Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
The pipe can be assumed roller supported at its ends and by a rigid saddle C at its center. The saddle rests on a cable that is connected to the supports. Determine the force that should be developed in the cable if the saddle keeps the pipe from sagging or deflection at its center. The pipe and fluid within it have a combined weight of 125lb/ft. EI is constant.
Using 1630.56 kN as the ultimate capacity determine the diameter of a drilled shaft pile that would have the same ultimate capacity and depth embedment (11.5 m) using the FHWA method. Neglect shaft resistance. Use a F.S. of 2
Writing case study about bridge collapse
A concrete box girder bridge has the rectangular x-section. The box is prismatic and considered thin-walled. It span is L=48m and simply supported at points A,B,C and D. The supports are assume to be able to transfer tensile forces.
a moist soil has a total unit weight of 110 pcf and a water content of 6 percent. assuming that hte dry unit weight is to remain constant , determine how much water , in gallons per cubic yard, must be added to increase the water content to 12 per..
An object is thrown downward from a 150-ft cliff with a velocity of 45m/hr so that it makes an angle of 60° with vertical face of the cliff.
If the evaporation rate from an open water surface is 0.27 inch/day in Tucson Arizona, what should be the surface area of the lagoon? (Note: arsenic does not evaporate but remains in the liquid water)
A horizontal curve is designed for a two-lane road in a mountainous terrain. The following data are known: Deflection angle: 40 degrees Tangent: 436.76 Station of PC: 2695 + 73.89 Side friction factor = 0.12 Superelevation = 8% Superelevation run-off..
Formulate a Linear Program for Blend Mix at Bluegrass Distillery, The Bluegrass Distillery produces custom-blended whiskey
Find the area of steel reinforcement required for a concrete T-beam for the following data; f'c = 3 ksi, fy=60 ksi,d=18 in, t= 4.5 in., bw= 10 in., bf= 36 in., 3/4" aggregate, and the section sustains a total factored bending moment 82 k-ft.
A 1kg ball is dropped from the top of a cliff and falls with a constant acceleration due to gravity. Assume that effects of air resistance can be ignored.
After falling from rest from a height of 32 m, a 0.45 kg ball rebounds upward, reaching a height of 22 m. If the contact between ball and ground lasted 1.5 ms, what average force was exerted on the ball?
Compute the seepage velocity and estimate the hydraulic gradient in the aquifer if the porosity of the soil is 42%.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd