A pilot study was conducted to strip TCE at a concentration of 230 ppb from a contaminated groundwater using a small packed tower air stripper containing 50-mm diameter polytethylene intalox saddles. The packed tower was 30 cm in diameter with sampling ports located at packing depths of 0,2,4,6,8,10, and 12 meters. The loading of water to the tower was 0.039 m^3/(m^2/s), and the temperature of groundwater was 10 degrees celcius. The table below shows measure TCE concentrations in the water for several of the sampling ports:
Depth (m) TCE conc. (ppb) NTU0 2302 1004 556 258 16
a) Determine the NTU values for each sampling port depth.b) What was the overall mass transfer coefficient (Kla,s^-1) for TCE under the conditions studied in the pilot-scale test?c) From the pilot-scale study, what packing depth in the tower would have been needed to obtain a concentration of 5 ppb TCE in the groundwater?
The temperature was 200C, and the void ratio (e) of the soil was 0.43. Calculate the "Coefficient of Permeability" in "centimeters per second" (Given, k = (QL)÷(A Δh t)).
The difference between the total and static pressure before a shock is 75 psi. What is the maximum static pressure that can exist at this point ahead of the shock? The gas is oxygen.
A 32-in.-wide by 0.125-in.-thick by 110-in.-long steel sheet is to be formed into a hollow section by being bent through 360° and having the long edges welded (i.e., butt-welded) together. Assume a cross-sectional medial length of 32 in.
Assuming unit surface area, find the conductive heat loss through the furnace wall and the temperature at the interface of the fire clay and red brick.
The rigid bar of negligible weight is supported as shown. Find the stress in each rod if the temperature rises DeltaT after a load P is applied. Use the following data: area of steal rod 320mm2, bronze rod 1300mm2, thermal expansion coefficient Al..
The initial schedule called for 500 feet of pipeline to be installed each week, with the total construction cost projected to be $25 million. After 8 weeks, 4750' of pipeline has been installed at a cost of $11.25 million.
Determine the COD, carbonaceous BOD, and nitrogenous oxygen demand of a 100 mg/L solution of urea (N2H4CO)
Property taxes,insurance and storage will run 5%.What is the owning cost for the dozer?Use the time value method to calculate the depreciated portion of the ownership cost.
Roughly what is the maximum Volume of treated wastewater should you put in the bottle if you want to have at least 2.0mg/l of DO at the test (filling the rest of the bottle with the water
Design a horizontal curve with a 40-degree central angle (delta=40) for a two-lane road with 11-ft lanes. The design speed is 70 mi/h and superelevation is limited to 0.06ft/ft. Give radius, degree of curvature, and length of curve.
What annual investment is required at 8% per year compounded annually to accumulate to $100,000 at the end of 20 years?
A proposal has been submitted to replace a group of assembly workers, each working individually, with an assembly line. The following table gives the individual work elements. The demand rate for this job is 1600 units/week (assume 40h/week)
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd