Determine the concentration of the pits overflow stream

Assignment Help Civil Engineering
Reference no: EM13315380

A company has been discharging its waste into a holding pit for a long time. For the last several years, the pit has been full and overflowing into a local river. The waste concentration has been nearly constant at 10 mg/L of the pollutant of interest. At this concentration, there have been no adverse effects on the stream. Suddenly, there is a process change and the contaminant in the waste stream goes up to 100 mg/L. Given that the waste stream flow rate is 100,000 L/day and the holding pit volume is 1.0 million liters, determine the concentration of the pit's overflow stream after 10 days.

Reference no: EM13315380

Questions Cloud

How much torque does the aircraft engine provide : The engine of an aircraft propeller delivers an amount of power 177 hp to the propeller at a rotational velocity of 2390rev/min, How much torque does the aircraft engine provide
Calculate what is the normal annual interest rate : a student bought a $75 used guitar and agreed to pay for with a single $85 payment at the end of the 6 months. assuming semiannual (every 6 months) compounding, what is the normal annual interest rate
Calculate the magnitude of the resultant electric field : In the x-y plane, a charge of -4.6 microcoulombs is on the x-axis at the point (-30cm,0cm), calculate the magnitude and direction of the resultant electric field E at the origin (0cm,0cm)
Calculate total mass emissions of particulates out of steck : The temperature in the stack is 300 F and the pressure is 725 mm Hg. If the total flow rate of gas out of the stack is 190 standard cubic meters per second, calculate the total mass emissions of particulates out of the stack in kg/day.
Determine the concentration of the pits overflow stream : A company has been discharging its waste into a holding pit for a long time. For the last several years, the pit has been full and overflowing into a local river. The waste concentration has been nearly constant at 10 mg/L of the pollutant of inte..
How much work must be done on the crate : A 34.0kg crate is initially moving with a velocity that has magnitude 3.70m/s in a direction 37.0 %u2218west of north. How much work must be done on the crate
Determine the x-y-z components of that force : determine a) the x, y,z components of that force b) values of angle thetax, thetay, theta z defining the direction of the recoil force. (assume that the x, y, and z axes are directed respectively east, up, and south)
Demonstrate familiarity with problems of tcp/ip connectivity : A network administrator faces when dealing with a client/server network is TCP/IP connectivity between computers in the network.
Describe the rise of professional sports in america : American sports became big business in the Gilded Age and describe the rise of professional sports in America, and explain how capitalism was evident within it.

Reviews

Write a Review

Civil Engineering Questions & Answers

  What is velocity of blocks 5 after blocks started moving

What is the velocity of the blocks 5.00 after the blocks have started moving. Assume that the rope joining the two blocks in long enough so that, at this time, block A is on the frictionless surface while block B is still on the rough surface.

  Prepare an outline of the experimental design

Prepare an outline of the experimental design you will suggest to the plant manager. This outline should contain research rationale, aims and objectives, research methodology, nature of data analysis and interpretation, and possible outcomes/concl..

  Calculate the overall copper recovery for the process

A froth flotation process is used to concentrate copper ore. It is a two stage process with a rougher stage followed by a cleaner stage. The cleaner tailings are returned to the rougher flotation.

  What is the void ratio and the porosity of the sample

An undistured soil sample has a dry unit wieght of 112 pcf with specific gravity of solids equal to 2.68. a. What is the void ratio of the sample b. What is the porosity of the sample

  Determine its thermal conductivity k between two surfaces

Two surfaces of a 2cm thick plate are maintained at 0*C and 80*C, respectively. Heat is transferred through the wall at a rate of 600 W/m^2., determine its thermal conductivity,k.

  Determine the deflection of a simple uniformly loaded

Determine the deflection of a simple uniformly loaded beam by the Ritz method,using first one term, then two terms, adn finally three terms in a sine series. Why does the coefficient of sin2piex/L vanish?

  Create a primary function

create a primary function that uses a function handle with a nested function to compute the ninimum of the function 20x^2-200x+12 over the range 0

  Determine the coefficient of kinetic friction

THE 2.5 MG VAN IS TRAVELLING WITH A SPEED OF 100KM/H WHEN THE BRAKES ARE APPLIED AND ALL 4 WHEELS LOCK. IF THE SPEED DECREASES TO 40KM/H IN 5S.

  What is the pressure on the soil if theta is 45 degrees

A pipe is to be installed under the ground on a bed of aggregate 6 in. thick. The entire weight on the aggregate from pipe and soil above the pipe is 1800 lbs. per linear foot of pipe. What is the pressure on the soil if theta is 45 degrees

  Determine what is the uncertainty in meters in the distance

A laser range finder consists of a laser and a light receiver. It operates by bouncing a laser pulse off a mirror and measuring the time of flight, the time it takes for the pulse to leave the laser, bounce off the mirror and return to the receive..

  Determine the normal depth yo and critical depth yc

A 1 m diameter unfinished concrete pipe (n = 0.015) has a slope of So = 0.001 and conveys water at Q = 0.5 m3/s. Find the normal depth yo and critical depth yc.

  What is the total head 5m below the river bed

Consider again the scenario above. Assume the water is static. Assume a datum at the water surface. a) What is the total head 5.0m below the river bed b) What is the pore water pressure at that level

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd