Determine the incremental areas and pipe lengths

Assignment Help Other Engineering
Reference no: EM131607237

Portfolio

Q1

The annual maximum daily rainfall at a hydropower station is provided below.
a) Estimate the parameters of the log-normal and GEV distributions by the method of moments.
b) Plot the empirical cumulative distribution using Weibull formula.
c) Superimpose on the plot the two fitted distributions.
d) Estimate the quantiles (maximum daily rainfall) corresponding to return periods of 5, 10, 20, 50, 100, 200, 500, 1000 years using both fitted distributions, and show the points on the plot.
e) Use Kolmogorov-Smirnov test to select the preferred distribution.

Table Q1: Maximum daily rainfall data

Year

Rain

Year

Rain

Year

Rain

Year

Rain

1917

394

1942

588

1967

501

1992

1075

1918

432

1943

625

1968

389

1993

276

1919

403

1944

553

1969

406

1994

325

1920

1153

1945

491

1970

465

1995

423

1921

494

1946

580

1971

906

1996

498

1922

682

1947

660

1972

589

1997

1031

1923

597

1948

366

1973

808

1998

437

1924

884

1949

932

1974

415

1999

623

1925

505

1950

655

1975

419

2000

481

1926

375

1951

666

1976

471

2001

529

1927

614

1952

520

1977

463

2002

485

1928

832

1953

357

1978

567

2003

561

1929

663

1954

590

1979

997

2004

556

1930

332

1955

467

1980

513

2005

942

1931

532

1956

535

1981

754

2006

439

1932

480

1957

496

1982

686

2007

305

1933

503

1958

668

1983

530

2008

473

1934

438

1959

527

1984

569

2009

537

1935

410

1960

577

1985

780

2010

729

1936

344

1961

447

1986

867

2011

377

1937

1062

1962

961

1987

671

2012

844

1938

425

1963

497

1988

448

2013

521

1939

746

1964

629

1989

513

2014

430

1940

456

1965

404

1990

723

2015

559

1941

802

1966

657

1991

428

2016

585

Q2

A water resources project is to be located in Weipa (12.6493° S, 141.8470° E). Use ARR2016 to provide the following information.

a) Determine the rainfall depth for 5% AEP of 1 hour duration.
b) Show a table of the 10 temporal patterns for 1-hour duration corresponding to AEP in a).
c) Draw the 10 histograms of 5% AEP design storm.
d) Derive the 5-min Snyder Unit Hydrograph for a 30 km2 catchment where the main stream length is 5 km and the distance from the point on the stream nearest to the centroid to catchment outlet is 2 km. Assume Ct=0.6 and Cp=0.8.
e) Assuming an initial loss of 20 mm and continuing loss of 6 mm/h, prepare a table of net rainfall for the design storms.
f) Route the net rainfall hyetographs to the catchment outlet using the unit hydrograph derived in d).
g) Show the hydrographs on the same plot and indicate the average of the ensemble hydrographs.

Q3

Measured flows at an upstream and downstream section of a river are given below.

a) Select the best combination of Muskingum coefficients of X from the set (0.1, 0.2, 0.3, 0.4, 0.5) and K from the set (30, 35, 40, 45, 50) that best fit the data based on minimum sum of squared residuals.

b) New upstream section flow is given in the table below. Estimate the hydrograph at the downstream section using the optimum X and K values.

c) On the same plot show the upstream and downstream sections' flows of the new data.

Table Q3: Flows

Time (min)

Upstream Flow (m3/s)

Downstream Flow (m3/s)

New Upstream Flow (m3/s)

0

10.0

10.0

10.0

30

10.0

10.0

10.0

60

25.0

12.2

13.0

90

45.0

23.4

15.0

120

31.3

35.1

20.0

150

27.5

32.1

25.0

180

25.0

28.8

30.0

210

23.8

26.2

35.0

240

21.3

24.3

45.0

270

19.4

22.1

40.0

300

17.5

20.0

38.0

330

16.3

18.3

32.0

360

13.5

16.6

25.0

390

12.1

14.4

20.0

420

10.0

12.6

18.0

450

10.0

11.0

15.0

480

10.0

10.3

13.0

510

10.0

10.1

10.0

540

10.0

10.1

10.0

570

10.0

10.0

10.0

600

10.0

10.0

10.0

Q4

The runoff hydrographs from a site before and after development are given below. The post development detention basin is to be drained by an outflow weir. The elevation versus storage in the detention basin is given below. The weir crest is at elevation 0.0 m, which is also the initial elevation of the water surface in the detention basin prior to runoff. The performance characteristics of the weir is given by

Q = 1.83BH3/2

where Q is the overflow rate in m3/s, B is the crest length in m, and H is the head on the weir in m.

a) Plot the performance characteristics curves of the reservoir and outlet structure required by the PULS Method of reservoir routing.

b) Determine the optimum (most economical) crest length (B, to the nearest 5 mm) of the weir for the detention basin to operate at its full capacity.

Table Q4.1: Before and after hydrographs

 

Time (mins)

Runoff

Before (m3/s)

After (m3/s)

0

0.00

0.00

30

2.00

3.50

60

7.50

10.60

90

1.70

7.50

120

0.90

5.10

150

0.75

3.00

180

0.62

1.50

210

0.49

0.98

240

0.30

0.75

270

0.18

0.62

300

0.50

0.51

330

0.00

0.25

360

0.00

0.12

390

0.00

0.00

Table Q4.2: Detention basin elevation versus storage data

Elevation (m)

Storage (m3)

0.0

0

0.5

11022

1.0

24683

1.5

41522

Q5

A stormwater drainage system located in Weipa is to be designed for a new development. The proposed pipeline segments (links) and manholes (nodes) are shown in the figure below.

a) Upload the image of the catchment provided into XPSWMM. Note that the Real World Extents of Top: 6880800 m; Left: 460000 m; Bottom: 6880500 m; Right: 460500 m.

b) Digitise the incremental catchment boundaries, nodes and links using XPSWMM. Attach an image of the digitised information on the background image.

c) Determine the incremental areas and pipe lengths. Prepare two tables with headings below in XPSWMM and export for your report.

Table Q5.1: Sub-catchments

Name

Node Name

Area (ha)

1

 

 

2

 

 

3

 

 

4

 

 

5

 

 

6

 

 

7

 

 

Table Q5.2: Nodes and Links

Link Name

Upstream Node

Downstream Node

Length (m)

1-2

 

 

 

3-2

 

 

 

4-2

 

 

 

2-5

 

 

 

6-5

 

 

 

5-7

 

 

 

13_Figure.jpg

Verified Expert

This paper is prepare in hand written and Microsoft word file. This assignment have been prepare for water resource engineering problems and solution. The solution is based on the quantity of rainfall occur in area of Australian catchment and sub catchment areas. There is also provide hydrology graphs and solution for given data base of rainfall. The problem have been solved in excel and by formula of excel and reference in APA format.

Reference no: EM131607237

Questions Cloud

Define the scope of the project and how scope will managed : Define Scope and produce a Scope Management Plan - Define the scope of the project and detail how the scope will be managed
Some of collection-concentration and disbursement techniques : Explain how firms manage their cash and identify some of the collection, concentration, and disbursement techniques used.
Define cherry hill teen gets probation in non-fatal stabbing : the article Cherry Hill Teen Gets Probation in Non-Fatal Stabbing, Do you feel that the sentence was appropriate
Calculate the gravitational force on a mass at the point : A uniform, thin, circular disk of radius a and mass M lies on a horizontal plane. The point P lies a distance y directly above O, the center of the disk.
Determine the incremental areas and pipe lengths : ENEC14017 Water Resources Engineering - Determine the rainfall depth and Draw the 10 histograms - Estimate the hydrograph
Findings from the learning activity : Discuss some examples of your findings from the learning activity, After watching several films over your lifetime
How politics has influenced health care economics : Identify and analyze how politics has influenced health care economics in the non-U.S. based model you chose.
The age of social media and smartphones : Describe how the Watergate events changed American views toward politics and politicians.
When is it most valuable to preserve a plant species : When is it most valuable to preserve a plant species? How does collection size relate to efficiency of management of the collection?

Reviews

inf1607237

10/5/2017 6:01:42 AM

Thank you very much for all your support. This was my 1st assignment and beyond my expectation I scored really good grade in my paper. As promised I have given you 3 more of my assignments and wish the same result for these next assignments. Thank you so much :-)

inf1607237

10/5/2017 5:57:34 AM

Please along with the solution please send reference material, subject note, textbook or lecture note of this assignment. Also include ARR2016 Data base for Question 2 and XPSWMM .exe set up for solution. Actually we don's know anything regarding the project This is my cqu login details please check if any queries Student id : ******** Pswd : ####### @Please ask the expert to do it as per his/her understanding and send us the draft in shortest time possible to do the remaining payment.

inf1607237

9/27/2017 5:41:35 AM

This was a nice work, though i thought that i won't get it in the prescribed time limit but you gave me the solution early and i'm very much thank full for your effort. Thanks

Write a Review

Other Engineering Questions & Answers

  Explain how the microstructures given had formed

Explain how the microstructures above had formed. Assume that the eutectoid diagram has the At C = 0%, A3 = 900°C coordinates.

  Draw a gate diagram for the circuit implementing

Simplify the product of sums to give the expression with the fewest literals. Show your work. Draw a gate diagram for the circuit implementing F, based on your simplified expression

  In a program for the core two microprocessor operating

29) Suppose that DS = 1000H, SS = 2000H, BP = 1000H, and D1 = 0100H. Determine the  Memory address accessed by each of the following instructions, assuming real mode Operation:

  Construct the duobinary coder output-corresponding

The binary data stream 001101001 is applied to the input of a duobinary system. (a) Construct the duobinary coder output and corresponding receiver output, without a precoder.

  How the standards manage the quality

Compare between ISO9001:2008 and ISO9001:2015. how the standards manage the quality in it.

  Plot frequency-gain dependence plot using plotting software

Write a report that summarizes this experiment. Your report brief must include: Plot the frequency-gain dependence plot using a plotting software (such as excel) and include it in your lab report.

  C program that displays your name and address

1.Convert the following to a do/while loop. It should produce exactly the same output.

  Define what is meant by a process in a process model

Define what is meant by a process in a process model. How should the process be named? What information about a process should be stored in the CASE repository?

  What transistor biasings importance to transistor circuit

Discuss what "transistor biasing" means and its importance to transistor circuit design. Choose one type of biasing, and explain either how it works or its advantages and disadvantages.

  Barker spectrum-convolution

Porblem-1. Barker Spectrum-Derive analytically the spectrum of the Barker code (11 chips)

  Explain why a trickling filter is used in the plant

Write a one-page memo that explains what you saw and the reasons behind some of the processes that were conducted within the plant. For example, if you saw trickling filters, explain why a trickling filter is used in the plant.

  Calculate the oil flow rate into the well

Calculate the oil flow rate into the well (bbl/D), if the bottomhole(well) pressure is 1800 psi and what is the value of skin factor?

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd