Determine the belt speed and spacing between parts

Assignment Help Management Theories
Reference no: EM131453127

Question: A moving belt line is used for a product whose work content time = 33.0 min. Production rate = 45 units/hr. The length of each station = 1.75 m, and manning level = 1.0. It is expected that the balance delay will be about 0.08 or slightly higher. Uptime reliability = 96%. Time lost for repositioning each cycle is 6 sec.

(a) Determine the number of stations needed on the line.

(b) If the tolerance time were 1.5 times the cycle time, determine the belt speed and spacing between parts for this line.

Reference no: EM131453127

Questions Cloud

Define the term balance delay : The work content for a product assembled on a manual production line is 48 min. The work is transported using a continuous overhead conveyor that operates.
Write a list of animal and its characteristics to a database : Write a list of animal and its characteristics to a database using JDBC. Display the characteristics of an animal when that animal is selected.
Persuasive email to a manager or coworker : Write a 700- to 1,050-word persuasive email that includes a well-crafted subject line, salutation, and signature block.
Describe and compare various user interfaces within an os : Describe the functional components of an operating system, including kernels, modules, application program interfaces, and other services?
Determine the belt speed and spacing between parts : A moving belt line is used for a product whose work content time = 33.0 min. Production rate = 45 units/hr. The length of each station = 1.75 m.
Create a one- to two-page resume for this job : Create a one- to two-page resume for this job. Your resume should be formatted consistently by using the same type face, font, and headings. Use clear writing.
Discuss what kind of tactics you should use to achieve that : Draw a sequence diagram for this system. Suppose that we want greater availability of the server, discuss what kind of tactics you should use to achieve that.
What is the elapsed time a work unit spends on the line : Work content time for a product assembled on a manual production line is 45.0 min. Production rate of the line must he 40 units/hr.
Implementing an erp system : explain why ERP systems include CRM and SCM components, and the advantages the company can gain by implementing all of the components for connected corporation

Reviews

Write a Review

Management Theories Questions & Answers

  Learning in action

Learning contract proposal that will form the basis of your learning contract report.

  Change is the only constant

"Change is the only constant " Evaluate the different types of change that have occurred in Sony.

  How do advertisers try to use group influence

How do advertisers try to use group influence?  Will you find any specific examples and explain the relevant theory of group behavior and influence?

  Case study:saving sony

You have been appointed by Sony as a consultant on change management. Advise Sony on how they could implement the change by using the various theories of change you have learnt.

  How the stock market works

The purpose of this project is to help you to gain an understanding of how the stock market works and of the relationship between theory and practice.

  Find the optimal production quantities

Find not only the optimal production quantities, but also the optimal total cost.

  Describe the management process

Describe the management process and identify the skills required to manage business organizations.

  Case study : bert''s bonsai and aquatic sport museum

Case Study : Bert's Bonsai and Aquatic Sport Museum Prepare a knowledge management system.

  Knowledge management techniques

Demonstrate understanding of the many-sided nature of knowledge management

  Theory of transtheoretical model

Demonstrate understanding of the many-sided nature of knowledge management

  Write a paper on historical trends of management

Write a paper on Historical Trends of Management.

  Theory of reasoned action

Theory of Planned Behavior and Integrated Behaviors Model

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd