Determine the cost of lining per metre length of the channel

Assignment Help Civil Engineering
Reference no: EM132132371

Assessment Task

Practical Investigation

Instructions:

- It is very important that you read these instructions.

- The hardcopy of the Assignment report, with the Assignment cover sheet, should be submitted to the Assignment box on the same day.

- This is strictly an individual assignment.

- Question 1 requires selecting reference points from the graph. Each student will choose different reference points to other students.

- For Questions 4-8 each student will be given particular values to use.

- Take note of the criteria for the marking of the assessment tasks.

These criteria include:

Accuracy of Calculations - being aware of accuracy required and applying of problem solving is shown and methods and accurately and consistently.

Problem solving - evidence assumptions are clearly explained

Use of Technology - this needs to be used appropriately and evidence clearly given.

Quality of Analysis and Conclusions - results of calculations are to be analysed and conclusions drawn.

Presentation of the Report - the report should be presented clearly as for a minor project: Introduction/ Conclusions/ Headings/subheadings/ diagrams/ graphs/ tables/ correct labelling etc

Practical Investigation Part 2

The channel has a cross-section in a form of a parabola. The maximum width of the channel at the existing ground level as shown in Figure 2 is W metres.

2149_figure.jpg

1. Determine the depth of the channel below the existing ground level if the minimum cross section area of the channel (below ground level) is A m2 and hence determine the channel x-section profile equation.

2. The excavated earth is used for the embankments alongside the channel. The cross section of the embankments as shown in Figure 2 is in the form of a symmetrical trapezium. The sides of the trapezium are tangential to the excavated channel at the ground level. The width of the top of the trapezium is t metres. Determine the height of the trapezium.

3. The maximum safe flow capacity of the channel is when the channel is full up to 0.7 of the full height of the channel. Determine the maximum safe area for the safe flow.

4. To reduce the scouring of the channel and the water seepage, it is suggested to use a lining material to the full height of the channel. If the lining material costs around $40.00 per square metre, determine the cost of lining per metre length of the channel.

5. If the cost of excavation is $12 per cubic metre, the cost of constructing the embankment is $15.00 per cubic metre and the cost of the lining material is $40.00 per square metre, suggest an alternative profile for the channel x-section with less cost. The only constraints are the overall width of the channel should not be more thanmetres and the minimum cross sectional area for the water flow is A SQM.

Verified Expert

The particular assignment is given with 4 questions. The basic equations in mathematics are used to calculate the height of the channel as well as the trapezium. The cost per lining is also calculated. And based on a the width increased method, how cost can be reduced is well shown in the project.

Reference no: EM132132371

Questions Cloud

Xyz company handbook explicitly states : This is an expense that the XYZ company handbook explicitly states that it doesn't cover. Should XYZ company cover the line item or not? Explain your answer.
What are the pros and cons of narrow span in management : What are the pros and cons of narrow span in management?
Explain how understanding your personal learning style : Explain how understanding your personal learning style can assist you when identifying, evaluating and selecting development opportunities.
Participate in an implementation process : What could an organisation do to encourage workers to participate in an implementation process?
Determine the cost of lining per metre length of the channel : Determine the depth of the channel below the existing ground level if the minimum cross section area of the channel (below ground level) is A m2 and hence
What is the total interest of a periodic deposit : What is the total interest of a periodic deposit of 2000 made at the end of each compound period if the interest rate is 6% and the number of periods is 10
Evaluate how to effectively execute your plan : You are the head of HR and the leaders of your organization just approached you to restructure the sales team.
What is the purpose of the control function : What is the purpose of the control function within an organization? What is the difference between bureaucratic, market, and clan control?
Analyse application of the updated remuneration principles : Critically analyse the application of the updated remuneration principles on the resolution of agency conflicts

Reviews

urv2132371

11/26/2018 1:31:48 AM

Best in class assignment service with top in town experts for assignment and best in class service. Awsome work by an experienced expert thank u so much.

Write a Review

Civil Engineering Questions & Answers

  Engineering ethics and ethical issue

what is the engineering ethics course where to write about any engineering ethical case and discuss the ethical issue?

  Engineering ethics and concept and cases

what is the engineering ethics case related to civil engineering with reference and discuss all the engineering ethics issues which covered the "Engineering etics concepte and cases?

  Transportation and management

In the construction management, there is a lot of procurement route that are necessary and suitable for the construction industry.

  Supporting Investment Promotion: ERNST & YOUNG

Ernst & young is currently providing support to various sectors. In this regards it was felt that if this report is able to document good practices currently being adopted or planned in ceramic sector.

  Personalized Cancer Therapy-A step forward

Cancer is the uncontrolled growth of abnormal cells in the body resulting in tumours that can be benign or malignant (cancerous cells). A proper treatment is necessary to fight with this serious disease.

  Discuss the different environmental companies

Discuss the different agencies, institutes, centers, different environmental companies that are active in UAE.

  Develop a simple urban constructed wetland design

Develop a simple urban constructed wetland design.

  Evaluate company performance in relation to GRI standards

Evaluate company performance in relation to GRI standards and comment on Stigler's theory.

  Water system design

Determine the corresponding error in the computed discharge

  Hydraulic behaviour in open channel

Describe how test flumes and associated equipment are used to assess and confirm hydraulic behaviour in open channel

  Write a paper on steel sustainability

Write a paper on steel sustainability.

  Writing case study about bridge collapse

Writing case study about bridge collapse

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd