Determine cir and fdr with foamed asphalt

Assignment Help Civil Engineering
Reference no: EM13322320

The pavement structure consists of 160 mm of hot-mix asphalt (HMA), 150 mm of granular base and 450 mm of subbase placed over silty clay subgrade. The pavement is 20 years old and its current PCI is 50. The pavement currently exhibits low to medium and localized high severity alligator cracking, low to medium severity rutting, low severity raveling and low severity block cracking. The anticipated traffic loading is 10,000,000 ESAL's. The cost of construction is as follows: HMA $90/t of surface course and $70/t of binder course; granular base $18/t; subbase $12/t; tack coat $0.4/m2. Assume the following other costs, if you need them: CIR $14/m2; FDR with Foamed Asphalt $15/m2; crack rout and seal $2.5/m; and patching (mill 40 mm and patch 40 mm) $15/m2. If you consider a structural overlay, assume 40 mm of HMA surface course and 50 mm of binder course. Assume a discount rate of 4%. Carry out life cycle cost analysis.

Reference no: EM13322320

Questions Cloud

How long did the electric heating system run that night : A passive solar house that is losing heat is outdoors at an average rate of 50,000 kJ/h is maintained at 22oC at all times during a winter night for 10h.
What can you say about the index of refraction of the liquid : A beam of light is emitted 8.2cm beneath the surface of a liquid and strikes the surface 7.2cm from the point directly above the source. what can you say about the index of refraction of the liquid
Create an array of five shippedorder objects : Create 4 Order class fields: order number, customer name, quantity ordered, and total price. Create public accessors for each field except total price.
State a reaction mechanism for the dehydration : Write a reaction mechanism for the dehydration of 4,5-dimethyl-3-hexanol in concentrated phosphoric acid. Use curved arrows to show electron movement and clearly show the major product formed.
Determine cir and fdr with foamed asphalt : The pavement structure consists of 160 mm of hot-mix asphalt (HMA), 150 mm of granular base and 450 mm of subbase placed over silty clay subgrade. The pavement is 20 years old and its current PCI is 50.
Find the direction of the electron force on this charge : A charge q=-1.0 nC is instantaneously at a place where the electric field is 45 kN/C due east. hat are the magnitude and direction of the electron force on this charge
The statement of cash flow under the indirect method : The below is a list of activities to be included in the preparation of UMUC's 2013 statement of cash flows. Prepare, IN GOOD FORM, the statement of cash flow under the indirect method.
What was the change of the systems electric potential : An electron moves from point A where the potential is Va=+20.0kV to point B where the potential is Vb=- 40.0 kV. what was the change of the system's electric potential
Percentage-of-completion method in accounting for long-term : UMUC contracted to build a new hotel for $800,000 that will take 3 years to complete. The following information pertains to the contract. UMUC uses the percentage-of-completion method in accounting for long-term contracts.

Reviews

Write a Review

Civil Engineering Questions & Answers

  Calculate the runout length with an allowable stress

An 80-mil (2 mm) HDPE geomembrane with an allowable stress of 1,300 lb/in2 rests on a 3(H):1(V) side slope. A 18-inch thick cover soil with a unit weight of 110 lb/in3 (also unit weight of the back fill soil in the anchor trench) is placed of the ..

  How many tickets are given out on a particular day

The number of parking tickets issued in a certain city on any given weekday has a Poisson distribution with parameter  = 50. What is the approximate probability that 1 between 35 and 70 tickets are given out on a particular day

  Determine the most economical alternative of return analysis

Using Rate of Return Analysis, determine the most economical alternative below. Assume a minimum attractive rate of return of 6%, and a 5-year life with no salvage value for each. The alternatives are mutually exclusive

  At what depth will 400 cfs flow uniformly in an earth lined

At what depth will 400 cfs flow uniformly in an earth lined (n = 0.025) trapezoidal canal of base width 15 ft having side slopes 1 on 3 if the canal is laid on a slope of 1 in 10,000.

  Formulate and solve the minimum weight design

consider the cantilever beam-mass system. formulate and solve the minimum weight design.

  Compose a list here of the geological terms

compose a list here of the geological terms that you encounter in this reading that you could not define and explain in a test situation.

  Calculate rate at which entropies of 2 reservoirs change

A completely reversible air conditioner provides 21,000Btu/h of cooling for a space maintained at 81degF while rejecting heat to the environmental air at 91degF.

  Determine the gravitational attraction between two spheres

two identical spheres of radius 8 in and weighing 2 lb on the surface of the earth are placed in contact. find the gravitational attraction between them.

  Estimate particle size will be collected with efficiency

A cyclone is designed with an inlet width (W) of 12.0 cm and has four effective turns. The inlet gas velocity is 15.0 m/s and the particle density is 1.70 g/cm3. (a) Estimate the particle size that will be collected with 50 % efficiency.

  Find pressure at the forward and rear corners along bottom

A closed box with horizontal base 6m x 6m and height of 2m is half-filled with water and is accelerated Ax=4.9 m/sec^2 and Ay=-2.4 m/sec. find the pressure at the forward and rear corners along the bottom.

  How long will it take for primary consolidation settlement

A compressible 12-ft clay layer beneath a building is overlain by a stratum of sand and gravel and underlain by impermeable bedrock. The total expected primary consolidation settlement of the compressible clay layer due to the building load is 4.6..

  Calculate the flow depth y3 of the sluice gate

A rectangular channel carries discharge of 10 m^2/s per unit width, with a sluice gate. Calculate the flow depth y3, if a hydraulic jump forms downstream of the sluice gate when y1 = 20 m.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd