Reference no: EM13234713
1) A manager has received an analysis of several cities being considered for a new order fulfillment center (warehouse) for Shop at Home Network. The scores (scale is 10 points = best) are contained in the table below.
a. If the manager weights the factors equally, how would the locations be ranked?
b. If transportation costs and operating costs are given weights that are double the weights of the others, should the locations be ranked differently?
|
Location
|
Factor
|
W
|
X
|
Y
|
Z
|
Business services
|
7
|
9
|
5
|
4
|
Community services
|
5
|
7
|
6
|
7
|
Real estate cost
|
7
|
3
|
8
|
6
|
Construction costs
|
8
|
6
|
6
|
5
|
Operating costs
|
5
|
4
|
7
|
6
|
Business taxes
|
6
|
9
|
6
|
4
|
Transportation costs
|
8
|
6
|
7
|
8
|
2) A telecommunications firm is planning to lay fiber optic cable from several community college distance learning sites to a central studio, in such a way that the miles of cable are minimized. Some locations require more than one set of cables (these are the loads). Where should the studio be located to accomplish the objective?
College
|
Map Coordinate (x, y)
|
Load
|
A
|
(2,10)
|
3
|
B
|
(6,8)
|
2
|
C
|
(4,9)
|
4
|
D
|
(9,5)
|
1
|
E
|
(8,1)
|
3
|
F
|
(3,2)
|
2
|
G
|
(2,6)
|
1
|
3) An assembly line with 11 tasks is to be balanced. The longest task is 2.4 minutes, the shortest task is 0.4 minutes, and the sum of the task times is 18 minutes. The line will operate for 600 minutes per day.
a. Determine the minimum and maximum cycle times.
b. What range of output is theoretically possible for the line?
c. What is the minimum number of stations needed if the maximum output rate is to be sought?
d. What cycle time will provide an output rate of 200 units per day?
4) Brandon's computer shop has hired a consultant to help apply operation management techniques to increase profits. Currently the shop sells most of its computers to a high-end customized online retailer and sales are steady at 250 per month. A single work cell produces the computers. To produce the computer three operations are required. First the parts must be assembled, next software must be installed, and finally the computer must be safely packed and labeled for shipping. These operations take 2 hours, 5 hours, and 1 hour respectively. If there are 6 available work hours each day and the shop operates 20 days per month find:
a. The takt time.
b.The number of workers Brandon should hire.
Create method return the number of positive numbers in array
: Consider an array of integers as below: int[] a = {5, 2, -4, 3, 0, -5, 7, 11, 6, 13} a. Complete the method named count(int[] a) in the class Count.
|
What will happen to market supply and the price of the good
: Suppose that, in a perfectly competitive market at the profit maximizing quantity, the market price is greater than average total cost. Carefully explain what will happen to the number of firms, the market supply and the price of the good
|
What is the velocity of the shuttle after 5 seconds
: At launch the space shuttle has an overall upward acceleration of about 5m/s^2, how far inot the air will it travel, assumin that it travels straight up, what is the velocity of the shuttle after 5 seconds
|
Explain mixtures will be a buffer when dissolved in water
: Which of the following mixtures will be a buffer when dissolved in 1 liter of water?
|
Determine the minimum and maximum cycle times
: Determine the minimum and maximum cycle times and what range of output is theoretically possible for the line - What cycle time will provide an output rate of 200 units per day
|
What are the economic losses or zero economic profits
: Yesterday, a perfectly competitive producer of construction bricks manufactured and sold 10,000 bricks per week at a market price that was just equal to the minimum average variable cost of producing each brick.
|
Explain one preparation of hydrogen involves the reaction
: Large quantities of hydrogen are needed for the synthesis of ammonia. One preparation of hydrogen involves the reaction between carbon monoxide and steam at 300 degrees Celsius in the presence of a copper-zinc catalyst
|
Return array contains the exact same numbers as given array
: Return an array that contains the exact same numbers as the given array, but rearranged so that all the even numbers come before all the odd numbers. Other than that, the numbers can be in any order.
|
Compute the molar mass of the weak acid
: A weak monoprotic acid is titrated with NaOH, and the following data are recorded. Calculate the molar mass of the weak acid. original volume of acid solution = 50.00 mL mass of acid (a solid) = 0.3459 g
|