The Peachtree Airport in Atlanta serves light aircraft. It has a single runway and one air traffic controller to land planes. It takes an airplane 12 minutes to land and clear the runway (following an exponential distribution). Planes arrive at the airport at the rate of 4 per hour (following a Poisson distribution). For purposes of this analysis, you can ignore the planes taking off.
a) Determine the average number of planes that will stack up (wait) to land.
b) Find the average time a plane must "wait in line" before it can land.
c) Calculate the average time it takes a plane to land and clear the runway once it has notified the airport that it is in the vicinity and wants to land.
d) What is the probability that an arriving plane will find at least one other plane waiting to land?
e) The FAA has a rule that an air traffic controller can, on the average, land planes a maximum of 45 minutes out of every hour. There must be 15 minutes of idle time available to relieve the tension. Does this airport satisfy this requirement? Explain.
f) Suppose that the cost assigned to a plane that is waiting to land (in the stack) is $1,000 per hour and the cost per hour for the air traffic control operation is $2,000 per hour. What is the total cost of this operation considering both the waiting time and the air traffic control operation?
An important part of being an educator
: An important part of being an educator is reflection. Reflection is a learning process through which you use your experiences and knowledge to guide you in the future. Each week you will have the opportunity to use your journal to reflect on the c..
|
How will applicant respond to the recruitment method and why
: How will applicants respond to the recruitment method and why? What types of assessments,if any, will be used, at what stage of the process and why?
|
How much work does the force do on the block
: Water skiers often ride to one side of the center line of a boat, as shown in the figure below. In this case, the ski boat is traveling at 15 m/s and the tension in the rope is 80 N. If the boat does 3500 J of work on the skier in 49.9 m, what is ..
|
Find the slope and the intercept term
: Using a pencil, paper, and a calculator, find the slope and the intercept term for Final = a + b Exam1. Show your work, step by step.
|
Determine the average number of planes that will stack up
: Calculate the average time it takes a plane to land and clear the runway once it has notified the airport that it is in the vicinity and wants to land.
|
Regression model to forecast demand for trainers
: The gym has developed the regression model to forecast demand for trainers Demand = 185 + (.15*advertising expenditures)-(.05*doughnuts) + (.23*swim gear sales)
|
Explain why the method used to allocate costs at lenno
: Explain why the method used to allocate costs at Lennon results in unreasonably high charges to the Model 599 fan.
|
Briefly summarize in narrative form the major discoveries
: Briefly summarize in narrative form the major discoveries that emerged from the Evaluation of Alternatives section - You might research other organizations that have attempted similar solutions to the problem you have identified and explore the resu..
|
Idea behind linear regression
: What is the idea behind linear regression? What is it? Why do it? What are some limitations of linear regression?
|