a 2000 m long commercial steel pipe of 200 m diameter converys water at 20 C between two reserviors. the difference in water level between the reserviors is maintained at 50 m. determine the discharge through the pipeline. (neglect the minor losses)

Reference no: EM13306833

Questions Cloud

Write a while or do-while loop : If the user enters a number that is not on the interval, informatively re-prompt until the user enters an appropriate number.
What is the chance of carbon running out on the earth : Deals with the origin of the universe and the Big Bang Theory and what are your thoughts on the origin of the universe and the Big Bang Theory?
Estimate the initial speed of that car assuming a level road : Police investigators, examining the scene of an accident involving two cars, measure 72-m-long skid marks of one of the cars, Estimate the initial speed of that car assuming a level road
What dose equivalent does the patient recieve : A 75 kg patient swallows a 30 micro Ci beta emitter wtih a half life of 5 days. The beta partiles are emitted with an average energy of .35MeV. What dose equivalent does the patient recieve
Determine the discharge through the pipeline : a 2000 m long commercial steel pipe of 200 m diameter converys water at 20 C between two reserviors. the difference in water level between the reserviors is maintained at 50 m.
Find the minimum thickness of the coating required : A Doctor order to prepare a glass for a patient with anti-reflection coating for 400 nm and 700 nm wavelength light. Find the minimum thickness of the coating required for this job
What is the cost of heating energy in dollar per million btu : if gas is available at $0.50 per therm and the efficiency of utilization is 80 percent, what is the cost of heating energy in dollars per million Btu
Analyze a basic set of requirements for a problem : Analyze a basic set of requirements for a problem - compose C language programs and compile a program using Microsoft Visual Studio 2012
Calculate the electrostatic force : In the Bohr theory of the hydrogen atom, an electron,oves in a circular orbit about a proton, where the radius of the orbit is 9.51 A. find the electrostatic force between the two

Reviews

Write a Review

Civil Engineering Questions & Answers

  Design a needle-punched nonwoven geotextile for use

The thickness of geonet is 0.2 inch (5 mm). Assume the maximum inflow rate is 0.14 inch/hour. The liquid head over the geomembrane liner is 2 inches. The index properties of the soil placed over the geotextile are as follows

  Discuss the limitations of the monitoring approach

A passive dosimeter is to be designed for use in obtaining monthly average concentrations of atrazine in a stretch of river. Typical concentrations range from 10 to 50 g/L. Atrazine, a herbicide commonly found in runoff from agricultural lands.

  What is the mass of the earth in pound-mass and kilograms

The Earth may be considered as a sphere whose diameter is 8000 mi. and whose density is roughly approximated to be 6560 kg/m^3. What is the mass of the Earth in pound-mass and kilograms

  How many balloons would it take

To float a 160 pound man using helium balloons (assume 0.52 cubic feet per inflated balloon). How many balloons would it take? Assume density of air is 1.29 kg/cubic meter and the density of helium is 0.179 kg/cubic meter.

  How many milligrams of co2 were released to the atmosphere

You open a 16 oz (1 pint) bottle of a carbonated soft drink that has a temperature of 5°C, then you get distracted and forget to drink it. You come back quite some time later and find that it has gone "flat," and that it has gotten warm (20°C).

  Find the net present worth of the project

find the net present worth of the project,and the internal rate of return ,and the annual worth of the project?

  Concentration of tracer in the reactor

What is the concentration of tracer in the reactor 1 h after tracer addition is terminated? The reactor had an initial concentration of tracer of 1.0 mg/L when tracer addition commenced.

  What is the original estimated duration of the project

The initial schedule called for 500 feet of pipeline to be installed each week, with the total construction cost projected to be $25 million. After 8 weeks, 4750' of pipeline has been installed at a cost of $11.25 million.

  What is the required flow rate of air through the turbine

The power output of the turbine is just 0.1 kW. If the process is adiabatic and steady, what is the required flow rate of air through the turbine if the exit state is 100 kPa and - 53 C.

  Determine the asd reference and adjusted design values

Determine the ASD reference and adjusted design values for the following members and loading conditions. All members are Select Structural Southern Pine and are fully braced to prevent lateral torsional buckling. Bending Occurs about the strong ax..

  Compare total reactor volume require to remove the substance

Compare the total reactor volume required for 90% removal of a substance that decays according to first-order kinetics with a rate constant of 0.05 day -1 in a CM system that contains a single reactor against a system that contains three CM reacto..

  Determine what should the sample volume be

The dissolved oxygen of sample water is 1.5 mg/L. At 25 C, the dissolved oxygen of the dilution water is 8.25 mg/L. You are told the BOD5 of the sample is 130 mg/L. You have a target final dissolved oxygen of 3.0 mg/L (give yourself some leeway).

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd