Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
A building frame is made with a 10" square steel box shape that has an area of 15 in^2 and a moment of inertia I =225 in^4. The frame consists of pinned supports at points A and F and an internal pin at point D. If the frame is subject to the two 10 kip point loads at points C and E, determine the normal stress on the outside of the frame, at point B.
Select the sentence that is punctuated correctly.
Water with a static pressure of 1.96kN/M 2 flows through an 800 mm diameter pipe. A pitot tube pressure gage in this pipe reads a pressure of 5.88 kN/M 2 . How do you determine the volume flow rate (Q) of the water? (Q = 1.40 M^3/sec, V=2.79 M/se..
Footings for a structure are to be built beneath a basement slab on a clay soil at a depth of 20 ft below present ground level. The groundwater table is 15ft below the ground surface. The soil void-ratio is about 0.087.
A sample with a measured background level (Bi) of 22 mg/l was spiked with the equivalent of 30 mg/l without appreciably changing the sample volume. The result for the spiked sample (Ai) was 49.2 mg/l. Calculate Pi and determine if it falls with th..
Determine the net rate of flow of linear momentum through the control surface.
a quartzite sample in a compression testing mechine is 180mm long and 54mm in diameter. what is the stress under a load of 100kN? if the modulus of elasticity is 102kN/mm2, find the strain develope in the sample.
A project involves transporting iron pipe to a jobsite that is 43 miles from the supplier. The pipe will be hauled in trucks that can carry 16 pipes per load. Each pipe is 20 ft in length. The average haul speed of a truck will be 50 mi./hr and re..
If the elevation difference between the water surfaces is y = 25 + x/11 metres, what minimum pipeline diameter will be required to convey the design discharge? Once your design is complete, determine the actual discharge. The value of x equals 23.
A rectangular clarifier with a length:width ratio of 3:1 receives a flow of 850m3/day. the clarifiers depth is 4.0m and the detention time of the water inthe clarifier is 2.4 hrs, what are the surface overflow rate and the horizontal flow through ..
A measurement was recorded as 171.278 m with a 30-m tape that was only 29.996 m under standard conditions. What is the corrected measurement?
What is the concentration of tracer in the reactor 1 h after tracer addition is terminated? The reactor had an initial concentration of tracer of 1.0 mg/L when tracer addition commenced.
Need to design a cantilever retaining wall 8m high, saturated unit weight is 16kn/m 3 , surcharge is 7kn/m 2 , load above wall supported on wall stem
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd