You have been employed as a member of a production improvement task force for a Drive Shaft Manufacturing Company (DSMC). DSMC has been experiencing a severe backlog in sales orders due to antiquated machinery and poor production planning. The Company has just received an unprecedented contract to supply 450 drive shafts by the process given below. However, finances at present are tight and only £250,000 can be invested. Some of the order can be sub-contracted. Your task is to determine the maximum capacity of the current production line after the investment of the £250,000 hence how many parts must be made by the sub-contractor. The cost list of potential capital improvements is given on next page.

The current output of the line averages 180 shafts on the two 38-hour shift system.

Process:

The drive shaft manufacture starts with a bar of 0.3 metres long that is cut into three parts (blocks). The operations are as follows (one machine at each operation unless stated otherwise):

1. The bar arrives based on vendor's supply schedule in lots of 3, every 30 minutes. The bar stock buffer can hold only 10 bars.

2. In the Saw machine, the time to cut the bar into 3 blocks is 6 minutes. Blade A is replaced every 40 operation and blade B every 30 operations. Set-up time is uniformly distributed between 10 and 15 minutes. Time between failures is NEGEXP with mean of 100, and the repair time follows triangular distribution with min 10, mode 25 and max 30. An operator is required to run this machine.

3. After sawing the blocks go to a Fixed conveyor with index time = 0.25 min, length 20 parts.

4. Once sawed the blocks must be coated for protection. The Coating machine takes 6 parts per cycle and has a cycle time of 60 minutes. Every 10 cycles, the machine is set-up for 5 minutes.

5. Once coated, the blocks are placed in a staging buffer of capacity 10 part, adjacent to the Inspector.

6. The Inspector draws from the staging area one block at a time and checks the quality of the block's coating. The cycle time = 20 min, set-up = 1min per part. If the coating is bad, the Inspector puts the rejected block into a Rework buffer of capacity 10. The reject rate is 20%, and rejects are returned to be recoated.

7. Parts are cured on an individual basis on a chain conveyor (Hardener) of capacity 10 parts through a furnace, a process on a first in first out basis. Heat-treat time is 60 min.

8. The hardened parts go for Gear cutting: cycle time 2 minutes + 1 minute load and unload that is manual, 2 machines, tool change every 100 parts for 10 minutes. Breakdowns mean time to failure 5000 minutes NegExp, repair time normal mean 80 minutes σ = 10. One operator runs two machines and changes cutter.

9. Four parts are Loaded into a special fixture in 4 minutes before entering for grinding; 10 fixtures are available in the system and are stored in a Fixture buffer if not used.

10. The 4 parts and the fixture are loaded to the Grinders (2 machines): cycle times M/c 1 = 35 min, M/c 2 = 40 min; Time between failures is normal distribution with mean = 75 min, SD = 15. The repair time is NEGEXP of mean 15 min and is repaired by the Saw operator.

11. Once ground, the fixture is Unloaded in 4 minutes. The fixture returns to the Fixture buffer and the parts go to two buffers of capacity 10 parts each.

12. The parts are then cleaned in the Wash machine, a multi stage machine with 5 stations, 1 part per station, cycle time = 15. Time between failures NEGEXP of mean 120 min, the repair follows Erlang distribution with mean = 20 min, K = 3. The machine is set-up every 100 operations, time 5 min. Set-up and repair are carried out by the Saw operator.

13. The Plating process follows and takes 36 parts per cycle, cycle time 36 minutes, buffers on machine 72 parts both before and after process. Due to chemical change on Monday morning, 4 hours are lost. An operator is required.

14. The parts are then washed with a Wash machine identical to 12.

15. The finished parts are Packed in Pack cycle time of 1.25 min. Packed into flat pack boxes one drive shaft per box. Boxes arrive in batches of 1000, frequency of deliveries to be determined by model. One operator required.

16. The boxes are finally shipped.

Objective

Increase output. Budget £250 000

Production time: two 38-hour shifts (total 76 hours) per week, determine an appropriate warm-up period.

Costs:

 

Cost in £

BUFFERS

Per Part capacity in any Buffer

 

100

SAW:

 

Identical new saw

40,000

Cycle time decrease per 10%

5,000

Setup decrease per 10%

8,500

New operator

32,000

Increase time between failures per 10%

5,000

Decrease repair time per 20%

7,500

BELT CONVEYOR

 

Convert belt to roller

10,000

New conveyor of either type

20,000

Cycle time decrease per 10%

5,000

COATING MACHINE

 

Increase batch capacity per Part

10,000

Cycle time decrease per 10%

6,500

Doubling number of operations by decreasing setup time

5,000

INSPECTOR

 

New inspector and machine

30,000

Cycle time decrease per 10%

10,000

Setup time decrease per 10%

5,000

Decrease rejection rate by 50%

20,000

HARDEN PROCESS

 

Cut process time by 10 minutes

20,000

Increase capacity per part

10,000

LOADER/UNLOADER

 

New loader or unloader

25,000

Decrease cycle time per 10%

15,000

New fixture

5,000

GRINDER

 

New grinder

80,000

Cycle time decrease per 10%

12,500

Double time between failures

30,000

CLEANER

 

Additional cleaner

16,500

Cycle time decrease per 10%

10,000
   
New GEAR CUTTING 50,000
New PLATING machine
15,000
New PACKING line
5,000

Note: Please present the process in a pseudo format before building the model in Witness.

Reference no: EM131431758

Questions Cloud

Discuss about the it ethics and responsible conduct : Smartphones, PDAs, and software such as Microsoft Office Communicator now have the function to provide presence and location information (e.g. online, in a meeting, busy, idle, etc.) of the users. Decide whether or not the broadcasting of presence..
Stimulus package by using the income multiplier : Please analyze the stimulus package by using the income multiplier. (A tax rebate is a decrease in autonomous tax, the To in the total tax formula mentioned in class).
What principle tools were used to develop the key findings : How did the DHS structure the NPR and what principle tools were used to develop the Key Findings or, Select any one of the 31 core capabilities and address your own assessment of the key findings.
How would you design your organization : If you could do anything you wanted in your current organization without constraints, how would you design your organization, and what would you change
Determine maximum capacity of the current production line : MOD002610 - Modelling & Simulation for Operations Management Assignment case study for Witness modelling and process improvement.
Describe the guidelines for electronic e-mail in health care : There are many emerging trends and information technology (IT) tools used in health care, such as e-mail between the patient and provider, e-prescribing, and computerized physician order entry (CPOE).Describe the guidelines for electronic e-mail i..
Economic and accounting concepts of cost : What are the differences between economic and accounting concepts of cost? How would you manage the costs associated with a value-creation activity? How do costs of operations relate to the strategy of the organization?
Description of implementation logistics : Description of implementation logistics (When and how will the change be integrated into the current organizational structure, culture, and workflow? Who will be responsible for initiating the change, educating staff, and overseeing the implementa..
What can be done to keep quality data : As part of the electronic health record (EHR) implementation process, it is necessary to ensure that the quality of data in the current systems is of high quality. Complete the following in 500 words:Discuss the importance of data quality, and giv..

Reviews

Write a Review

Operation Management Questions & Answers

  Book review - the goal

Operations Management is about a book review. Title of the book is "Goal". This book has been written by Dr. Eliyahu Goldartt. The book has been appreciated by many as one of those books which offers an insight into the operations and strategic capac..

  Operational plan in hospitality enterprise

Operational plan pertaining to a hospitality enterprise is given in detail in the solution. The operational plan is an important plan or preparation which gives guidelines regarding the role and responsibilities of each and every operation at all lev..

  Managing operations and information

Recognise the importance of a strategic approach to the development and deployment of organisational information systems. Demonstrate an understanding of the importance of databases and their integration to the organisation's overall information mana..

  A make-or-buy analysis

An analysis of the holding costs, including the appropriate annual holding cost rate.

  Evolution and contributor of operations management

Briefly explain Evolution and contributor of Operations management.

  Functions and responsibilities of an operations manager

A number of drivers of change have transformed the roles, functions and responsibilities of an operations manager over recent years. These drivers have not only been based on technological innovations but also on the need for organisations to develop..

  Compute the optimal order quantity

Compute the Optimal Order quantity of DVD players. Determine the appropriate reorder point.

  Relationship to operations practice in the organisation

Evaluate problems in operations and identify approaches to overcoming them. Critically evaluate operating plans and identify areas for improvement. Justify, implement and evaluate changes to operations in line with modern approaches.

  A make or buy analysis

Develop a report for Figi Fabricating that will address the question of whether the company should continue to purchase the part from the supplier or begin to produce the part itself.

  Prepare a staffing plan

Prepare a staffing plan showing the change of your unit from medical/surgical staffing to oncology staffing.

  Leadership styles in different organizations

Ccompare the effectiveness of different leadership styles in different organizations

  Risk management tools and models

Be able to understand the concept of risk, roles and responsibilities for risk management and risk management tools and models.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd