Determine the corresponding unit hydrograph for channel

Assignment Help Civil Engineering
Reference no: EM13319996

A 2.5 hr long uniform rainfall resulted in runoff hydrograph that has the shape of an equilateral triangle. The base of the triangle is 64 hr; the peak flow is 535 cfs; the drainage area is 5.7 mi^2. Determine the corresponding unit hydrograph if the base flow for the channel is 10 cfs.

Reference no: EM13319996

Questions Cloud

Emotional and disciplinary disorders : Tom Pearson has a child who has emotional and disciplinary disorders
Determine maximum possible precipitation at new york city : Determine the maximum possible precipitation at New York City that may be encountered on a 100 mi^2 drainage area over a 96 hr period.
Determine what discharge is available half of the time : By continuous discharge measurements the discharge in stream was determine over a 3-year period. After the data were assembled, it was found that the discharge exceeded 120 cfs 3 percent of the time;
Determine the corresponding flood peak of the runoff : A 300-acre forested watershed in fair hydrologic condition located on the clayey flat coastal region of Southern California receives 4.0 in. of rain in a 24 hr period.
Determine the corresponding unit hydrograph for channel : A 2.5 hr long uniform rainfall resulted in runoff hydrograph that has the shape of an equilateral triangle. The base of the triangle is 64 hr; the peak flow is 535 cfs; the drainage area is 5.7 mi^2.
Show the amount of allowable depreciation : John Marten is a sole proprietor who engages in financial planning for wealthy individuals. He wants his offices to be decorated with rare collections of art as they are investments which should increase in value.
Customer service professional or as a customer : What obstacles to effective listening have you experienced, either as a customer service professional or as a customer? How could these obstacles be removed?

Reviews

Write a Review

Civil Engineering Questions & Answers

  Calculate equivalent pipe size and flow in the pipe

The first pipe of 0.4-m diameter is 500 m long, the second pipe 600 m long, size 0.3 m, and the last pipe is 500 m long of diameter 0.2 m. If the elevation difference between two reservoirs is 30 m, calculate equivalent pipe size and flow in the p..

  Determine what is the pressure acting on the sand

A 3-ft diameter column with weight of 150 kg is placed on top of 1 m thick aggregate layer. The soil beneath the aggregate layer is sand. The friction angle of the aggregate is 36 degrees and the unit weight is 22 lb/ft3. What is the pressure acti..

  Employ the ideal gas model with constant specific heat raio

Employing the ideal gas model with constant specific heat ratio k, determine the temperature at the end of the process and the amounts of work and the heat transfer per unit mass in Btu/lb

  Determine the acre-feet of water that can be impounded

An earth fill is constructed across a drainage. Closed contours at the 1000, 1040 and 1080 foot levels define areas of 680,000; 1,200,000; and 1,325,000 square feet respectively.

  Determine the rate of work done by the fan

standard air is drawn from the atmosphere into a 1.25 m diameter cylindrical duct by a fan mounted inside the duct. This air is discharged down stream from the fan through a 0.6 m diameter duct at a velocity of 25 m/s and atmosphere pressure.

  Determine what is the departure of the course

A course has true azimuth of 157 degrees 15 minutes and a length of 325 feet. What is the departure of the course

  Estimate force r on reducer when water flows through reducer

For any flowrate, the pressures in the pipes upstream and downstream of the reducer are expected to be related by using Bernoulli's equation where p1 and p2 are the upstream and downstream pressures and V1 and V2 are the upstream and downstream ve..

  Determine what is the order and class of the leveling

Differntial Leveling between BM's A,B,C,D, and A gives elevation differences (in meters) of -15.632, 32.458, 38.214, and -55.025, and distances in km of 4.0, 6.0, 5.0, and 3.0 respectively.

  Qualitative or quantitative risk assessment on the project

Conduct either a qualitative or quantitative risk assessment on this project. Identify the risk factors that you consider most important for the suspension bridge construction. How would you assess the riskiness of the project? Why?

  Determine what is the speed in rpm of the car wheels

If a car engine is turning at 4000 rpm, the transmission gear ratio is 3:1 and the final drive ratio is 4:1. (a) what is the speed in rpm of the car wheels and (b) the vehicle speed if the tire radius is 8 inches

  Hat is the probability that more than 2.5 inches

what is the probability that less than 0.5 inches of precipitation will occur in any January? What is the probability that more than 2.5 inches wil

  Direction of the velecity of the cars after collision

If friction between the cars and the rails is neglected, what were the magnitude and the direction of the velecity of the cars after the collision?

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd