A biodegradable industrial wastewater (paper production) has a COD of 600 mg/ L. If the BOD progression follows first-order kinetics with a rate constant of 0.10 per day, determine the BOD5

Reference no: EM13300293

Questions Cloud

Explain real orbitals and which are impossible : Which of the following combinations of n and l represent real orbitals and which are impossible? 4s 3p 3f 2p
What is the angular speed of the ball after impact : A uniform solid ball that has a mass of 21.8 g and a radius of 5.1 cm rests on a horizontal surface. What is the angular speed of the ball after impact
Determine what is present worth of maintaining the bridge : Maintenance expenses for a bridge in Georgia are estimated to be $200,000 for the first eight years followed by two separate million dollar expenditures in years 12 and 18. The expected life of the bridge is thirty years.
How attractive is the boeing 7e7 project : Judged against your WACC, how attractive is the Boeing 7E7 project?
Determine the bod of biodegradable industrial wastewater : A biodegradable industrial wastewater (paper production) has a COD of 600 mg/ L. If the BOD progression follows first-order kinetics with a rate constant of 0.10 per day, determine the BOD5
How many photons are present in each pulse : A surgeon is attempting to correct a detached retina by using a pulsed laser. If the pulses last for 35.1 ms, how many photons are present in each pulse
The first stage of the team development process : The last stage of the team development process is usually: The first stage of the team development process is:
Explain the structure consists of identical atoms : Give the number of atoms in the unit cell. Assume the structure consists of identical atoms. face-centered cubic a. one b. two c. four d. eight
Write an essay of alloys and its types : § Write an essay of alloys, types of alloys and Describe Non-heat-treatable alloys, Heat-treatable alloys

Reviews

Write a Review

Civil Engineering Questions & Answers

  Gathering the data information

What additional data and information should he gather,and how should he go about gathering the data information ?

  Determine the daily discharge of groundwater into the canal

A canal is constructed parallel to a river 600 m away both fully penetrating an unconfined aquifer of coarse sand and fine gravel as shown in the illustration below. The aquifer is subject to an average infiltration of 2.3 m/year

  Determine the amount of oil and money saved per year

The maximum flow rate of a standard shower head is about 3.5 gpm and can be reduced to 2.75 gpm by switching to a low-flow shower head that is equipped with flow controllers. Consider a fam- ily of four, with each person taking a 6-minute shower e..

  Find the capacity of the main channel and the lateral extent

Field tests have shown that the Horton equation best describes the composite roughness of the channel. Find the capacity of the main channel and the lateral extent of the floodplains for a 100-year flow of 1590m^3/s.

  Determine what is the mass of the object necessary

An object is held in the air 30m above ground and released. Assume the drag force due to air resistance is given by Fd = 1.0Vy. What is the mass of the object necessary so that it reaches ground in 3s

  Find how much water must be added to increase water content

a moist soil has a total unit weight of 110 pcf and a water content of 6 percent. assuming that hte dry unit weight is to remain constant , determine how much water , in gallons per cubic yard, must be added to increase the water content to 12 per..

  What is the probability that the paper has either a 3 or a 6

suppose there are 10 pieces of paper in a hat. Each piece of paper has a digit 1 through 10 written on it. Each number is written only once. You reach in the hat and select a piece of paper. What is the probability that the paper has either a 3 or..

  Estimate the area of circle using the lower and upper bounds

Write a simple MATLAB program that will estimate the area of a circle using the lower and upper bounds (using triangles). The user will input the diameter of the circle and the desired accuracy (relative error ) and the program must run

  Calculating the principle of shoring system

How to calculate the principle of shoring system in formwork analysis when the secondly floor upper has been poured?

  Determine the net change in storage during the year

Determine the net change in storage during the year if local municipality is allowed to take 100 MGD from the reservoir. You may neglect infiltration and seepage from the reservoir. Sketch a mas blance of the reservoir.

  Find modulus of elasticity of pavement for corner deflection

The pavement is on a base which has a modulus of subgrade reaction of 250 pci. A 17,000 lb corner load is applied (al is 7 inches). Using the revised Westergaard equations, find the modulus of elasticity of the pavement if a corner deflection of 0..

  What is the maximum safe speed around the curve

What is the maximum safe speed around the curve? If the speed limit on the roadway is 60mph, what action should be taken by the engineer?

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd