Determine the pressure (psi) at the bottom of the well pipe

Assignment Help Civil Engineering
Reference no: EM13555111

Pressure Variation in a Fluid at Rest 1. In April 2010, the Deepwater Horizon drilling rig experienced a severe explosion and fire and sank off the coast of Louisiana. Eleven persons died, and 17 others were injured. The resulting uncontrolled oil release from the damaged well being drilled persisted for almost 4 months. The rig was in the process of closing an exploratory oil well in the Gulf of Mexico. The seafloor at the well site was 5,067 ft below the water surface, and the petroleum reservoir was located 18,360 ft below the water surface. One cement plug had been placed at this lower depth, and a second cement plug was being completed at the time of the explosion. A key issue in the investigation of the explosion is the decision to replace drilling fluid (a.k.a. %u201Cdrilling mud%u201D) with seawater in the well pipe prior to installation of the upper cement plug. Drilling fluid is an engineered mixture of water, polymers, clay, and other material that serves a variety of purposes including acting as a dense counterweight to the high pressure of the petroleum reservoir. Some experts have hypothesized that removal of the drilling fluid in favor of less dense seawater allowed a high pressure methane bubble to move up the well pipe (a %u201Cblowout%u201D). Determine the pressure (psi) at the bottom of the well pipe (depth 18,360 ft) if drilling fluid of specific weight 17 lb/gal were left in place between the seafloor and the petroleum reservoir. Remember that pressure at the seafloor would include hydrostatic pressure due to the seawater (\(\gamma=64 lb/ft^3\)). Determine the pressure (psi) at the bottom of the well pipe if all drilling fluid were replaced by seawater.

Reference no: EM13555111

Questions Cloud

Will a booster pump be required for the building : The top floor of an office building is 40 m above street level and is to be supplied with water from a municipal pipeline buried 1.5 m below street level. The water pressure in the municipal pipeline is 450 kPa
Find the minimum weight need to keep the gate closed : A plane gate of uniform thickness holds back a depth of water as shown. Find the minimum weight need to keep the gate closed. theta=30degrees L = 3m w = 2m
Determine the magnitude of acceleration when : A particle travels along a path defined by the parabola y=0.5x^2. If the component of velocity along the axis is Vx=6t with t in seconds. determine the particle's distance from the oriigin
Find the nominal flexural strength and the design strength : Consider a singly reinforced concrete beam with a base dimension of b= 12in and d=20in. Assume all bars are located in one row. Use Grade 60 steel and 5ksi concrete. Find the nominal flexural strength and the design strength for the following cases
Determine the pressure (psi) at the bottom of the well pipe : Pressure Variation in a Fluid at Rest 1. In April 2010, the Deepwater Horizon drilling rig experienced a severe explosion and fire and sank off the coast of Louisiana. Eleven persons died, and 17 others were injured. The resulting uncontrolled oil re..
Determine the time needed for block a to rise 3 m : The motor draws in the cable at c with a constant velocity of vc= 4 m/s. The moto draws in the cable at D with a constant acceleration of aD=8 m/s^2. If vD=0 when t=0, determine: a) the time needed for block A to rise 3 m b)the relative velocity of b..
Determine the calculated pressure at each of the 5 pressure : Knowing the submerged depth of each of the 5 pressure taps and the density of water, determine the calculated pressure at each of the 5 pressure taps.
What is the shear strength in terms of effective stress : What is the shear strength in terms of effective stress on a place within a saturated soil mass at a point where the total normal stress is 295 kN/m2^2 and the pore water pressure 120 kN/m^2?
What is the average number of vehicles waiting to be served : An expressway off-ramp consisting of a single lane leads directly to a tollbooth. The rate of arrival of vehicles at the expressway can be considered to be Poisson with a mean of 30 veh/h.

Reviews

Write a Review

Civil Engineering Questions & Answers

  Engineering ethics and ethical issue

what is the engineering ethics course where to write about any engineering ethical case and discuss the ethical issue?

  Engineering ethics and concept and cases

what is the engineering ethics case related to civil engineering with reference and discuss all the engineering ethics issues which covered the "Engineering etics concepte and cases?

  Transportation and management

In the construction management, there is a lot of procurement route that are necessary and suitable for the construction industry.

  Supporting Investment Promotion: ERNST & YOUNG

Ernst & young is currently providing support to various sectors. In this regards it was felt that if this report is able to document good practices currently being adopted or planned in ceramic sector.

  Personalized Cancer Therapy-A step forward

Cancer is the uncontrolled growth of abnormal cells in the body resulting in tumours that can be benign or malignant (cancerous cells). A proper treatment is necessary to fight with this serious disease.

  Discuss the different environmental companies

Discuss the different agencies, institutes, centers, different environmental companies that are active in UAE.

  Develop a simple urban constructed wetland design

Develop a simple urban constructed wetland design.

  Evaluate company performance in relation to GRI standards

Evaluate company performance in relation to GRI standards and comment on Stigler's theory.

  Water system design

Determine the corresponding error in the computed discharge

  Hydraulic behaviour in open channel

Describe how test flumes and associated equipment are used to assess and confirm hydraulic behaviour in open channel

  Write a paper on steel sustainability

Write a paper on steel sustainability.

  Writing case study about bridge collapse

Writing case study about bridge collapse

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd