Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
Beam BD has a flexural rigidity of E1 and length 2L. The beam is rigidly attached to a fixed wall at end B. with end D being supported by a rod of length L, Young's modulus E and crosssectional area A. A line load and a couple act on the beam. as shown. Using Castigliano's method. determine the load carried by the rod in supporting the beam.
Estimate the hourly production and unit cost of rock excavation by drilling and basting. The rock is limestone having a seismic velocity of 6000 ft/s. Trial blasting indicates that 3" holes drilled in 12 ft.
determine the width of the flume to be used such that the depth of flow immediatly upstream of the throat under design conditions is 1 m. By what percentage is the capacity of the flume reduced if the downstream depth is 0.85m
Water from a lower reservoir (water surface elevation) 500 m is pumping to the upper reservoir (water surface elevation 600 m) through a 5000 m long straight pipe with 0.5 m diameter.
For the fully developed flow of water in a smooth 0.15-m pipe at a rate of 0:006m3/s, determine the thickness of a. the laminar sublayer; b. the buffer layer; c. the turbulent core.
The geometry of the rod assembly is given as a=2.8 m, b=0.950 m, c=1.00 m, and d=0.600 m. Neglect the weight of the rod. The journal bearing supports the rod in such a manner that it is free to rotate in the Z-direction.
A circulatr concrete column with a diameter of 8" has spiral reinforcing. Find the capacity of the column with 1% reingforcement. Find the capacity of the column with 8% reinforcement.
A space is at a temperature of 75 F, and the relative humidity is 45 percent. find the partial pressures of the air and water vapor
Water, initially dry saturated vapour at 4 bar, lls a closed rigid con- tainer. The water is heated until its temperature is 400C. Determine the work done and the heat transfer.
A drilling engineer wishes to support pipes of length L on blocks so that the magnitude of the bending moment in the pipes directly over the supports is equal to the magnitude of the bending moment at the center of the pipes.
An unconfined, gravel-sand aquifer has a porosity of 0.23, and a hydraulic conductivity of 1000 m/day. Two monitoring wells are 260 m apart, and the difference in their water levels is 0.3 m.
After compaction the void ratio is reduced to 0.60. Determine: (a) Dry and moist unit weights before and after compaction (b) Degree of saturation after compaction.
The slope distance and zenith angle measured from point P to pointQ were 1876.253m and 87.33'24 degrees, respectively. The instrumentand rod target heights were equal. If the elevation of point P is227.965m, above datum, what is the elevation of poin..
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd