Determine that a building solution complies with performance

Assignment Help Civil Engineering
Reference no: EM13561631

1.A light bar AD is suspended from cableS and supports a 20 kg block at C. The extremities A and D of the bar are in contact with frictionless, vertical walls. Determine the tension in cable BE and the reactions A and D

2.In accordance with BCA, what are the assessment methods and how may they be used to determine that a building solution complies with the performance requirements?

Reference no: EM13561631

Questions Cloud

Determine the moment of all cable forces about point a : Structure O A B C is built in at point O and supports forces from two cables. Cable E A D passes through a frictionless ring at point A, and cable O C G passes through a frictionless ring at point C. If the force in cable E A D is 800 lb and the forc..
Determine head loss through this pipe section : A pipe carrying oil of specific gravity (SG = 0.877) changes in size from 150 mm at section E to 450 mm at section R (E and R are arbitrary designations of the two points in the system).  Section E is 3.66 m lower than R
Take the casing wall to have an outer diameter : Batteries in a flashlight must be held in electrical contact even though the outer plastic housing expands differently than the battery and terminals. This is accomplished by having a compliant spring compressed as the cover is screwed on the flashli..
What will be the steady-state effluent concentration : A water treatment plant treats a continuous flow rate of 50,000 m^3/day and plans to build a 10,000 m^3 tank to house an additional treatment process. The reaction occurring in the tank will remove nitrate according to first order decay with a rate o..
Determine that a building solution complies with performance : In accordance with BCA, what are the assessment methods and how may they be used to determine that a building solution complies with the performance requirements?
How many square feet of compacted cy are placed per hour : Earth whose in situ weight is 110 lb per cf and compacted weight is 124 lb per cf is placed ina a fill at rate of 280 cy per hr, measured as compacted earth. The thickness of the compacted layers is 8 in
Compute the coefficient of permeability of the soil in : Standard air is drawn from the atmosphere into a 1.25 m diameter cylindrical duct by a fan mounted inside the duct. This air is discharged down stream from the fan through a 0.6 m diameter duct at a velocity of 25 m/s and atmosphere pressure.
What is the force if the fire fighter is running towards : The water exiting a 2.5 cm diameter nozzle which is atrtached to a 7.6 cm diameter fire hose is discharged at a velocity of 25 m/s. the pressure in the hose is 380 kpa. what is the magnitude and direction of the force of the water n the nozzle, if th..
Determine the hydraulic conductivity of the sand : The maximum dry density determined in the laboratory for a quartz sand is 1800 kg/m^3. In the field, if the relative compaction is 90%, determine the hydraulic conductivity of the sand in the field compaction condition

Reviews

Write a Review

Civil Engineering Questions & Answers

  Design the pipe to flow capacity and use a mannings n

Determine the diameter (in inches) and velocity (feet per second) of a concrete storm pipe required to carry a peak flowrate of 20 cfs at a slope of 1.0% Design the pipe to flow at 75% capacity and use a Mannings n of 0.013.

  Determine what is the pressure in the pipe at floor level

A water storage tank is on the roof of a factory building & the surface of the water is 50 ft above the floor of the factory. if a pipe connects the storage tank to the floor level & the pipe is full of static water

  Determine diameter of second pipe is four times

water flows through a pipe of diameter 3 inches. If it is desired to use another pipe for the same flow rate such that the velocity head in the second pipe is four times the velocity of the first pipe.determine diameter of pipe

  Compute the elevation and station of the bvc and evc

A -2.8% grade line meets a +3.6% grade line at station 125+00 at elevation of 1631.04. Assuming a length of curve is 650feet, compute the elevation and station of the BVC (PVC) and the EVC (PVT).

  Find minimum speed at which train could pass over the tank

find teh minimum speed at which the train could pass over the tank and lift water up to teh full 4 m height. (hint: consider the locomotive to be stationary and neglecting all losses)

  Calculate how many assemblies the inspector may inspect per

A grievance has been filed by the union at Dorben Co. regarding the final inspection station, in which the operator slightly lifts a 20 lb assembly, examines all sides, and, if acceptable, sets it back down on the conveyor, where the assembly goes to..

  Determine rate of increase of speed and the normal force

sled and rider with a total weight of 200 lb travel down smooth slope defined by equation y=x^2/20. At x=40 ft the sled's speed is 10 ft/s. At x=40 ft determine rate of increase of speed and the normal force which the slope exers on the sled.

  Determine the soils coefficient of permeability during test

The head difference between manometer levels was 4.9 cm during the test, and the water temperature was 20 degrees celcius. If it took 152 second for 500 ml of water to discharge, determine the soil's coefficient of permeability.

  What is the conclusion of t-beam

Two solid cylindrical rods are joined at B and loaded as shown rod AB is made of steel(E=200 GPa) and rod BC of brass ( E = 105GPa) determine a) the total deformation of composite rod ABC, b) the deflection of point B

  Determine what is the hydraulic conductivity of the sand

it was observed that the quantity of the water flowing through the sand layer into the collection ditch is 250 m^3/day. What is the hydraulic conductivity of the sand (k)

  Plot the two test results on a shear stress-normal stress

At a confining pressure of 2000 psi, the first sample failed at 9000 psi. Then at a confining pressure of 5000 psi, the other sample failed at 21,000 psi. Plot the two test results on a shear stress-normal stress diagram and draw in Mohr envelope.

  Calculate energy needed to bring the soil to surface level

We are digging a hole to build a building. Calculate the energy needed to bring the soil to surface level. Remember the sides of the excavation lie at 45 degrees. Else, the whole would be constantly refilling itself.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd