Determine the horizontal components of the forces necessary

Assignment Help Civil Engineering
Reference no: EM13307916

A 6 foot diameter pipleine carries water at a temperature at 60F at a steady flow rate of 60 cubic feet per second. The pipeline makes a 90 degree horizontal bend. The pressure at the beginning of the bend is 80 pounds per square inch. The pressure at the end of the bend is 78 pounds per square inch. Determine the horizontal components of the forces necessary to hold the bend in place.

Reference no: EM13307916

Questions Cloud

What has been the change in internal energy of the gas : A cylinder with a moveable piston holds .20 lb of hydrogen initially in a volume of 1 cu ft at a tem-perature of 1300 F. Then the volume is expanded to 2.5 cu ft while the gas pressure remains constant.
Terms of diversity : Description: Write a report about your workplace analysing it in terms of diversity. Convince your manager to develop a "Diversity Management Strategy" by explaining the advantages of having such a strategy. Support your argument with evidence, resea..
What volume of leachate is being added to the river each day : A landfill is located 500 km from a river whose surface elevation is 40 m lower than the ground elevation at the landfill. After several years it is discovered that leachate from the landfill, with a COD of 1300 mg/L, is leaking into the river.
Why do companies fail at risk management : Why do companies fail at risk management? In responding to the question, draw from your own experiences, the text, the topic notes, the additional readings, and/or any additional sources that you research and cite.
Determine the horizontal components of the forces necessary : The pressure at the end of the bend is 78 pounds per square inch. Determine the horizontal components of the forces necessary to hold the bend in place.
What would be the volume of the balloon if it were submerged : At a birthday pool party, the temperature is 29.50 C and the atmospheric pressure is 765.4 mmHg. One of the decoration helium balloons has a volume of 6.25 L.
Early earth was being bombarded by meteorites : Early earth was being bombarded by meteorites, comets, and asteroids. was early earth an open or closed system?
Every product or service has a buying process, : Every product or service has a buying process, even digital products and services. In this assignment, you will research and analyze the buying process for an online product or service, with which you (as a consumer) are familiar, from a business poi..
How many years do these bonds have left until they mature : Backwater Corp. has 6 percent coupon bonds making annual payments with a YTM of 5.5 percent. The current yield on these bonds is 5.85 percent.

Reviews

Write a Review

Civil Engineering Questions & Answers

  Find the depth and change in water surface elevation caused

Water is flowing at a depth of 10 ft with a velocity of 10 ft/s in a channel of rectangular section. Find the depth and change in water surface elevation caused by a smooth upward step in the channel bottom of 1 ft.

  What is the amplitude of the vertical vibration

if the enginer is mounted floatiing on very weak spring, what is the amplitude of the vertical vibration of the engine? (b) if the engine is mounted solidly on a rigid foundation, what is the alternating force amplitude transmitted? Assume the con..

  At what coupon interest rate will yield a nominal interest

At what coupon interest rate will a $20,000 bond yield a nominal 12% interest compounded quarterly if the purchaser pays $18,000 and the bond becomes due in 20 years

  Explain how to compute the disclosure and elevation of a

Reciprocal leveling gives the following readings in feet from a setup near A: on A, 2.071; on B, 8.254, 8.259 and 8.257. At the setup near B: on B, 9.112; on A, 2.926, 2.930 and 2.927. The elevation of B is 1099.600. Compute the disclosure and ele..

  Calculate mass of sludge wasted each day for sludge system

A wastewater treatment plant has a flow of 35,000 m3/day. Calculate the mass of sludge wasted each day (QwXw, expressed in kg/day) for an activated-sludge system operated at a solids retention time (SRT) of 5 days

  Compute the parts of the curve including t-l-lc-e-m and d

A simple horizontal curve of radius 750 ft connects two tangents that intersect at an angle of 66º30'. Compute the parts of the curve, including T, L, LC, E, M, and D.

  Determine how high of a signal source impedance can exist

How high of a signal source impedance can exist and still provide an output signal from an inverting amplifier circuit. Explain

  How much horizontal distance is there from prism to point a

using a prism and prism pole in conjunction with a total station, the bottom of the prism pole is placed on point A. the distance from the bottom of the prism pole to the center of the prism (HR) is 4.97 feet.

  Calculate the fuel load density and the opening factor

A hotel room has a floor area of 10 m by 4 m and is 2.5 high and has a window which is 1.6 m high and 3 m wide. The room contains some furniture and other commodities containing 50 kg polyurethane with 25 MJ/kg and 350 kg wood with 18 MJ/kg.

  Which method would be most likely to have the conductivity

If an analysis is made of the hydraulic conductivity of a site using permeameter tests of core samples, slug tests of monitoring wells, and pumping tests of production wells, it is often observed that the hydraulic conductivity as measured by each..

  Determine annual volume of solid waste produce by source

the bailey stone works employs six people. assumming that the density of uncompacted waste is 480 kg/m^3, determine the annual volume of solid waste produce by the stone works assumming a waste generation rate of 1 kg/cap*d.

  What will be discharge delivered from the upper reservoir

A reservoir at elevation 700 ft will supply a second reservoir at elevation 460 ft. The reservoirs are connected by 1300 ft of 24-in cast-iron pipe and 2000 ft of 20-in cast iron pipe in series. What will be the discharge delivered from the upper ..

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd