Determine the final velocity of each car

Assignment Help Civil Engineering
Reference no: EM13532255

At an amusement park there are 200-kg bumper cars A, B, and Cthat have riders with masses of 40 kg, 60 kg, and 35 kgrespectively. Car A is moving to the right with a velocityvA = 2 m/s and car C has a velocity vB= 1.5m/s to the left, but car B is initially at rest. The coefficient ofrestitution between each car is 0.8 . Determine the final velocityof each car, after all impacts, assuming (a) cars A and C hit Car Bat the same time, (b) car A hits car B before car C does.

Reference no: EM13532255

Questions Cloud

Determine the bending moment at the bottom of its pole whose : Also determine the bending moment atthe bottom of its pole whose height from the graound to the bottomof the sign is 1.5 m. Disregard the drag on the pole.
Hold the cratefrom sliding down the plane : It is desired to obtain dynamic similarity between 3 cfs of water(ρ = 1.94 slug/ft3, μ= 2.735 x 105Ibs/ft2) flowing in a pipe and oil 9s.g = 0.91, μ=12 x 105 ibs/ft2) flowing in a 12in diameterpipe at a velocity of 25 ft/s at 90 deg F. What size of p..
How much calcium chloride will react with 100mg of soda ash : A 2.5hr long uniform rainfall resulted in arunoff hydrograph that has the shape of an equilateral triangle.The base of the triangle is 64hr; the peak flow is 535cfs; thedrainage area is 5.7mi^2. Determine the corresponding unithydrograph if the base ..
Determine the speed of each disk after the collision and the : Three cylinders from the same mix were tested for strenght.  Cylinders A and B were cast in 4x8 molds while cylinder C was cast in a 6x12 mold.  The total loads were as follows; cylinder A= 65,200 lbs.,  cylinder B= 68,550 lbs., cylinder C= 151,190 l..
Determine the final velocity of each car : The coefficient ofrestitution between each car is 0.8 . Determine the final velocityof each car, after all impacts, assuming (a) cars A and C hit Car Bat the same time, (b) car A hits car B before car C does.
Calculate the average velocity of the flow leaving : Water enters a cylindrical tank through two pipes at rates of 250and 100 gal/min. If the level of water in the tank remains constant, calculate the average velocity of the flow leaving thetank through an 8-in. inside-diameter pipe.
Draw a psychrometric diagram labeling the system states : A laboratory space has a heat gain of 3 tons with a sensible heatfactor of 0.7. The indoor design conditions are 78 F at 40% RH. Theoutdoor air design conditions are 95 F at 50% RH. The coolingequipment has a fixed air flow rate of 350 cfm/ton of coo..
Determine the water level in the upstream manhole that would : A circular manhole cover has a weight of 250 N and a diameter of 1meter. Surcharged conditions (this means the sewer is flowing full)have developed in the sanitary sewer
Define your coordinate system : A trapezoid has a bottom width of b, and top width of T, a heightof h, and side slopes of z(horizontal to vertical). By integration, determine the location of the centroid of thetrapezoid Define your coordinate system.

Reviews

Write a Review

Civil Engineering Questions & Answers

  Determine the external wind pressure acting on the windward

A closed storage building is located on open flat terrain in central ohio. If the side wall of the building is 20ft high, determine the external wind pressure acting on the windward and leeward walls. Each wall is 60ft long.

  Find hp per foot of cutting edge ratio for all 4-conditions

The Caterpillar D6R Series 3 and D8R tractors are rated, respectively, at flywheel horsepowers (fwhp) 0f 185 and 305. The "A," "S," and "SU" blade widths (length) for the D6R are S, 16 ft, 9 in.; A, 17 ft, 1 in

  Determine the change in length and the change in diameter

The acrylic plastic rod is 200mm long and 15mm in diameter. If an axial load of 300N is applied to it, determine the change in its length and the change in its diameter. Ep = 2.70 GPa, Vp = 0.4.

  Determine the quantity of sludge wasted daily

An activated sludge system operates at a flow rate (Q) of 400 m3/day with an incoming BOD (So) of 300 mg/L. Throughout pilot plant work, the kinetic constants for this system are determined to be Y = 0.5 kg SS/kg

  Find what would be the concentration expressed in ppm

If the quantity of ash released from the power plant each minute were to be eventually despersed in 4,000,000 m^3 of air at 25 degrees Celsius and 1 atm, what would be its concentration expressed in ppm

  Determine the torque needed to turn the impeller

A centrifugal pump is used to pump water from ariver. The absolute velocity V2 = 82ft/s is at an angle of 25 degrees to theradial direction. The impeller's thickness is of 1.2 in and r2= 0.86 ft and rotates at a speed of 1250 rpm.

  Question in structure analysis

Determine axial force and Max bending - Question in structure analysis

  Find probability that all twenty calls go through right away

The phone lines to an airline reservation system are occupied 40% of the time. assume that the events that the lines are occupied on successive calls are independent. assume that 20 calls are placed to the airline.

  What is the difference between factor of safety

what is the difference between factor of safety in rankine & coulomb in overturning, sliding and bearing capasity ?

  What will be the depth when the discharge is given

Plot a graph showing the discarge per unit width per unit width q for various depths if the specific energy remains constant at this value. What will be the depth when the discharge is 1/3 of the discharge at critical depth

  Estimate the vertical hydraulic conductivity using the heads

Write Darcy's equation in 2-D. There are three piezometers in an unconfined sand aquifer as shown below. The head measurements at A = 104.56 ft, B = 104.53 ft, C = 103.42 ft. The rate of recharge here is estimated to be 1.25 ft/yr.

  Using newton raphson method determine highest real root of f

determine the highest real root of f(x)= 0.95x^3 - 5.9x^2 +10.9x-6: (a)graphically. (b) using the newton raphson method(three iterations, xi= 3.5). (c) using the secant method(three iterations, xi-1= 2.5 and xi= 3.5).

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd