Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
A developer wants to provide access to a new building from a driveway placed 1000 ft upstream of a busy intersection. He is concerned that queues developing during the red phase of the signal at the intersection will block access. If the speed on the approach averages 35 mi/h, the density is 50 veh/mi, and the red phase is 20 sec, determine if the driveway will be affected. Assume that the traffic flow has a jam density of 110 veh/mi.
Determine what fair amount she should receive if she decides she want to be paid: a. In 2 equal installments - one immediately (at T=0) and one at the end of month 36.
A 1-kg block of dry ice(solid CO2) becomes a gas at room temperature. calculate the volume of gas produced at 25 degrees celsius and 975 kPa.
Water in the amount of 1 lb is contained in a rigid closed tank. Initially the water has a quality of 0.4 at a pressure of 10 lbf/in2. Through a stirrer, work is provided to the water in the tank until the pressure quadruples.
Draw the shear diagram for the shaft. The bearings at and exert only vertical reactions on the shaft
The velocity of a particle traveling along a straight line is v=(3t^2-6t) ft/s , where t is in seconds. if s=4ft when t=0 determine the position of the particle when t=4s what is the total distance during the time interval t=0 to t=4s
Water enters a two-armed lawn sprinkler along the vertical axis (normal to the page) at a rate of 80 L/s and leaves the sprinkler nozzles as 1.5-cm diameter jets at an angle of from the tangential direction.
a rectangular prism box which is floating on water has a length L =1200mm, breadth = 800mm, height = 500mm and mass of 52kg. when the box is loaded with the suspended hexagonal mass, its immersion is 300mm, and when it the mass is placed inside th..
Determine the number of man-hours required to form the structure using data from R. S. Means or other appropriate reference. What is the difference between labor cost and labor pro-ductivity?
A hoist mechanism is attached to the back of a pickup truck. The crate being moved by the hoist shown below weighs 200 lbs. Note: Point A is directly above point B and the vertical distance between points A and B is 16 inches.
Compute the detention time and horizontal flow through velocity. Do these values satisfy the standards for water works, which stipulate detention time is greater and equal to 30 min and 0.5 ft/min =
The total flow then moves to a point W on the traction drive two metres off the ground, and travels through a nine millimetre diameter conduit. Ignoring all friction and minor losses, determine the pressures at points H and W.
Immediately upstream of the treatment plant, the Pine River has an ultimate CBOD of 2 mg/L and a flow of 9 × 105 m3/day. At a distance of 20 km downstream of the treatment plant, the Pine River has an ultimate CBOD of 10 mg/L.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd