Determine the manufacturing overhead cost per unit

Assignment Help Managerial Accounting
Reference no: EM132855403

Question - Wolseley's dilemma of Traditional Costing versus Activity Based Costing Wolseley Manufacturing Corporation manufactures various electronics products and follows a traditional (job-order) costing system in which it applies manufacturing overhead to its products using a predetermined overhead rate based on direct labour-hours (DLHs). The company has two products, C18R and G19R, about which it has provided the following data:

 

C18R

G19R

Direct materials per unit

$10.20

$50.50

Direct labour per unit

$8.40

$25.20

Direct labour hours per unit

0.40

1.20

Annual production

30,000

10,000

The company's estimated total manufacturing overhead for the year is $1,464,480 and the company's estimated total direct labour-hours for the year is 24,000.

The company is considering using a variation of activity-based costing to determine its unit product costs for external reports. Data for this proposed activity-based costing system appear below:

Activities and Activity Measures

Estimated Overhead Cost

Supporting direct labour (DLHs) $552,000

Setting up machines (setups) 132,480

Parts administration (part types) 780,000

Total $1,464,480

Activities

C18R

G19R

Total

Supporting direct labour

12,000

12,000

24,000

Setting up machines

864

240

1,104

Part administration

600

960

1,560

Mike, who is the controller of the Company, is currently overseeing the project to switch from traditional costing to Activity-Based costing. He is in a meeting with the Cost Accountant of the company. The Controller goes over the data and makes the following comments:

"Activity-Based Costing is a revelation in the modern-day world of manufacturing Industry. If we are correctly able to categorize the various nature of work into essential levels, then we can dramatically trace the precise nature of the overheard activity."

Jacob, the Cost Accountant, quips, "how can we classify those levels of activities? Do we have some mechanism to identify them?"

Mike responds, "Yes! We do."

Jacob then laments the pitfalls of the job order costing system, "The production report will be out soon and usually, the allocation bases (including overhead allocations in job-order costing systems) are not entirely accurate." Mike, with a pause, "That is exactly why we may eventually need to switch to the Activity-Based costing though it is comparatively difficult to implement with the cost and operations limitations involved in it."

Jacob adds, "Another consideration to evaluate is the relationship between the cost of maximum (budgeted) capacity and idle capacity, since the company is likely to operate at maximum capacities during the time of peak demand. Moreover, our long-term goals of stable cost predictions and waste minimizations should also be kept in mind."

"Alright! Let us calculate and analyze the quantitative and qualitative aspects of the data and other factors we have discussed in the meeting today and prepare the preliminary report for the CEO by this weekend." Mike with the final comments!

Required -

a. Determine the manufacturing overhead cost per unit of each of the company's two products under the traditional costing system.

b. Determine the manufacturing overhead cost per unit of each of the company's two products under activity-based costing system.

c. Compare the results in part a and b under both costing systems and specify the differences in both systems.

d. What is the significance of the Activity Costing System that Mike is referring to?

e. How is ABC system different from traditional costing system?

f. The use of which activity level, budgeted (same as expected) or maximum capacity, is consistent with ABC? Explain.

g. How might the use of ABC based on maximum capacity activity level enhance a firm's ability to compete on price? Explain.

h. If you were to recommend one of the costing systems for Wolseley Inc., which one would you pick and why?

Reference no: EM132855403

Questions Cloud

Predictive analytics and leadership : The authors of the study conclude that "The consistency in identified challenges between Weak BI Adopters and Weak AA Adopters tells two stories
Explain the difference in opportunity cost : What is the opportunity cost of producing an additional shoe in East Stan, given the number of bikes that were abandoned?
Calculate confidence interval for males and females : What impact are the different means having on the intervals and what impact are the different standard deviations having?
Does the west continue to dominate global news flow : Asian values in journalism and its impact across the Asia-Pacific region. Does the West continue to dominate global news flow?
Determine the manufacturing overhead cost per unit : Determine the manufacturing overhead cost per unit of each of the company's two products under the traditional costing system
Compute the expected length of the arc : Choose, at random, three points on the circle x 2 + y 2 = 1. Interpret them as cuts that divide the circle into three arcs.
Determine timeline of the grant as well as activity timeline : Determine the timeline of the grant as well as your activity timeline and management plan to ensure you have covered all the nuances of project work.
Find the indicated probability : Find the indicated probability. (Enter a number. Round your answer to four decimal places.
What do see as benefits and challenges of review process : What do see as benefits and challenges of review process? What happens once a proposal is submitted? How are funded proposals selected?

Reviews

Write a Review

Managerial Accounting Questions & Answers

  Compute the total cost of the potential job

Compute the total cost of the potential job using machine hours to assign overhead. Assume that the bid price is based on full manufacturing cost plus 25% mark up. What is Tom's bid price?

  Prepare a multiple-step income statement for Simkins Company

Prepare a multiple-step income statement for Simkins Company for the year ended June 30, 20Y9. The inventory as of June 30, 20Y9, was $508,000

  What would be the maximum purchase price acceptable

What qualitative factors (that is, issues with vendors, customers, or within the product itself) should the Ski Pro Corporation consider in determining whether they should make or buy the bindings?

  What was the amount of depreciation expense

What were the total cost and book value of property, plant, and equipment - what was the amount of depreciation expense for each of the 3 years 2009-2011?

  How much of the money will each partner receive

How much of this money will each partner receive if profits and losses are allocated to Adams, Baker, Carvil, and Dobbs on a 1:3:3:3 basis, respectively?

  Determine the required sales to meet target operating income

Determine the required sales to meet the target operating income during 2020. Jagswear Inc. earned operating income of $81,000 during 2020.

  What predetermined overhead rate will the company

What predetermined overhead rate will the company use for all jobs worked on during 2014? (Round Overhead rate to 2 decimal places, e.g. 15.25.)

  What amount of operating costs will be budgeted

If a dual-rate cost allocation method is used, what amount of operating costs will be budgeted for the Lamp Division each month

  Solve the flexible budget variance for sales revenue

Calculate the flexible budget variance for sales revenue. The static budget, at the beginning of the month, for Divine Decor Company.

  What is mays budgeted ending cash balance

Cyclone anticipates borrowing $ 25,000 in May and paying for a piece of equipment costing $ 7,600. Given these expectations, what is May's budgeted ending cash balance?

  Why are accountants valuable to the organization

Why are accountants valuable to the organization? What responsibilities do managers have in understanding financial information

  What a cost is for swa company

SWA company is trying find costs of its products. Which of the following statements is true? A cost is? Always an expense./Always a liability.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd