Determine the irr for each outcome for each project

Assignment Help Other Engineering
Reference no: EM13219043

  1. Three projects are considered, as follows:

Project 1

 

Optimistic

Expected

Pessimistic

Initial investment

$250,000

$270,000

$290,000

Annual O&M costs

$70,000

$74,000

$77,000

Annual revenue

$120,000

$110,000

$100,000

End of life salvage value

$25,000

$5,000

-$5,000

Project life

8 years

8 years

8 years

Interest rate

5%

6%

8%

Project 2

 

Optimistic

Expected

Pessimistic

Initial investment

$210,000

$250,000

$290,000

Annual O&M costs

$60,000

$70,000

$80,000

Annual revenue

$200,000

$160,000

$130,000

End of life salvage value

$45,000

$15,000

-$2,000

Project life

8 years

8 years

8 years

Interest rate

5%

6%

8%

Project 3

 

Optimistic

Expected

Pessimistic

Initial investment

$350,000

$400,000

$450,000

Annual O&M costs

$100,000

$130,000

$160,000

Annual revenue

$280,000

$250,000

$200,000

End of life salvage value

$50,000

$25,000

$0

Project life

8 years

8 years

8 years

Interest rate

5%

6%

8%

Find the NPV for each estimate for each project in the table above.

  1. For the same set of project data (question 1) determine the IRR for each outcome for each project.
  2. For the same set of three potential projects (question 1), develop a table of alternative combinations of projects based on the expected values of each project.
    a. Identify the combinations of projects which are permissible if the initial investment budget limit is: $550,000.
    b. For the alternatives which satisfy the budget limit criterion, perform a Present Value of incremental investment analysis to determine the preferred alternative. Interest rate is 6%.
    Duration is 8 years.
  3. For the same set of three projects (question 1) determine the project which would be selected usingthe following project slection criteria. The probablity of the outcomes are as described in the table below.

Criterion

Optimistic

Expected

Pessimistic

Probability

0.2

0.6

0.2

a. Expected value criterion.

b. Maximax criterion.

c. Laplace criterion.

  1. In 1984 a particular machine of capacity x cost $35,000. Estimate the cost of a similar machine with capacity 1.25x in 1990, using the Producer Price Index, table 3.5. Use a power law parametric estimation relationship with m = 0.65.
  2. Consider the project described by the parameters described below.

Initial investment

$250,000

Annual O&M costs

$70,000

Annual revenue

$120,000

End of life salvage value

$25,000

Project life

8 years

Interest rate

5%

Find the sensitivity of the NPV of this project to variations of BOTH end of life salvage value (salvage values of $5,000, $10,000, $15,000, $20,000, $25,000) and interest rate (calculate for interest rates of 4%, 8%, 12%, 16%, 20%). Both sets of variations operate simultaneously; i.e. a matrix of results is expected.

  1. A tool costs $15,000 to buy and in five years is estimated to have a salvage value of $500. Annual fixed costs are $1,700. The cost of consumables per hour of operation is $83.50 and the operator costs $62.00 per hour. Interest is 7.5%. The cycle time per unit of production is 0.01 hours. Determine the cost contribution of the machine in the manufacture of units if annual production is:
    a. 20,000 units.
    b. 60,000 units.
    c. 150,000 units.
    d. 200,000 units.
    e. Determine the total cost per unit of production for each of the above production quantities.  

You are considering a design with two alternatives. Interest is 10%.
Alternative A has parameters: Initial cost $48,000; Cost of maintenance in the first year $950; Annual increase in the cost of maintenance $1,050; Annual operating costs $3,100; Salvage value at the end of each year is 75% of the salvage value at the end of the previous year.

Alternative B has parameters: Initial cost $45,000; Cost of maintenance in the first year $1,300; Annual increase in the cost of maintenance $1,250; Annual operating costs $3,700; Salvage value at the end of each year is 70% of the salvage value at the end of the previous year.

Download:- Assignment.rar

Reference no: EM13219043

Questions Cloud

Do production function exhibits increasing productivity : Sweetgrass Radiology Labs has a fixed amount of radiology equipment. The laboratory can hire any number of radiology technicians per hour to produce radiographs, which are displayed on a screen. The relationship between the number of technicians h..
Calculate the eb/no versus pe waterfall plot : Using 4 PSK or 2 PSK with the same total power as a reference, calculate the Eb/No versus Pe waterfall plot and compare the asymptotic coding gain of the coder/encoder.
What price would you try to negotiate : Suppose you are the supplier and can produce 20 units now but cannot start production on the second 20 units for two months. What price would you try to negotiate for the last 20 units?
Presidential power conditional : Why is presidential power conditional - that is why is it affected so substantially by circumstances, the makeup of Congress, and popular support?
Determine the irr for each outcome for each project : Determine the total cost per unit of production for each of the above production quantities and for the alternatives which satisfy the budget limit criterion, perform a Present Value of incremental investment analysis to determine the ..
How the cell potential has been affected in the nh3 : How the cell potential has been affected in the NH3 or Na2S had been added to the 1M CuSO4 solution instead of the 0.001M CuSO4 solution of the cell? Explain.
What will be the cost of such a subsidy to the government : The government introduces a subsidy s=10 per unit of sugar exported and at the same time it doesn't let any imports in. Calculate the new (i) domestic price, consumption and production, (ii) world price and quantity exported by the country. What w..
What would be a tariff-equivalent quantitative restriction : In a small country, there is a single firm producing good X. The local demand curve is given by P=100-Q. The firm's marginal cost curve is MC=2Q. The world price of good X is Pw=30. a) In free trade, what will be the domestic production of good X.
Which one of the following statements is correct : Which one of the following statements is correct?

Reviews

Write a Review

Other Engineering Questions & Answers

  Characterization technology for nanomaterials

Calculate the reciprocal lattice of the body-centred cubic and Show that the reciprocal of the face-centred cubic (fcc) structure is itself a bcc structure.

  Calculate the gasoline savings

How much gasoline do vehicles with the following fuel efficiencies consume in one year? Calculate the gasoline savings, in gallons per year, created by the following two options. Show all your work, and draw boxes around your answers.

  Design and modelling of adsorption chromatography

Design and modelling of adsorption chromatography based on isotherm data

  Application of mechatronics engineering

Write an essay on Application of Mechatronics Engineering

  Growth chracteristics of the organism

To examine the relationship between fermenter design and operating conditions, oxygen transfer capability and microbial growth.

  Block diagram, system performance and responses

Questions based on Block Diagram, System Performance and Responses.

  Explain the difference in a technical performance measure

good understanding of Mil-Std-499 and Mil-Std-499A

  Electrode impedances

How did this procedure affect the signal observed from the electrode and the electrode impedances?

  Write a report on environmental companies

Write a report on environmental companies

  Scanning electron microscopy

Prepare a schematic diagram below of the major parts of the SEM

  Design a pumping and piping system

creating the pumping and piping system to supply cool water to the condenser

  A repulsive potential energy should be a positive one

Using the data provided on the webvista site in the file marked vdw.txt, try to develop a mathematical equation for the vdW potential we discussed in class, U(x), that best fits the data

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd