Determine minimum speed and power to take off

Assignment Help Civil Engineering
Reference no: EM13546900

1.An operator at a wastewater treatment plant decided to increase the SRT from 5 days to 10 days. How will this change affect: a) the oxygen requirement b) MLVSS in the aeration tank. c) the effluent BOD or COD. d) the sludge generation (please explain your answer using the kinetic equations for activated sludge process)

2.An airplane with a Clark Y airfoil cross-section weighs 3500 lbs. The chord length is 6ft and the wingspan is 36 ft. Determine the:

a) Minimum speed and power to take off, if the angle of attack is 12.4 degrees.

b) Power to cruise at 150 mph at an altitude of 15,000 ft.

c) % increase in power if the plane is cruising 150 mph at 10,000 ft. d) Stall speed at landing

Reference no: EM13546900

Questions Cloud

Determine the specific energy for this flow condition : A trapezoidal channel has a bottom width of 5 feet, a slideslope (horizontal:vertical) of 2, and a depth of flow of 4 feet. The elevation of the channel bottom drops 2 feet every 1000 feet of horizontal distance traveled. The discharge in the channel..
What is the maximum value of z possible with no increase : The flowrate in a rectangular channel is 20 m3/s. The width of the channel is 4 m and the depth of flow is 5 m. If there is an increase in the channel bottom elevation (?z) with NO energy loss, what is the maximum value of ?z possible with no increas..
.examine traditional, contemporary, and emerging leadership : Use the Internet or the Strayer Library to research a company for which you would like to work (or your current company if you are already employed).
What would their book value be next year : The Digby's balance sheet has $111,771,000 in equity. Further, the company is expecting $3,000,000 in net income next year. Assuming no dividends are paid and no stock is issued, what would their Book Value be next year?
Determine minimum speed and power to take off : An airplane with a Clark Y airfoil cross-section weighs 3500 lbs. The chord length is 6ft and the wingspan is 36 ft. Determine the: a) Minimum speed and power to take off
What amount of ammonia nitrate and phosphoric acid additions : A pharmaceutical wastewater needs a minimum of BOD/N/P of 100:5:1 for biological treatment. the wastewater characteristics are BOD= 800 mg/l, among which 95 % are soluble, suspended solids 250 mg/l, soluble nitrogen as element nitrogen = 24 mg/l, and..
Calculate the base width of channel : The ladder AB weighs 10 N and leans against a wall as shown. Assuming that the coefficient of static friction µs is the same at A and B, determine the smallest value of µs for which equilibrium is maintained. The weight force acts at the center of th..
Flow occurs in a rectangular channel of 6 m width and has : Flow occurs in a rectangular channel of 6 m width and has a specifi c energy of 3 m. Plot the q-curve. Determine from curve (a) critical depth (b) the maximum flow rate (c) the flow rate at a depth of 2.4 m and (d) the depths at which flow rate of 28..
Design the column including cross-sectional dimensions : A tied short column of square cross-section is subjected to a factored axial load of 2500 kN and a factored bending moment of 175 kN.m. Use a 40 mm clear cover to the ties and a 20 mm maximum aggregate size.

Reviews

Write a Review

Civil Engineering Questions & Answers

  Determine the force n exerted by the fixed circular slot

At the instant when angle theta= 50 degree, the horizontal guide is given a constant upward velocity v0 = 1.3 m/s. For this instant calculate the force N exerted by the fixed circular slot and the force P exerted by the horizontal slot on the 0.60..

  Determine the magnitude-the direction and angle alpha

For the vector 100i+150j-300k kN determine its magnitude, the direction, angle alpha, beta, and gamma and the unit vector. magnitude = 350 kN angle alpha is suppose to = 59 degrees

  Calculate actual cost-earned value and planned value

he project duration is planned for 20 weeks. The project budget is $40,000 and is planned to be spent on a level bases through out the project. You are at the end of week 10, the accounting department tells you the project has spent $19,500

  What might account for the errors in the estimation

A projectile is fired into a block of wood that is hanging on the end of a light rigid rod. How you would estimate the speed of the projectile. What might account for the errors in your estimation.

  Determine what is the average shear stress in the oil

Two parallel plates, one moving at 4m/s and the other fixed, are seperated by a 5mm thick layer of oil of specific gravity 0.80 and kinematic viscocity 1.25 X 10^-4 m2/s.

  How much heat must be supplied to maintain desired temp

A small building that shelters a water supply pump measures 2 m x 3 m x 2.4 m high. It is constructed of 1- cm thick wood having a thermal conductivity of 0.126 W*m^-1*K^-1.

  Determine the angular speed n of the wheel of the rim

The cart has a velocity of 4 ft/sec to the right. Determine the angular speed N of the wheel so that point A on the top of the rim has a velocity (a) equal to 4 ft/sec to the left, (b) equal to zero, and (c) equal to 8 ft/sec to the right

  What is the probability of 2 or more such floods in 10 years

A hydrologic structure (e.g. a dam or a dike) is said to be designed for the N-year flood if it has a capacity which will be exceeded only by a flood equal oto or greater than N-year flood.

  Determine the discharge in the channel in m

A very long rectangular channel connects two reservoirs and has a longitudinal slope of 0.005. The channel has a width of 10 m and a Manning’s n of 0.030.

  What are the inputs needed to determine stress a polymer

What are the inputs needed to determine stress a polymer with a fixed end on one side, and the other with a tension force of 50,000 lbs a year after the load is applied?

  Suggest an alternative engineering design solution that

Stormwater controls are typically designed by civil engineers. Stormwater is collected in pipes below the ground and routed to nearby surface water

  Development of the lateral surfaces of the pyramid

Axis of the hole is perpendicular to VP. Draw elevation, plan and development of the lateral surfaces of the pyramid.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd