Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
Steam enters a turbine with neglible velocity at 4 mpa, 600 degrees celcius and a flow rate of 36000 kg/h. Determine the heat loss from the steam passing through the turbine if the turbine has a power output of 20000 kw
compute the max possible moment at the centerline of the beam and the absolute moment in the beam.
a) What flow rate (m 3/s) does the filter handle during production? b) What volume of water is needed for backwashing plus rising the filter in each filter cycle?
10 kPa of pressure required to push a 3 in^2 piston 5 mm into the compacted soil. Compute the CBR (%) if the same 3 in^2 piston required 100 kPa to penetrate 5 mm in calibrated rock soil.
Use the Bernoulli equation to describe how this manometer can be used to measure the flow rate through the meter.
A 35 feet diameter oil storage tank is built on a 100 ft thick soil layer. The tank exerts an uniform pressure of 1000 pcf on the ground surface. The groundwater table is 10 ft below the ground surface.
Determine the number of completely mixed bioreactors (detention time of 45 min each) that would be required to meet the phenol discharge limit of 5 mg/L. The first-order removal rate constant is equal to 6.1 hr -1
An industrial building has floor area of 5 m by 8 m and is 3 m high with a door 1 m wide and 2 m high. Leakage of transformer oil from a pump occurs and is ignited. What is the maximum area of spill in (m^2) if flashover is to be avoided.
Swimmer A immediately starts walking toward B at a speed of 2ft/s relative to the raft. Knowing that the raft weighs 300 lb, determine (a) the speed of the raft if B does not move, (b) the speed with which B must walk toward A
Use microsoft excel functions to find the net present worth of the project, and the internal rate of return,and the annual worth of the project?
two strips of a plastics material are bonded together as shown. The average shearing stress in the glue must be limited to 1000 kpa. what length L of splice plate is needed if the axial load carried by the joint is 55 kN and the width (W) is 315 m..
a tank contains 650 cubic feet of water.the water will be applied on 7 acres of land. What would be the the depth of water im millimeters on the land assuming that there are no losses
Determine the design hourly volume for the road below, recommend the K factor first.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd