Determine the new objective function value

Assignment Help Finance Basics
Reference no: EM13825873

Question 1) Machines is available for 40 hours a week and there is no setup time required when shifting from the production of one product to any other. The processing requirements to make one unit of each product are shown in the table. Weekly product demand for the next planning period has been forecasted as follows: 80

E-1000s; 65 S-2000s; 35 P-2000s; and 20 N-1000s.
Processing Time (Minutes Per Printer)
Model Machine
1 Machine 2 Machine 3 Machine 4
E-1000 (E) 10 15 15 5
S-2000 (S) 10 10 10 10
P-2000 (P) 5 10 15 10
N-1000 (N) 5 5 5 10

Question 2) In the questions that follow, the traditional method refers to maximizing the contribution margin per unit for each product, and the bottleneck method refers to maximizing the contribution margin per minute at the bottleneck for each product.
Use the information in Table 7.6. Using the traditional method, in what sequence should products be scheduled for production?
a. N, S, E, P b. N, E, P, S c. P, E, N, S d. E, S, P, N

Question 3) In Statistical Process Control, are used to detect defects and determine if the process has deviated from design specifications.
a. Flowcharts
b. Cause-and-Effect Diagrams c. Process Capability Charts
d. Control Charts

Question 4) The process that facilitates the placement of orders and identifies, attracts, and builds relationships with external customers is called the:
a. customer relationship process.
b. new service development process. c. order fulfillment process.
d. supplier relationship process.

Question 5)

Scenario 1.1

A job consists of three elements. Twenty observations for each element were timed, and the resulting data are shown in the following table. A performance rating has also been assigned for each element, as shown in the table. The job has an allowance of 20% of normal time.

Element
Performance
Rating (%)
Average Element
Time (in minutes)
# 1
80
3.6
# 2
100
2.5
# 3
110
3.1
Use the information in Scenario 1.1. What is the normal time for the entire job?
a. Greater than or equal to 10.0 minutes
b. Less than 10.0 minutes but greater than or equal to 8.5 minutes c. Less than 8.5 minutes but greater than or equal to 7.0 minutes d. Less than 7.0 minutes

Question 6)
Table 1.3
Act. I.P N. Time C. Time N. COST ($000s) C. COST ($000s) Av. Crash wks C. Cost
/wk
A - 4 2 8 14
B A 3 2 9 11
C A 4 4 10 10
D B,C 5 3 10 15
E C 4 1 11 14
F D,E 1 1 6 6
* Act.: Activity
I.P. : Immediate Predecessor
N. Time : Normal Time
C. Time: Crash Time
N. Cost: Normal Cost ($000s) C. Cost: Crash Cost ($000s)
Av. Crash wks: Available Weeks of Crashing
C. Cost/wk: Crashing cost per week
Which activity should be crashed first for the project shown in Table 1.3?
a. A b. B c. C d. D

Question 7) You are interested in buying a laptop computer. Your list of considerations include the computer's speed in processing data, its weight, screen size, and price. You consider a number of different models, and narrow your list based on speed and monitor screen size, then finally select a model to buy based on its weight and price. In this decision, weight and price are examples of:
a. order qualifiers.
b. the voice of the supplier. c. order winners.
d. the voice of the customer.

Question 8) Input measures to planning long-term capacity include such metrics as:
a. the number of customers served per hour.
b. the number of trucks produced per day. c. the number of machine hours available. d. the number of bills processed in a week.

Question 9) Regardless of how departments like Accounting, Engineering, Finance, and Marketing function in an organization, they are all linked together through:
a. management. b. processes.
c. customers.
d. stakeholders.

Question 10) When considering the plan-do-study-act cycle for problem solving, data are collected to measure process improvements in the step.
a. plan b. do
c. study d. act

Question 11) The upper and lower specifications for a service are 10 min. and 8 min., respectively. The process average is 9 min. and the process capability ratio is 1.33. What is the process standard deviation?
a. 0.1 b. 0.15 c. 0.20
d. 0.25

Question 12) Activity slack is defined as:
a. latest start time minus earliest start time. b. earliest start time minus latest start time.
c. earliest finish time minus latest finish time.
d. latest finish time minus earliest start time.

Question 13) A company desires to set up a line to produce 60 units per hour. The work elements and their precedence relationships are shown in Table 7.12.
Use the information in Table 7.12. What is the highest efficiency line balance possible?
a. Less than 93%
b. More than 93% but less than or equal to 95% c. More than 95% but less than or equal to 97% d. More than 97%
Table 7.12
Work Time Immediate
Element (sec) Predecessor(s)

Question 14) The second step in Theory of Constraints application, "exploit the bottleneck(s)," means that:
a. the analyst should create a schedule that maximizes the throughput of the bottlenecks.
b. the analyst should repeat the analysis process to look for other bottlenecks.
c. the analyst should consider increasing capacity of the bottleneck.
d. the analyst should schedule non-bottleneck resources to support the bottleneck.

Question 15) In an assembly operation at a furniture factory, six employees assembled an average of 450 custom cabinet drawers per 5-day week. What is the labor productivity of this operation?
a. 90 chairs per worker per day b. 20 chairs per worker per day c. 15 chairs per worker per day d. 75 chairs per worker per day

Question 16) Front offices typically emphasize:
a. low cost operations and on-time delivery. b. top quality and customization.
c. on-time delivery and standardization. d. top quality and low cost operations

Question 17) Manufacturing processes usually have:
a. physical, durable output.
b. high levels of customer contact.
c. output that cannot be inventoried.
d. low levels of capital intensity.

Question 18) Regarding control charts, a type I error refers to concluding that the process is:
a. in control when it is not in control. b. incapable when it is capable.
c. out of control when it is in control. d. capable when it is not capable.

Question 19)
Table 7.6
Burdell Industries makes four different models of computer printers: the E- 1000, the S-2000, the P-2000 and the N-1000. The E-1000 sells for $200 and has $40 in parts and $40 in labor; the S-2000 sells for $150 and requires $30 in parts and $30 in labor; the P-2000 sells for $100 and has $20 in parts and $20 in labor; and the N-1000 sells for $75 but requires only $10 of parts and $10 of labor. Fixed overhead is estimated at $5,000 per week. The manufacture of each printer requires four machines, Machines #1, 2, 3 and 4. Each of the machines is available for 40 hours a week and there is no setup time required when shifting from the production of one product to any other. The processing requirements to make one unit of each product are shown in the table. Weekly product demand for the next planning period has been forecasted as follows: 80 E-1000s; 65 S-2000s; 35 P-2000s; and 20 N-1000s. Processing Time (Minutes Per Printer)
Model Machine
1 Machine 2 Machine 3 Machine 4
E-1000 (E) 10 15 15 5
S-2000 (S) 10 10 10 10
P-2000 (P) 5 10 15 10
N-1000 (N) 5 5 5 10

In the questions that follow, the traditional method refers to maximizing the contribution margin per unit for each product, and the bottleneck method refers to maximizing the contribution margin per minute at the bottleneck for each product.

Use the information in Table 7.6. Using the bottleneck method, in what sequence should products be scheduled for production?
a. N, S, E, P b. N, E, P, S c. P, E, N, S d. E, S, P, N

Question 20) A manufacturer that produces standard products in large volumes is likely to be using a(n):
a. make-to-stock strategy. b. make-to-order strategy.
c. assemble-to-order strategy. d. engineer-to-order strategy.

Question 21) Which one of the following statements about flexible automation is best?
a. Investment cost is lower when a transfer machine handles many operations.
b. Chemical processing plants and oil refineries mainly utilize programmable automation.

c. It is an automatic process that can be reprogrammed to handle various products.
d. It achieves top efficiency; accommodating new products is difficult and costly.

Question 22) Which statement regarding learning rates is best?
a.A more complicated process offers more room for improvement.
b.A simpler process has a more pronounced learning rate.
c. Typically, the effect of each capital addition on the learning curve is significant.
d.Regardless of output volume, the estimate for the time required to produce the first unit is less important than the estimate of the
learning rate.

Question 23) You are given the following information about an activity A:
i) Normal time = 9 weeks ii) Crash time = 7 weeks iii) Normal cost = $20,000 iv) Crash cost = $30,000
What will it cost to complete activity A in 8 weeks?
a. Less than or equal to $24,000
b. Greater than $24,000 but less than or equal to $27,000 c. Greater than $27,000 but less than or equal to $30,000 d. Greater than $30,000

Question 24)Quill Manufacturing Business makes two models of marking pens. An unlabeled graph for this problem and the requirements for each lot of pens in the three manufacturing departments are given below. All three departments are necessary in the production of both types of pens. The profit for either kind of pen is $1000 per lot. An unlabeled graph for this problem is given below. The dotted line represents the objective function line.

Fliptop Model Tiptop Model Available production hrs.

Ink Assembly 3 4 36

Molding Time 5 4 40

Plastic 5 2 30

Question 25) What is the optimal production quantity of the Fliptop model?

A. 5 lots

B. 4 lots

C. 2 lots

D. 7 lots

E. 6 lots

Question 26) If all the constraint inequalities in the original problem were ≥, then the following is true:
A. The value of the objective function at the optimum solution is zero

B. There will be multiple optimal solutions

C. The problem will become unbounded

D. The problem has a unique solution

E. None of the above is true

Question 27) Let M be the number of units to make and B be the number of units to buy of a certain product. If it costs $2 to make a unit and $3 to buy a unit and 4000 units are needed, the objective function of the LP model to minimize the cost of production would be,
A. Min 4000 (M + B)

B. Max 8000M + 12000B

C. Min 2M + 3B

D. Max 2M + 3B

E. Min 4000U -2M-3B
Question 28) The Quiet Meadow Studio sells photographs and prints. It cost $20 to purchase each photograph and it takes 2 hours to frame it. It costs $25 to purchase each print and it takes 5 hours to frame it. The store has at most $400 to spend and at most 60 hours to frame.

It makes $30 profit on each photograph and $50 profit on each print. Determine the maximum profit.
A. 360

B. 600

C. 700

D. 740

E. 800

Questions 29) Quality Bike Maps has produced four map designs for the local area. A limited amount of time (in minutes) is allocated to the printing, cutting and folding of each map. Additionally, at least one thousand of map designs A, B, and C must be printed. The profit per map is $1 for A and B and $2 for C and D. The Excel output is provided below.

Max Profit = A + B + 2 C + 2 D

s.t.

A + 2 B + 3 C + 3 D < 15000 Print

2 A + 4 B + C + 3 D < 20000 Cut

3 A + 2 B + 5 C + 3 D < 20000 Fold

A > 1000 Print A

B > 1000 Print B

C > 1000 Print C

Microsoft Excel 14.0 Sensitivity Report

Objective Function Value $10,166.67

Variable Cells

Final Reduced Objective Allowable Allowable

Cell Name Value Cost Coefficient Increase Decrease

$B$18 Map A 1500 0 1 1 0.333333333

$C$18 Map B 1000 0 1 0.333333333 1E+30

$D$18 Map C 1000 0 2 0.333333333 1E+30

$E$18 Map D 2833.333333 0 2 1 0.5

Constraints

Final Shadow Constraint Allowable Allowable

Cell Name Value Price R.H. Side Increase Decrease

$B$24 Print 15000 0.5 15000 1000 5666.666667

$B$25 Cut 16500 0 20000 1E+30 3500

$B$26 Fold 20000 0.166666667 20000 7000 1000

$B$27 Print A 1500 0 1000 500 1E+30

$B$28 Print B 1000 -0.33333333 1000 1750 1000

$B$29 Print C 1000 -0.33333333 1000 500 1000

Question 30) Answer the following question using the Excel output above. Which constraint(s) are binding?

A. Print and Fold

B. Cut and Print A

C. Print B and Print C

D. Print and Cut

E. Print, Fold, Print B and Print C

Question 31) Answer the following question using the Excel output above. Keeping within the confines of the problem, the profit on Map A has increased by one dollar. Determine the new objective function value.

A. 1,500

B. 11,166.67

C. 11,500.67

D. 11,666.67

E. 12,566.67
Question 32) Quentin Magic Brown manufactures sports shoes and wants to maximize the company's profits. The company makes two types of sport shoe, Airwalkers and Bouncy Basketball shoes. The company earns $10 profit on each pair of Airwalkers and $18 profit on each pair of Bouncy Basketball shoes.

The manufacturing process includes cutting the materials on a machine and having workers assemble the pieces. Each pair of Airwalkers requires 3 minutes of cutting time and the Bouncy Basketball shoes require 2 minutes. The machines that cut the material can run at most 1200 minutes a week.

Each worker takes 7 hours to assemble a pair of Airwalkers and 8 hours to assemble a pair of Bouncy Basketball shoes; the maximum number of hours available is 3500 per week.

Determine the maximum profit for this problem?
A. $3200

B. $4000

C. $4280

D. $6295

E. $7875

Questions 33) Apply to the Excel output for the Quantum Mo-Botics model is below. The company makes three types of machines and has limitations with regards to the amount of skilled and unskilled labor hours available and time on the assembly line.
MAX Profit = 800SemiAuto+1000Robotic + 500Manual

s.t.

30SemiAuto + 100Robotic + 45Manual < 4500 Skilled Labor

100SemiAuto + 70Robotic + 90Manual < 9000 Unskilled Labor

15SemiAuto + 20Robotic + 10Manual < 2000 Assembly Line

Microsoft Excel 14.0 Sensitivity Report

Objective Function Value $ 82,025.32

Variable Cells

Final Reduced Objective Allowable Allowable

Cell Name Value Cost Coefficient Increase Decrease

$B$18 SemiAuto 74.05063291 0 800 628.5714286 432.4786325

$C$18 Robotic 22.78481013 0 1000 1666.666667 440

$D$18 Manual 0 -320.253164 500 320.2531646 1E+30

Constraints

Final Shadow Constraint Allowable Allowable

Cell Name Value Price R.H. Side Increase Decrease

$B$24 Skilled labor 4500 5.569620253 4500 3605.263158 1800

$B$25 Unskilled labor 9000 6.329113924 9000 3805.555556 5850

$B$26 Assembly line 1566.455696 0 2000 1E+30 433.5443038

Question 34) Answer the following question using the Excel output above, determine the new objective function value if the profit on the second variable, Robotic, increases by $1000?
A. $22,785.00

B. $19,125.64

C. $33,800.00

D. $102,805.32

E. $104,810.32

Question 35) Answer the following question using the Excel output above. Keeping within the confines of the problem, you are required to hire a full time (40 hours) person who is qualified to work in any department. Select the constraint where you will gain the most profit and determine the additional profit to be gained?
A. $253.16

B. $222.80

C. $341.00

D. $129.50

E. $119.50

Question 36) Answer the following question using the Excel output above. Keeping within the confines of the problem, how many more hours of skilled workers could you add to the department?

A. 2875.33

B. 1280.56

C. 1550.56

D. 3805.56

E. 3605.26

Question 37) Using the Excel output above, how much is each additional unit of unskilled labor worth?

A. $74.500

B. $22.790

C. $5.570

D. $6.329

E. $3.250

Question 38) An ice cream plant make's Chocolate and Strawberry ice cream.

There is $40 profit for a case of Chocolate and $32 for a case of Strawberry and has the following constraints:

32C + 8S < 4,800 Flavoring

28C + 32S < 14,000 Coloring

a. What is the optimal solution?

b. Now add a constraint: demand for Strawberry is always less than 200 cases and determine the optimal solution.

c. Add another constraint: demand for Chocolate is always less than 400 cases and determine the optimal solution.

Solution-

38a ( 52,392) $14,624

38b (100,200) $10,400

38c redundant constraint; no change

Reference no: EM13825873

Questions Cloud

What was going through vincent mind : Mr. Vincent, the Manager of a large supermarket, was taking a management course in the evening program at the local college. If you were the professor and you knew what was going through Vincent's mind, what would you say to Vincent
Counseling a patient suffering from depression and suicidal : Counseling a Patient Suffering from Depression and Suicidal Tendencies
Specification for observing angles of an 8-sided : Specification for observing angles of an 8-sided polygon limit the total angular misclosure to E=6". How accurately must each angle be observed?
Explain what is meant by non-market housing : The problem is explains about non-market housing and how it is delivered in the UK or any other country. This type of housing is not a direct or regular real estate market.
Determine the new objective function value : Quality Bike Maps has produced four map designs for the local area. A limited amount of time (in minutes) is allocated to the printing, cutting and folding of each map
Calculate the mass of glucose : Calculate the mass of glucose (C6H12O6) in a 105-mL sample of a 1.61 M glucose solution.
Write a review on the journal article : Write a review on the journal article
Physical properties of all organic groups : Clear visual summaru (such as tab) of physical properties of all organic groups (boiling, solubility, acidity, structure, etc)
Suppose that while titrating a vinegar sample : Suppose that while titrating a vinegar sample with standard NaOH you misread the buret and the calculated NaOH volume is greater than the actual volume used. How will this error influnence the final calculated percentage of acetic acid in the vinegar..

Reviews

Write a Review

Finance Basics Questions & Answers

  Financial reporting and analysis

Finance is about Gunns Ltd, a company in dealing with forestry products in Australia. The company has also been listed in Australian Stock Exchange. As many companies producing forestry products, even Gunns Ltd is facing various problems. Due to the ..

  A report on financial accounting

This report is specific for a core understanding for Financial Accounting and its relevant factors.

  Describe the types of financial ratios

Describe the types of financial ratios and other financial performance measures that are used during venture's successful life cycle.

  Differences between sole proprietorship and corporation

Briefly describe the major differences between a sole proprietorship and a corporation

  Prepare a cash budget statement

Calculate the expected value of the apartment in 20 years' time. What is the mortgage loan repayment at the beginning of each month

  What are the implied interest rates

What are the implied interest rates in Europe and the U.S.?

  State pricing theory and no-arbitrage pricing theory

State pricing theory and no-arbitrage pricing theory

  Small business administration

Identify the likely stage for each venture and describe the type of financing each venture is likely to be seeking and identify potential sources for that financing.

  Effect of financial leverage

The Effect of Financial Leverage and working capital management

  Evaluate the basis for the payment to the lender

Evaluate the basis for the payment to the lender and basis for the payment to the company-counterparty.

  Importance of opps, ipps, mpfs and dmepos

Research and discuss the differences and importance of : OPPS, IPPS, MPFS and DMEPOS.

  Time value of money

Time Value of Money project

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd