is the period of the 2nd harmonic
What percentage change in the tension of the wire : The G string of a guitar which should be 392 Hz is playing flat at 380 Hz. What percentage change in the tension of the wire is required so as to tune the string to 392 Hz
What is the peak discharge at the reach outlet : Use the Muskingum method to route a flood through a reach a river. The base flow is 100 cfs, and the incoming flood flow increases 50 cfs every 2 hr over a 6 hr period and the subsides at the same rate.
Determine the change in storage during : Athletic Lake has a surface area of 75.96 km2. In September, the evaporation was estimated to be 3.20 inches and the precipitation was 3.45 inches. The average flow rate of the River Tiger into the lake was determined to be 3.5 m3/s and the average f..

Reviews

Write a Review

Civil Engineering Questions & Answers

  Engineering ethics and ethical issue

what is the engineering ethics course where to write about any engineering ethical case and discuss the ethical issue?

  Engineering ethics and concept and cases

what is the engineering ethics case related to civil engineering with reference and discuss all the engineering ethics issues which covered the "Engineering etics concepte and cases?

  Transportation and management

In the construction management, there is a lot of procurement route that are necessary and suitable for the construction industry.

  Supporting Investment Promotion: ERNST & YOUNG

Ernst & young is currently providing support to various sectors. In this regards it was felt that if this report is able to document good practices currently being adopted or planned in ceramic sector.

  Personalized Cancer Therapy-A step forward

Cancer is the uncontrolled growth of abnormal cells in the body resulting in tumours that can be benign or malignant (cancerous cells). A proper treatment is necessary to fight with this serious disease.

  Discuss the different environmental companies

Discuss the different agencies, institutes, centers, different environmental companies that are active in UAE.

  Develop a simple urban constructed wetland design

Develop a simple urban constructed wetland design.

  Evaluate company performance in relation to GRI standards

Evaluate company performance in relation to GRI standards and comment on Stigler's theory.

  Water system design

Determine the corresponding error in the computed discharge

  Hydraulic behaviour in open channel

Describe how test flumes and associated equipment are used to assess and confirm hydraulic behaviour in open channel

  Write a paper on steel sustainability

Write a paper on steel sustainability.

  Writing case study about bridge collapse

Writing case study about bridge collapse

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd