Reference no: EM13313342

Two equations govern the flow of runoff on a slope. The first is the continuity equation (conservation of mass) and the second is an equation describing conservation of momentum. The continuity equation is just the water balance for the slope or any small portion of the slope and can be given as: p - fp = RO where i = rainfall rate, fp = infiltration capacity, and RO = runoff rate, all expressed as a depth per time, e.g. mm h-1 . Since Q= VA, the Q for each unit width = i*1*depth*length of slope. The momentum, or flow equation we often use is Manning's equation: V = 1.49 R2/3 S0.5.


Application:

You have been asked to determine the rate and depth of flow from a parking lot at a shopping mall and recommend the size of the gutter needed to accommodate the runoff from the lot. The lot is 300 feet by 500 feet. The overland flow portion is the 300 feet and has a slope of 2.0%. Flow will enter the gutter along the 500 feet at the bottom of the overland flow. The gutter has a slope of 1.0 % and a rectangular cross section with a bottom width of 1.5 foot.

Determine the following:

1. The discharge, q, along the 300 feet of overland flow,

2. The depth, d, of flow along the 300 feet of overland flow, and

3. The discharge, Q, and depth of flow in the gutter.

Someone spills a container of gasoline at the farthest corner of the parking lot during the storm. Estimate the average time for the gasoline to reach the outlet of the gutter.

Procedure:

1. Use a 1/2-hour duration, 10-year recurrence interval storm for the exercise. Assume that the rainfall occurs at a uniform intensity during the 1 hour duration. You can use the IDF (Intensity-Duration-Frequency) curves for Region 2 in Precipitation in Connecticut available

2. Determine the discharge along the slope of the lot in cfs per foot of width across the lot for every 10 foot increment. Using Manning's equation, determine the depth of flow down the lot, i.e. from the top to the entrance to the gutter, again at 10 ft increments. The surface of the lot is older, rough asphalt which has an 'n' value = 0.10 for shallow flow. NOTE: this ‘n' maybe higher than typically given, but we assume at first that the flow is very shallow.

3. Determine the discharge along the gutter and calculate the depth needed for the gutter at its outlet. The gutter is made from concrete which has an 'n' value = 0.04.

4. In the design of storm water control systems, engineers often will add "freeboard" to the calculated depth of a channel to account for blockage, changes in 'n', etc. Determine if 0.5 feet of added depth to the gutter will accommodate the 100-year, 1/2-hour storm.

5. Using the velocities calculated from Manning's, determine the time it takes for the gasoline to reach the outlet of the gutter. State any assumptions involved in your calculations

Reference no: EM13313342

Questions Cloud

What are the masses of gravel-sand and water per cubic meter : The design of a concrete mix requires 1173kg/m3 of gravel in SSD condition, 582 kg/m3 of sand in SSD condition, and 157kg/m3 of free water. The gravel available at the job site has a moisture content of 0.8% and absorption of 1.5%
Door-to-door sales department and released all employees : A cable company closed its door-to-door sales department and released all employees of that department after settling a discrimination complaint by one of the department's employees.
How long is it before the rain will come to a complete stop : a 40 x 10^3 kg train is travelling at 8.3m/s when the engineer sees a sheep on the tracks. she throws the emergenxy brakes on. How long is it before the rain will come to a complete stop
Explain what is the ph of the equivalence point : What is the pH of the equivalence point of the two solutions if you then titrate these solutions separately with the NaOH solution? The Ka for acetic acid is 1.8e-5.
Determine discharge-q and depth of flow in the gutter : The continuity equation is just the water balance for the slope or any small portion of the slope and can be given as: p - fp = RO where i = rainfall rate, fp = infiltration capacity, and RO = runoff rate, all expressed as a depth per time
Determine the magnitude of the force : A box of mass 50 kg is at rest on a horizontal frictionless surface. A constant horizontal force F then acts on the box and accelerates it to the right. What is the magnitude of the force
Build up capacity in anticipation of demand : Management may choose to build up capacity in anticipation of demand or in response to developing demand.What is the advantage and disadvantage of both approaches?
Extended disability leave for pregnancy : An accounts receivable supervisor was laid off by her employer after taking an extended disability leave for pregnancy. She claimed that the employer discriminated against her on the basis of gender and ability to bear children, stating that two male..
What is the change in momentum of player : two basketball players collide head on. play a weighs 80 kg and is travelling 2.5m/s to the right while player b weighs 68 kg and is travelling 1.2 m/s to the left, what is the change in momentum of player a

Reviews

Write a Review

Civil Engineering Questions & Answers

  Compute the magnitues of all the forces acting on member

Compute the magnitues of all the forces acting on member CDE of the frame. There are pins at C D and E and an 80 kelp force on the right. Length measurements are in ft.

  What is the departure rate when the queue reaches vehicles

The arrival rate at a parking lot is 6 veh/ min. Vehicles start arriving at 6: 00 P. M., and when the queue reaches 36 vehicles, service begins. If company policy is that total vehicle delay should be equal to 500 veh-min, what is the departure ra..

  What is the axial force in member hj

The frame shown is used to support high-tension wires. If W = 200 lb, b = 3 ft, a = 30°, what is the axial force in member HJ?

  Calculate horizontal force required to hold hose in place

Diameter of the hose and the nozzle are .25ft and .1ft respectively. If the pressure inside the hose is 60 psig and the flowrate is 1.2 ft^3/s, calculate the horizontal force required to hold the hose in place.

  Determining axial load of a dense sand

A dense sand has an effective friction angle of 43 and c'=0. A dry, 2.8-inch diameter sample is tested in drained triaxial shear with a confining pressure of 2500 psf. What axial load, P (in pounds), will be required to fail the sample?

  Magnitude of shaft work obtained from the turbine

If the amount of heat transfer in the HE unit is 2460 kJ per kg of steam, what is the magnitude of shaft work obtained from the turbine in kW?

  Calculate steady state concentration of organic n into lake

Colette Lake has a surface area of 103 ha and a mean depth of 8 m. The pH of the water is 7.6. The lake receives surface water from a lake upstream, rainfall, and diffuse groundwater input. Atmospheric inorganic N deposition is insignificant.

  Whether proportional limit is exceeding for either material

To prevent this high compression load from buckling the copper pipe, a solid steel support of 2 1/2 inch diameter is placed inside the copper pipe. The copper pipe is 8.000 inches long. The steel support is 8.0001 inches (exactly 1 mil = 1/1000 in..

  A three point problem can be solved by which method

The diffrence b/n the sum of angles of a plane triangle and the sum of angles of sph triangle is one second. when the triangle on the earth surface has an area of about

  What are two types of variables that can be used for values

What are two types of variables that can be used for values that are less than 128, and describe what is the difference between the variables, how to declare them, and the memory allocated and the numerical range for both.

  Determine diameter of 200 m section commercial steel pipe

determine diameter of 200 m section commercial steel pipe (darcy's friction factor f = 0.0115) that carries a flow of 0.24 m^3/s and allowable head loss ove the section is 3.5 m.

  Compute the elevation and station of the bvc and evc

A -2.8% grade line meets a +3.6% grade line at station 125+00 at elevation of 1631.04. Assuming a length of curve is 650feet, compute the elevation and station of the BVC (PVC) and the EVC (PVT).

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd