Determine the moisture content and overall specific weight

Assignment Help Civil Engineering
Reference no: EM13306336

A sample of argillaceous soil with a volume of 1x10-3 m3 and a mass of 1.762 kg, after oven dried, has a mass of 1.368 kg. The relative density of the grains is equal to 2.69. Determine, for the sample in its original condition:
a) dry unit weight
b) moisture content
c) voids
d) voids filled with air (expressed as% of voids = Sa = degree of air saturation)

Considering a sample of this soil completely saturated by water, which has not undergone fading in the process of saturation (ie, assuming that it has the same voids above), determine, also:
e) moisture content
f) overall specific weight.

Reference no: EM13306336

Questions Cloud

Describe a piece of john deere agricultural equipment : Describe a piece of John Deere agricultural equipment that utilizes GPS hardware and software. Describe how many RECs are placed on the equipment and where it is placed.
The mathematical model of the system : Prepare the report keeping in view all the attributes of the SOs given on next page. There will be a subsequent presentation to check some Consider damped of the attributes that cannot be addressed in the report.
Determine void ratio and dry unit weight of compacted sample : A soil sample is prepared in the laboratory by mixing a certain amount of dry soil with 10.5 wt% water. The relative density of the grains of the material is equal to 2.7.
Determine moisture content required to have full saturation : A sample of dry soil is mixed uniformly with 16 wt% water and then compacted into a cylindrical mold in the laboratory. The volume of moist soil is 1x10-3 m3 and its mass is equal to 1.60 kg.
Determine the moisture content and overall specific weight : A sample of argillaceous soil with a volume of 1x10-3 m3 and a mass of 1.762 kg, after oven dried, has a mass of 1.368 kg. The relative density of the grains is equal to 2.69. Determine, for the sample in its original condition
Would it increase government spending or decrease it : Suppose that aggregate demand increases such that the amount of real output demanded rises by $7 billion at each price level. By what percentage will the price level increase? Will this inflation be demand-pull inflation or will it be cost-push infla..
Which languages give the programmer the freedom to choose : Is allowing the programmer this freedom a good language design strategy or not? Take a position and defend it.
Determine what is the porosity of the soil sample : The sample is placed in a 103 F oven overnight and is weighted again the next day. If the weight after drying is 0.85 lb and the specific gravity of the soil granuals is 2.65, what is the porosity of the soil sample
Sort the array in the descending order using pointers : Create functions for the following tasks and make sure to pass a pointer to the table (array) as an argument to each of them.

Reviews

Write a Review

Civil Engineering Questions & Answers

  Determine what is the departure rate at a parking lot

The arrival rate at a parking lot is 6 veh/ min. Vehicles start arriving at 6: 00 P. M., and when the queue reaches 36 vehicles, service begins. If company policy is that total vehicle delay should be equal to 500 veh-min

  Determine what design speed was used for the curve

A horizontal curve was designed for a four-lane highway for adequate SSD. Lane widths are 12 feet, and the superelevation is 0.06 and was set assuming maximum fx. If the necessary sight distance required 52 feet of lateral clearance from the roadw..

  How many balloons would it take

To float a 160 pound man using helium balloons (assume 0.52 cubic feet per inflated balloon). How many balloons would it take? Assume density of air is 1.29 kg/cubic meter and the density of helium is 0.179 kg/cubic meter.

  Determine the compound empirical and molecular formula

A Silane contains 90.31 % silicon and 9.69 % hydrogen by mass. The compound has a molar mass of 62 g/mol. Determine the compound's empirical and molecular formula.

  Determine ft and fn

for this purpose replace this force by its equivalent of two forces at At Ft parallel and Fn perpendicular to the beam. Determine Ft and Fn.

  What will be compacted volume of soil in cy at full site

In addition to performing the cut-and-fill operations, the contractor needs to excavate the entire building footprint to a depth of 8 feet for a basement construction made of concrete masonry perimeter walls supported by 2'-0" X 0'-10" continuous ..

  Determine the stoichiometric oxygen requirement for fuel

Determine the Stoichiometric oxygen requirement (pounds of oxygen per pound of fuel) for a fuel containing by weight 50% n-octane,25% 1-heptene and 25% methanol.

  Types of metamorphic foliations

Name three types of metamorphic foliations, and draw a small sketch that shows a situation. Where a metamorphic foliation could cause problems in an excavation.

  Calculate equivalent pipe size and flow in the pipe

The first pipe of 0.4-m diameter is 500 m long, the second pipe 600 m long, size 0.3 m, and the last pipe is 500 m long of diameter 0.2 m. If the elevation difference between two reservoirs is 30 m, calculate equivalent pipe size and flow in the p..

  Explain how to estimate the flow rate in the cross section

The river channel itself is 20m wide and flow depth is 5m and the sandy bottom has an n=0.02, the left bank is 40m wide and the flow depth is 0.5m, while the right bank is 100m wide with a flow depth of 1m.

  Calculate the concentration of 137 cs in cows milk

After the Chernobyl accident, the concentration of 137Cs in milk was proportional to the concentration of 137Cs in the glass that cow consumed. The concentration in the grass was, in turn, proportional to the concentration in the soil.

  What is the original estimated duration of the project

The initial schedule called for 500 feet of pipeline to be installed each week, with the total construction cost projected to be $25 million. After 8 weeks, 4750' of pipeline has been installed at a cost of $11.25 million.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd