Determine the average value of the material

Assignment Help Mechanical Engineering
Reference no: EM13495365

1. The figure below shows two sample points in a process line.

2336_Nature of the process fluid.png

(a) What is the nature of the process fluid?

(b) What are the objectives of the two sample points and in what way do the samples reaching the instruments differ?

(c) Could the effectiveness of the second sample probe be improved and if so how?

(d) What additional feature would be necessary for the second sample line and why?

Before deciding on a pump to supply a sample, what information must be collected and why?

(a) For what purposes is it important to obtain a rapid response to changes in process stream composition and what methods are used, when designing a sample system, to achieve this?

(b) In the same situations as in (a) above, it is also essential to provide analyser systems which do not break down and which maintain their calibration.

What steps should be taken when designing the sampling system and the installation generally in order to ensure this?

2. (a) An X-ray fluorescence analyser requires a sample consisting of a thin layer of powder on a small conveyor belt. The material to be measured consists of a very large flow of solids of widely variable size and it is not certain that large and small pieces have the same composition. The material is also often damp, but the water content is of no interest. The material is transported on a large conveyor and finally dropped into a bunker off the end of the conveyor. Changes in composition are slow, so intermittent sampling can be used.

Explain, with diagrams as necessary, how you would supply a representative sample to the instrument.

(b) In the above example, how often would the sample have to be taken?

(c) If the objective was to determine the average value of the material in the bunker, how could this be done by making one measurement?

Reference no: EM13495365

Questions Cloud

Explain a is pass through a sn(no3)2 solution : A current of 3.68 A is pass through a Sn(NO3)2 solution. How long (in hours) would this current have to be applied to plate out 8.20 g of tin
Calculate totals for cash payments : Consider how the amounts would differ if Bainbridge were to borrow the $100,000 at different interest rates and time periods. The results of the original data (option 1) have been entered in the following schedule. In the spreadsheet.
What is the speed of sound in neon gas : A speaker and two microphones are arranged inside a sealed container filled with neon gas. What is the speed of sound in neon gas
What is the initial velocity of the green car : A red car and a green car, identical except for the color, move toward each other in adjacent lanes and parallel to an x axis. What is the initial velocity of the green car
Determine the average value of the material : How often would the sample have to be taken - If the objective was to determine the average value of the material in the bunker, how could this be done by making one measurement?
Define how much nickel is plated out of the solution : A current of 3.65 A is passed through a Ni(NO3)2 solution for 1.80 hours. How much nickel is plated out of the solution
Determine input current and voltage are needed : A step-up transformer has 10 turns on the primary coil and 500 turns on the secondary coil. what input current and voltage are needed
Evaluate the hydrogen ion concentration in the anode : If the measured cell potential is 0.95 V at 25 °C and the standard reduction potential of the Ag /Ag half-reaction couple is 0.80 V, calculate the hydrogen ion concentration in the anode compartment.
What is the original kinetic energy of the cart : On a frictionless track, a 0.55 kg cart is traveling at 0.70 m/sec when it runs into a spring that is anchored to the end of the track. what is the original kinetic energy of the cart as it approached the spring

Reviews

Write a Review

Mechanical Engineering Questions & Answers

  Package design

Package Design Brief: Assume you are the packaging engineer for a large consumer products company. In this company, the Packaging Design Briefs are initiated by the marketing group and forwarded to the Package Engineering group.

  Mechanical engineering questions

Define dynamic viscosity, Determine the centroid, Pressure due to the height of liquid, Advantage of changing the liquid, Calculate the total moment about the hinge of the seal gate.

  Automatic control

DOF system and Find the differential equation describing the system

  Write a paper on boyle''s law

Write a paper on Boyle's law and describe Compression and Combustion stroke . Also explain Charles's law and illustrate SI engine and CI engine.

  Verify the law for parallelogram of forces

To Verify the law for parallelogram of forces, law for triangle of forces and law of polygon of forces. These laws are very useful to calculate unknown forces in very short time.

  Discharge pressure of the compressor

What is the discharge revised discharge pressure of the compressor.

  The Case for Global Accounting Standards

The role of IFRS in both developing and developed capital markets.

  Wind turbine

Wind turbines are becoming more and more common as a method of energy production, wind turbines by their very nature are dynamic and are subject to and create their own internal and external kinematics and kinetics.

  Advanced design methodologies

8 x product engineering and design review (week 2 – 12), ~3 pages per item which must contain a brief description of the product then delve into concepts such as materials selection, manufacturing methods, life cycle analysis, recyclability and overa..

  Design of absorption column and the cooler

Design of absorption column and the cooler. Process design of other units should be completed along with pipe sizes.

  Determine the maximum total bending moment

Determine maximum total bending moment (static plus dynamic) of the beam under steady-state conditions.

  Force of the water on the gate

Determine the magnitude of the horizontal and vertical components of the force of the water on the gate.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd