Determine the minimum volume of concrete needed to keep the gate(1m wide) in a closed position, with l=2m. Note the hinge at the bottom of the gate

Reference no: EM13323626

Questions Cloud

Compute the distance traveled before takeoff : An airplane accelerates down a runway at 3.20 m/s2 for 32.8 s until is finally lifts off the ground. Determine the distance traveled before takeoff
Evaluate the concentration of compound in the cuvet : The absorbance at 340 nm was 0.427 in a 1.000 cm cuvet. The molar absorptivity for this compound at 340 nm is = 6130 M-1 cm-1. Calculate the concentration of compound in the cuvet
What is the resulting charge on each sphere : Four identical metallic spheres with charges of +2.2 µC, +6.2 µC, ?6.6 µC, and ?3.6 µC are placed on a piece of paper. What is the resulting charge on each sphere
How many times does the top module call each subordinate : What tool would not be useful in preparing a Module Specification for a programmer to code the Update Account Module?
Determine min volume of concrete needed to keep the gate : Determine the minimum volume of concrete needed to keep the gate(1m wide) in a closed position, with l=2m. Note the hinge at the bottom of the gate
Explain how many grams of reactant are left over : How many grams of reactant are left over when 132.00g of propane are reacted with 96.0g of oxygen to form carbon dioxide
Determine the distance between the charges : When point charges q1 = +7.7 µC and q2 = +5.7 µC are brought near each other, Determine the distance between the charges
What constant gas pressure is required of the area : a 2kg piston accelerates to 20m/s from rest. what constant gas pressure is required if the area is 10cm^2, the travel is 10cm and the outside pressure is 100Kpa
Define elimination reaction of alkene with sodium methoxide : This question about comparing elimination reaction of alkene with sodium methoxide and potassium tert-butoxide. cyclohexane occurs as the cis cycloalkene rather than the trans isomers. explain

Reviews

Write a Review

Civil Engineering Questions & Answers

  Estimate the depth change in the lake in feet during 1-year

The evaporation rate from the surface of a 3,650-acre lake is 100 acre-ft/day. Estimate the depth change in the lake in feet during a 1-year period if the net inflow to the lake is 25 cfs. Is the depth increasing or decreasing

  At what speed in stillwater will cavitation first occur

A sphere L ft in diameter is moving horizontally at a depth of 12 ft below a water surface where the water temperature is 50°F. v max = 1.5 V0. where V0. is the free stream velocity and occurs at the maximum sphere width.

  Write material balance to describe rate of change in amount

Draw a diagram of the room with all of the important parameters noted with symboles. Write a material balance to describe the rate of change in the amount of benzene in the air of the room starting from the time the bottle was opened onwards.

  What is the irreducible water saturation of the core plug

A chalk core plug having a pore volume of 17.0307 cm3 is fully saturated with reservoir brine. A synthetic oil flood is conducted on this plug. It is found that 12.25 cm3 of reservoir brine was displaced from this plug by the synthetic oil.

  Determien what is the degree of saturation of the specimen

A soil specimen is 38 mm in diameter and 76 mm long and in its natural condition weighs 168.0 g. When dried completely in an oven the specimen weighs 130.5 g. The value of Gs is 2.73.

  Determine the magnitude of the resultant of the two forces

Obstruction due to underground electric lines requires that the x coordinate location of point C must be three feet as shown in the figure, as opposed to 1.5 ft for point B. Determine the magnitude of the resultant of the two forces

  Determine the heat transfer assuming process is reversible

he oxygen is compressed from 95 kPa, 20 C to 300 kPa, isothermally. Determine the heat transfer assuming (a) the process is reversible, (b) the process is irreversible such that 20% more work is required than the reversible case.

  What is the change in the strips width and thickness

Thin rubber strips are used to provide increasing resistance to orthopedic patients during large motion exercises. The sheets shown are 0.03125 in thick and 3 in. wide. Say the rubber properties are 120 psi and v= 0.47.

  Determine how much pressure is developed in the system

A multiple-piston hydraulic jack has two output pistons, each with an area of 250 cm^2. The input piston, whose area is 25 cm^2, is concerned to a lever that has a mechanical advantage of 9:1.

  Find the position where the net electric field is zero

Given that the seperation distance between the charges is 5m, q1 = -3q2, find the position where the net electric field is zero. Do not use infinity.

  Develop a simple urban constructed wetland design

Develop a simple urban constructed wetland design.

  Calculate the percentage change in volume based on volume

The natural water content of a saturated soil is 41% and its shrinkage limit = 20%. Gs (sp. gravity of solids) = 2.75. Calculate the percentage change in volume based on its volume at its natural water content if the soil is dried to a water conte..

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd