Determine a composite scs runoff curve number

Assignment Help Civil Engineering
Reference no: EM13557115

1.How many tons of asphalt concrete will be required to overlay a 3-mile-long, 24-ft.-wide road with 2.5 in. of wearing course asphalt concrete that has a density of 146.3 pcf?

2.Using the phi index calculated in part c, determine the volume of direct surface runoff (acre-ft) that would result from the following: hour: 1,2,3,4 ; intensity (in/hr): 0.40,0.05,0.30,0.20. phi index found to be 0.038 in/hr

3.Determine a composite SCS runoff curve number for a 600-acre basin that is totally within soil group C. The land use is 40 percent contoured row crops in poor hydrologic condition and 60 percent native parture in fair hydrologic condition.

Reference no: EM13557115

Questions Cloud

Describe the changes in phases and its structure : Consider a steel (iron) with 0.2 wt% C. Describe the changes in phases and its structure as it is heated under equilibrium conditions to 850 (deg C).
What are the relative amounts of the primary or proeutectoid : When the 1.10 wt% C steel is cooled under equilibrium conditions from 925 (deg C), (i) what are the relative amounts of the primary or proeutectoid phase, the pearlite, and the total ferrite phase immediately below the eutectoid temperature
Show how the gibbs energies of each of these phases : The standard molar entropies of water ice, liquid and vapor are 37.99, 69.91, and 188.83 J K-1mol-1, respectively. On a single graph, show how the Gibbs energies of each of these phases vary with temperature between – 20 C and 150 C
Calculate the maximum mixing height in meters : Compute the critical buckling load for a 2.5m timber column of full size square section 0.10m x 0.10m. The column has pinned ends(k=1). Assume the modulus of elasticity is 12Gpa and that the Euler formula applies.
Determine a composite scs runoff curve number : Determine a composite SCS runoff curve number for a 600-acre basin that is totally within soil group C. The land use is 40 percent contoured row crops in poor hydrologic condition and 60 percent native parture in fair hydrologic condition.
What is the firms cost of capital before taxes : A firm's stockholders expect a 15% rate of return, and there is a $12M in common stock and retained earnings. The firm has $5M in loans at an average rate of 7%. The firm has raised $8M by selling bonds at an average rate of 6%. What is the firm's co..
Calculate work done : Tank A has a volume of 100 liters and contains saturated vapor r-134 at 30C. With the valve open slightly flow enters cylinder B. a pressure of 200kpa is required to lift piston in b. the process ends when the pressue at A drops to 200kPa.
What is the elongation of a rectangular bar : What is the elongation of a rectangular bar (cross section 2 inch * 2 inch length 4 ft) When it is subjected to an axial load of 80,000 lbs. Assume the material of the bar has the following properties G = 7,700 KSI, V =0.30
Calculate the active and passive pressures at the lower end : A line of sheet piling is driven 4m into a firm clay and retains, on one side, a 3m depth of fill on top of the clay. Water table level is at the surface of the clay. The unit weight of the fill is 18kN/m3 and the saturated unit weight of the clay is..

Reviews

Write a Review

Civil Engineering Questions & Answers

  The device shown is used in the semiconductor industry to

the device shown is used in the semiconductor industry to polish silicon wafers. the wafers are placed on the faces of

  Determine the bending moment at the intermediate support

The left-hand span is 16 ft and the right-hand span is 20 ft. The beam supports a uniform load of 900 plf, which includes its own weight, over the entire 36 ft and also a concentrated load of 10,000 lb applied at a point that is 5 ft from the left..

  Determine the location of the deepest point of the curve

The elevation of the curve at its deepest point must be at elevation 168.00 feet or higher to clear a major pipe installation. If the PVC is at station 0+00 with an elevation of 176.20 feet, determine the location of the deepest point of the curve..

  Determine which driver will be first to displace laterally

Vehicles A and B are traveling toward each other in the opposing lanes on a straight segment of a two-lane highway at 35 and 40 mph respectively. If the critical rates of angular change of the two drivers are 0.0065 and 0.0055 rad/s,

  Calculate the compressive strength of the concrete

A concrete cylinder of height 8 inches and diameter of 4 inches was tested in the lab. The maximum compressive force was found to be 150,000 lbs and a tensile force of 25000 lbs.

  With what velocity will air enter room under laboratory door

Laboratories containing dangerous materials are often kept at a pressure slightly less than ambient pressure so that contaminants can be discharged through an exhaust system rather than leaked through cracks and around doors to other parts of the ..

  Determine how many lamps are required for a flow

A membrane biological treatment plant effluent must be disinfected to what level prior for use as unrestricted recycled water. For a flow of 4 mgd and peak flow of 6 mgd, how many lamps are required

  Base of each standpipe

Determine: a) the height of the water, with respect to the base of each standpipe, and b) the effective stress at the depth of each standpipe, at the following times:

  Determine what is the outward force on a window

If the internal pressure of the aircraft interior is 100 kPa, what is the outward force on a window. the window is flat and has an elliptical shape wiht lengths of 300 mm along the major axis and 200 mm along the minor axis.

  The secondpicture is the exact same thing but horizontal

The system shown consists of a member which is built in to rigidfoundations at both ends. It is unstrained in the horizontalposition. But then it is put in an upright position, and hence issubject to gravity. Find the stress and strain as a function ..

  What is the original estimated duration of the project

The initial schedule called for 500 feet of pipeline to be installed each week, with the total construction cost projected to be $25 million. After 8 weeks, 4750' of pipeline has been installed at a cost of $11.25 million.

  What are the spcs83 coordinates and convergence angle

What are the SPCS83 coordinates and convergence angle for a station in the Colorado Central zone with geodetic coordinates of 39° 44' 40.74141"N, 105° 00' 07.48466"W

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd