The fresh feed to an ammonia production process contains nitrogen and 75% excess hydrogen in stoichiometric proportion, along with an 1.0 mole % inert gas (I). The feed is combined with a recycle stream containing the same three species, and the combined stream is fed to a reactor in which a 47% single-pass conversion of nitrogen is achieved. The reactor effluent flows to a condenser. A liquid stream containing essentially all the ammonia formed in the reactor while gas stream (75 mol/h) containing inert and the unreacted nitrogen and hydrogen leave the condenser. the gas stream is split into two fractions with the same composition: one is removed from the process as a purge stream (10% from the total gas stream), and the other is the recycle stream combined with fresh feed.
1) for a basis of 100 mol/h, calculate the mol fraction of nitrogen and hydrogen at fresh feed stream
2) Determine the flowrate (mol/h) for recycle and purge stream
3) Determine the flowrate (mol/h) for combined stream (reactor inlet stream) and the composition for all species in that stream
4) Determine the flowrate (mol/h) for each species in the reactor outlet stream. nest calculate the production rate of ammonia leaving the condenser
5) Determine the extent of reaction in the reactor.
6) Determine the overall conversion of nitrogen for the above system.
natural gas at 70 f and standard atmospheric pressure of 14.7 psi is compressed isentropically to a new absolute
air with a dry bulb temperature of 22c and a relative humidity of 60 percent is contained in a
hot water flows through a pvc k.092 wmk pipe whose inner diameter is 2 cm and outer is 2.5 cm. the temperature of the
in a preliminary design for a mail-sorting machine parcels moving at 2 fts slide down a smooth inclined ramp and a
A project that will cost $750,000 will require payments as certain milestones are met. The initial payment is $50,000. When 30% of the work is complete an additional payment of $200,000 is due. When 70% of the work is complete another payment of $..
a household refrigerator that has a power input of 450 w and a cop of 2.5 is to cool five large watermelons 10 kg each
a particular house wall consists of three layers and has a surface area of 30 m2. the inside layer is 10 mm thick and
The bending moment M at position x m from the end of a simply supported beam of lenght L m carrying a uniformy distributed load of w Kn m-1 is given by
steam expands isentropically from 2 mpa and 500 k to a final state in which the quality is 0.90. determine the final
air at 20 c 40 rh is mixed adiabatically with air at 40 c 40 rh in the ratio of 1 kg of the former to 2 kg of latter
refrigerant 134a is the working fluid in a solar power plant operating on an ideal rankine cycle. saturated vapor x11.0
an ideal carnot heat engine has an efficiency of 40. if the high temperature is raised 15 what is the new efficiency
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd