1.The vertical effective stress at a certain point in a loose sand is 1000lb/ft^2. If an earth quake were to occur, how much excess pore water pressure would need to develop at this point for liquefaction to occur? Show a numerical rationale for your answer.
2.Compute the 50 year flood discharge on a large creek in Northern Ohio if the total discharge area is 75 mi^2. The average soil infiltration is 0.5 in./hr; the main channel slope is 0.008. (The rain fall intensity is 14.)
3.A 2.5 hr long uniform rainfall resulted in runoff hydrograph that has the shape of an equilateral triangle. The base of the triangle is 64 hr; the peak flow is 535 cfs; the drainage area is 5.7 mi^2. Determine the corresponding unit hydrograph if the base flow for the channel is 10 cfs.
4.A 300-acre forested watershed in fair hydrologic condition located on the clayey flat coastal region of Southern California receives 4.0 in. of rain in a 24 hr period. Determine the corresponding flood peak of the runoff using the SCS curve number method.
suppose there are 10 pieces of paper in a hat. Each piece of paper has a digit 1 through 10 written on it. Each number is written only once. You reach in the hat and select a piece of paper. What is the probability that the paper has either a 3 or..
The central conductor and the conducting tube carry equal currents of I = 1.05A in opposite directions. The currents are distributed uniformly over the cross sections of each conductor. What is the value of the magnetic field at a distance r = 5.4..
Determine the support reactions at A, C, and E on the compound beam which is pin connected at B and D.
The concrete post (Ec=3.6*10^6 psi and Ac= 5.5*10^-6/degrees F) is reinforced with six steel bars. each of 7/8-in diameter (Es=29*10^6 psi and As=6.5*10-6/ degrees F).
The relative density of a sloped sand deposit is known to be 75%. Water is observed to be seeped through this slope at a rate such that the discharge velocity is 0.6 m/day. If the hydraulic conductivity for this deposit is 4×10-4 m/s.
An investigation at a particular site reveald 10 m of clay overlying 2m of sand resting on bedrock.the water table was found to be at the ground surface and the piezometric level for the sand to be 2m above ground level
Calculate the primary consolidation settlement for the CH layer, assuming that it is normally consolidated with a water content of 70% and a compression index of 0.25.
In the determination of the average velocity of flow in wide rivers, it is common practice to estimate the average velocity in a vertical section by making a single measurement at a distance below
The wet bulb and dry bulb temperatures for humid atmospheric air (at 100 kPa) are measured to be 20 C and 25C respectively. Determine: a. using the psychrometric chart, the relative humidity b. using the psychrometric chart, the humidity ratio
The total dissolved inorganic carbon (TIC) of a sample of groundwater is 8.33 mM. The temperature of the aquifer is 15C, the pH is 7.5, and the ionic strength is 0.05 M. What is the H2CO3, HCO3-, CO3 2-, and the partial pressure of CO2
Design a 2:1 rectangular duct and fan system to pull 40000 scfm of air carrying a medium-density dust through an FCD (Final Control Device) with a ?P of 6.0 in. H2O. Assume the duct system must extend 120-feet and has four 90° elbows.
question 1. what is the difference between labor cost and labor pro-ductivity? use a sketch to illustrate.question 2.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd