Determine the minimum clearance required

Assignment Help Civil Engineering
Reference no: EM13207589

A vertical curve is formed when a rural highway passes under a bridge joining a -8% grade to the horizontal grade satisfying the requirement for safe speed of 90 Km/hr . Determine the minimum clearance required betwwen the highway pavement surface and the top of culvert . use coefficient of friction 0.29

Reference no: EM13207589

Questions Cloud

How to formulate a linear programming model : The Charm City Cereal Company makes a cereal from several ingredients. Two of the ingredients, oats and rice, provide vitamins A and B. The company wants to know how many ounces of oats and rice it should include in each box of cereal to meet.
What would the new value of hc be : If the fracture were planar in shape, having an average opening of 2 mm, what would the new value of Hc be?
Calculate available water capacity : given bulk density as 1300kg/cubic meter and field capacity as 22% by weight and permanent wilting point as 10% by weight calculate available water capacity.
Describe how leonardo da vinci and michelangelo viewed : Describe how Leonardo da vinci and Michelangelo viewed drawing as a part of the creative process in 200 - 300 words each
Determine the minimum clearance required : A vertical curve is formed when a rural highway passes under a bridge joining a -8% grade to the horizontal grade satisfying the requirement for safe speed of 90 Km/hr . Determine the minimum clearance required betewen the highway pavement surface..
Determine the domestic investment spending : The government collects $7 in taxes and spends $10 on locally-made goods. Firms borrow $7 and make $7 in domestic investment spending. The government and firms buy no imports what is Germany's current account balance
Determine the reaction forces at points b and c : The fixture AC is designed with a screw adjustment to regulate the height of the 900 N load supported by the roller at A. The screw bears against a smooth surface at B. Determine the reaction forces at points B and C. Neglect the weight of the fix..
Calculate the water or cement ratio of the cement paste : Calculate the water/cement ratio of the cement paste in which all the cement will hydrate to leave no capillary pores. (density of cement: 3.1 g/cm3) ?
The initial length of an aluminum sample : The initial length of an Aluminum sample is 11.3 cm, and the ductility of Al %EL = 40 %. If this sample undergoes a tensile test until fracture, what is the fracture length of this sample in cm?

Reviews

Write a Review

Civil Engineering Questions & Answers

  Determining the dry volume

A saturated sample of clay with an sl 20 has a natural water content of 32%. What would its dry volume be as a percentage of its original volume of Gs.= 2.67.

  Estimate the particle removal efficiency

How do you propose to do this at the above treatment plant and estimate the head loss both immediately after backwash and 10 hours later, if the same water is applied at a rate of 2 L/s.m 2 .

  Define soda ash and quicklime

Soda Ash and QuickLime, A lime-soda softening plant treats a flow of 150 MGD, and the water has 86mg/l Ca2+, 35 mg/L Mg2+, 299 mg/L HCO3- and 6mg/l CO2.

  Steps of dmaic abandoned

Assume that during the analyze stage an obvious solution is discovered. Should that solution be immediately implemented and the remaining steps of DMAIC abandoned?

  Report on separate eligible bachelors

Calculate the numbers of married men, single men, married women and single women. Print these numbers on a student summary report. If any single men are over 30 years of age, print their names and ages on a separate eligible bachelors report.

  Minimizing the tension tab

What should TAC , TAB and the acute angle ? between TAB and the vertical to minimize the tension TAB ? Take o and W = 1,000 N. Hint: Consider various possible force triangles and decide on inspection how to minimize TAB.

  Determine the rate of flow-unconfined aquifer

In an unconfined aquifer having K = 30/m/day, two observation wells, 3km apart, have water levels of 50 and 40 m, respectively, above the base of the aquifer. Determine the rate of flow.

  Tightness of skid along with pump-motor

What is the solution if foundation bolt cut by some way from their bottom of skid, i mean skid base than how to keep another bolt etc for tightness of skid along with pump-motor already fittied with pipe and other fitting's too..

  Concrete dam retaining water

A concrete dam retaining water has a specific weight of concrete of 23.5kn/m3, what is the factor of safety against sliding & overturning and pressure intensity on the base if coefficient of friction is 0.45

  Critical review decision making of failed major construction

Critical review the decision making of a failed major construction/property project within the UK in the last ten years.

  Determining height for trajectory motion

The elastic ball bounces down a flight of rigid stairs. Determine the height h of the steps if all the trajectories between successive steps are identical. Use e = 0.85 and the initial velocity 6 m/s.neglect friction. (Theta=70 degrees)

  Structure project design in civil engineering

Land is extremely valuable in this area therefore to win this job you need to consider innovative approach to reduce the waste areas

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd