Process The study of employee effort and other business records to determine the cost of activities. Activity Analysis
The Brite Beverage Company bottles soft drinks into aluminum cans. The manufacturing process consists of three activities:
Mixing: water, sugar, and beverage concentrate are mixed.
Filling: mixed beverage is filled into 12-oz. cans.
Packaging: properly filled cans are boxed into cardboard "fridge packs."
The activity costs associated with these activities for the period are as follows:
Mixing $216,000
Filling 168,000
Packaging 96,000
Total $480,000
The activity costs do not include materials costs, which are ignored for this analysis. Each can is expected to contain 12 ounces of beverage. Thus, after being filled, each can is automatically weighed. If a can is too light, it is rejected, or "kicked," from the filling line prior to being packaged. The primary cause of kicks is heat expansion. With heat expansion, the beverage overflows during filling, resulting in underweight cans.
This process begins by mixing and filling 6,300,000 cans during the period, of which only 6,000,000 cans are actually packaged. Three hundred thousand cans are rejected due to underweight kicks.
A process improvement team has determined that cooling the cans prior to filling them will reduce the amount of overflows due to expansion. After this improvement, the number of kicks is expected to decline from 300,000 cans to 63,000 cans, thus increasing the number of filled cans to 6,237,000 [6,000,000 + (300,000 − 63,000)].
a. Determine the total activity cost per packaged can under present operations. Round to the nearest cent. $ per can
b. Determine the amount of increased packaging activity costs from the expected improvements. $
c. Determine the expected total activity cost per packaged can after improvements. Round to two decimal places. $ per can.
Respond thoughtfully to given prompts in a primary response
: You accidentally received a message outlining your hospital's downsizing plan. - You see that your friend's position will be eliminated. - Respond thoughtfully to the above prompts in a primary response.
|
What were the firms budgeted collections
: Quattro began operations in April of this year. It makes all sales on account, subject to the following collection pattern: 30% are collected in the month of sale; 60% are collected in the first month after sale; and 10% are collected in the second m..
|
Estimate the daily heat loss through the wall
: Assuming quasi steady conditions for which changes in energy storage within the wall may be neglected, estimate the daily heat loss through the wall if its total surface area is 200 m2.
|
How do you feel about illegal recreational drug use
: What do you think might be motivating this 13 year old boy to use marijuana? Provide two different possible reasons. Would the reasons influence the type of drug he may be using? Explain. How do you feel about illegal recreational drug use? Explain.
|
Determine the expected total activity cost per packaged
: Process The study of employee effort and other business records to determine the cost of activities. Activity Analysis Determine the total activity cost per packaged can under present operations. Determine the expected total activity cost per package..
|
Estimate the installed cost of a similar system
: The delivered equipment cost for a fixed-bed carbon adsorption system with a capacity of 5000 acfm was $100,000 in 1994. Estimate the installed cost of a similar system with a capacity of 7500 acfm in 2000.
|
You are ready to incorporate the changes
: You are ready to incorporate the changes that are needed. In addition, you will add at least 2 more components to your presentation to complete the quality-improvement process for this project.
|
Determine the specified property at the indicated state
: For each case, determine the specific volume at the indicated state. Locate the state on a sketch of the T-y diagram.
|
Mainteance-department and personnel department
: George company has two service department mainteance, department, and personnel department, and two producing departments, Y and Z. The maintenance department costs of 120,000 are allocated on the basis of standard service used. The personnel departm..
|