Given a four-legged pre-timed signalized intersection with one exclusive left turn lane, one through lane and one through/right lane on each approach (all approach and receiving lanes are 12 ft. and there is a 4-foot raised median separating the left turns from the opposing traffic lane), a 35 mph speed limit on all approaches, and the following traffic characteristics -

Peak Hour Volumes EB WB NB SB
Left 107 134 88 106
Through 599 653 432 487
Right 142 135 108 112
PHF 0.9 0.9 0.9 0.9
Arrival Type 4 4 3 3

Other input data - 3% heavy vehicles, no parking, no buses, no bikes or pedestrians, level grade on all approaches, in a non-CBD area.

1. Determine the appropriate yellow and all-red interval to use for each phase. Assume a 10 ft/sec2 deceleration rate, a one second reaction time, and a 20 ft. vehicle length. Round up yellow and all-red times to the nearest ½ second.

2. Assuming protected-only left turns, manually calculate the saturation flow rates for all lane groups. For the exclusive through and through-right lanes, assume the through movements are distributed to equalize the flow ratios.

3. Develop a protected-only left turn phasing plan that minimizes sum of critical v/s.

4. Estimate the optimal cycle length using the HCM Method with Xc = 0.9 and based on the HCM lost time/extension of effective green assumption. Round the estimated optimal cycle length up to the nearest 5 seconds.

5. Calculate all interval timings (critical and non-critical phases) for the optimal (rounded) cycle length.

6. Develop the queue accumulation polygon for the westbound exclusive through lane group and calculate the total uniform delay and average uniform delay per vehicle.

Calculate the incremental delay for the westbound exclusive through lane group and determine the lane group level of service.

Reference no: EM13546738

Questions Cloud

Which option has the lowest overall cost : Two remediation options are being considered for a contaminated land area formerly used for industrial operations. Option 1 involves removing all of the contaminated soil over a two-year period at a cost of 2.2$ million per year.
The inertial forces can be neglected : As a consultant, you are required to design a swing set of a child whose mass is kg. The diameter of the wire used for constructing the links of the chain is 5 mm. Determine the average normal stress in the links at bottom of the swing, assu..
A new after-school delinquency prevention program : A new after-school delinquency prevention program is being established. The Program Director calls you up on the telephone and asks your advice on how to design a good program. What advice can you give her?
Determine the energy loss due to the gradual enlargement : Determine the energy loss due to the gradual enlargement from a 25 mm pipe to a 75 mm pipe when the velocity of flow is 3 m/s in the smaller pipe and the cone angle of enlargement is 20°C.
Determine the appropriate yellow and all-red interval to use : 1. Determine the appropriate yellow and all-red interval to use for each phase. Assume a 10 ft/sec2 deceleration rate, a one second reaction time, and a 20 ft. vehicle length. Round up yellow and all-red times to the nearest ½ second.
An architectural requirement of width of beam : For the beam shown in the following figure, design the beam for the L.L. of 2.25 k/ft and D. L. Of 1.5/ft, the length of beam is 15 ft. fe = 4000 psi and fy = 60000 psi. An architectural requirement of width of beam is 12". Decide depth your..
Ultimate bond strength and development length : What do you understand by ultimate bond strength and development length? Explain briefly.
Determine the equivalent uniform annual cost : Art Arfons, a K-State-educated engineer, has made a considerable fortune. He wishes to start a perpetual scholarship for engineering students at K-State.
Does this allow for a reasonable factor of safety : A footing under a brick pier has dimensions 300mmx300mmx300mm deep. what is the pressure applied to the soil under the above load. How does this compare with an allowable bearing capacity of 100kPa. Does this allow for a reasonable factor of safety.

Reviews

Write a Review

Finance Basics Questions & Answers

  Financial reporting and analysis

Finance is about Gunns Ltd, a company in dealing with forestry products in Australia. The company has also been listed in Australian Stock Exchange. As many companies producing forestry products, even Gunns Ltd is facing various problems. Due to the ..

  A report on financial accounting

This report is specific for a core understanding for Financial Accounting and its relevant factors.

  Describe the types of financial ratios

Describe the types of financial ratios and other financial performance measures that are used during venture's successful life cycle.

  Differences between sole proprietorship and corporation

Briefly describe the major differences between a sole proprietorship and a corporation

  Prepare a cash budget statement

Calculate the expected value of the apartment in 20 years' time. What is the mortgage loan repayment at the beginning of each month

  What are the implied interest rates

What are the implied interest rates in Europe and the U.S.?

  State pricing theory and no-arbitrage pricing theory

State pricing theory and no-arbitrage pricing theory

  Small business administration

Identify the likely stage for each venture and describe the type of financing each venture is likely to be seeking and identify potential sources for that financing.

  Effect of financial leverage

The Effect of Financial Leverage and working capital management

  Evaluate the basis for the payment to the lender

Evaluate the basis for the payment to the lender and basis for the payment to the company-counterparty.

  Importance of opps, ipps, mpfs and dmepos

Research and discuss the differences and importance of : OPPS, IPPS, MPFS and DMEPOS.

  Time value of money

Time Value of Money project

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd