Determine drop structure is to be installed as grade control

Assignment Help Civil Engineering
Reference no: EM13308335

A 10-feet trapezoidal channel is designed to carry a discharge of 1,000cfs with side slopes: Z1 = 4 and Z2 = 5. The channel bed slope is 0.04 ff/ft and has Manning's N of 0.03. To protect the channel from erosion, the normal flow velocity for the design discharge has to be reduced to 7.0 fps or below, and the flow Froude number must be reduced to 0.80 or below. To satisfy the above criteria, a drop structure is to be installed as a grade control for a reach of 200 feet.

Reference no: EM13308335

Questions Cloud

Determine elevation and stationing of high point pvc and pvt : a 520 ft long equal tangent crest vertical curve connects tangents that intersect at station 340 00 and elevation 1325 ft the initial grade is if 4 and the final grade is 2.5.
Management deals with these two sometimes competing goals : The Theory of the Firm document, the Friedman article, and the information in chapter 4 argue that the main goal of a firm in a market economy is to maximize profit (shareholder wealth)
Obtain the force on the car : A laserpointer has a beam intensity of 37 W/m2 and a beam radius of 3.1 mm. what is the force on the car
Identify how business ethics social responsibility : Identify how business ethics, social responsibility, and sustainability are interrelated.
Determine drop structure is to be installed as grade control : To protect the channel from erosion, the normal flow velocity for the design discharge has to be reduced to 7.0 fps or below, and the flow Froude number must be reduced to 0.80 or below.
Evaluate statements of an expression language : Project involves completing and extending the C++ program that evaluates statements of an expression language contained in the module 3 case study.
Explain the average length of stay per room type : What is the average length of stay per room type. What is the average number of visitor per room type. What is the base income per room (i.e., length of visit multiplied by the daily rate) during a specified period of time
Modify the test scores program from the above debug : Also print a report of the each student's test grades, average and final grade as a table, and then print the averages of each Test and overall Test Average, as well as highest Test Grade of all Tests and the student with the highest class grade.
What is the planes new velocity : A plane is flying southeast at 200 km/h. Suddenly, it encounters wind heading 40 degrees north of east at 35 km/h. What is the planes new velocity

Reviews

Write a Review

Civil Engineering Questions & Answers

  Engineering ethics and ethical issue

what is the engineering ethics course where to write about any engineering ethical case and discuss the ethical issue?

  Engineering ethics and concept and cases

what is the engineering ethics case related to civil engineering with reference and discuss all the engineering ethics issues which covered the "Engineering etics concepte and cases?

  Transportation and management

In the construction management, there is a lot of procurement route that are necessary and suitable for the construction industry.

  Supporting Investment Promotion: ERNST & YOUNG

Ernst & young is currently providing support to various sectors. In this regards it was felt that if this report is able to document good practices currently being adopted or planned in ceramic sector.

  Personalized Cancer Therapy-A step forward

Cancer is the uncontrolled growth of abnormal cells in the body resulting in tumours that can be benign or malignant (cancerous cells). A proper treatment is necessary to fight with this serious disease.

  Discuss the different environmental companies

Discuss the different agencies, institutes, centers, different environmental companies that are active in UAE.

  Develop a simple urban constructed wetland design

Develop a simple urban constructed wetland design.

  Evaluate company performance in relation to GRI standards

Evaluate company performance in relation to GRI standards and comment on Stigler's theory.

  Water system design

Determine the corresponding error in the computed discharge

  Hydraulic behaviour in open channel

Describe how test flumes and associated equipment are used to assess and confirm hydraulic behaviour in open channel

  Write a paper on steel sustainability

Write a paper on steel sustainability.

  Writing case study about bridge collapse

Writing case study about bridge collapse

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd