Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
1.The vertical reactions a supports A and B for the feame are 13 kip and 37 kip, respectively. Determine the magnitude of the forces F1 and F2. Also, determine the horizontal reaction at A.
2.An equal tangent crest vertial curve has a 50mph design speed. The initial grade is +4.5%. The highest point is at station 35+37.43 and the PVT is at station 37+18.26. What is the elevation difference between the highest point and PVT?
An element in plane stress is subjected to stresses sigma x=27 MPA,sigma y=14 MPA,sigma xy=6MPA.Using mohr's circle,determine the stresses acting on an element oriented at an angle 40 degrees from the x axis.
When drawing a FBD, how do you know which direction the x, y and z components are applied? I know that the sum of forces in each direction and the moments about each axis have to equal zero so I know some FBD are pretty self explanatory
A project involves transporting iron pipe to a jobsite that is 43 miles from the supplier. The pipe will be hauled in trucks that can carry 16 pipes per load. Each pipe is 20 ft in length. The average haul speed of a truck will be 50 mi./hr and re..
An 8-in-diameter pipeline (f=0.028) 500 ft long discharges a 3-in-diameter water jet into the atmosphere at a point that is 250 ft below the water surface at intake.
Place the scientific mass on the inclined plane and string over the pulley. Using a force-measuring device, pull the string and determine the force needed to obtain static equilibrium.
a package in the shape of a rectangular box can be mailed bynbspthe us postal service if the sum of its length and
Find the maximum shearing stress and its location in the shaft and the angle of twist of A with respect to C. Let G = 4x10^6 psi for the entire shaft.
Estimate the liquid volume of an aeration tank (units of m^-3) required to treat the following wastewater to a BOD effluent standard of 30.0 mg L^-1 and a suspended solids effluent standard of 30 mg L^-1.
The Fluoride feeder runs out of feed solution. The rapid mix tank is connected to a 5 km long distribution pipe. The flow rate into the tank mix tank is 0.44 m?/s and the volume of the tank is 2.50 m?.
A room in a single-story building has three 2.5 x 4 ft double-hung wood windows of average fit that are not weather-stripped. The wind is 23 mph and normal to the wall with negligible pressurization of the room.
The motor draws in the cable at c with a constant velocity of vc= 4 m/s. The moto draws in the cable at D with a constant acceleration of aD=8 m/s^2. If vD=0 when t=0, determine: a) the time needed for block A to rise 3 m b)the relative velocity of b..
The distribution coefficient of styrene distributed between ethylbenzene and ethylene glycol at 25 degrees C is .19 mass fraction in the ethylene glycol phase per mass fraction in the ethylbenzene phase.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd