Determine a complete material requirements plan

Assignment Help Operation Management
Reference no: EM13752924

Use the following information and the attached editable MRP tableau worksheet to determine a complete material requirements plan for the 5 week planning horizon. A garden equipment manufacturer has a product that it makes which is represented by the following product structure tree along with other pertinent data:

                                                                     ABC-51

                                       --------------------------------------------------------------

                                        l                                 l                                       l

                                        l                                 l                                       l

                                      W                              X (3                                     L

                                       l                                                                           l                        

                                      l                                                          --------------------------------

                                     P (4                                                       l                                   l

                                                                                                  l                                   l          

                                                                                                 P                                  R (2

Inventory Records File

Item

Lead Time

On Hand

Lot Size

Safety Stock

Sched. Receipt

ABC-51

1

15

L4L

0

---

L

1

12

L4L

0

---

P

1

53

100

10

140 in wk 1

R

1

30

L4L

10

28 wk 1

W

1

10

20

0

---

X

2

25

40

0

---

Master Production Schedule (Weeks)           

                Product                 1                      2                        3                         4                        5

                 ABC-51                0                      0                       50                        0                       75


 

Horizon Period

 

1

 

2

 

3

 

4

 

5

 

6

 

7

 

8

 

9

 

 

Item:

 

Lot Size: 

 

LT:

 

SS:

 

Gross Requirements

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Scheduled Receipts

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Projected On Hand

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Net Requirements

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Planned-Order Receipts

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Planned-Order Releases

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Item:

 

Lot Size:

 

LT:

 

SS:

 

Gross Requirements

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Scheduled Receipts

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Projected On Hand

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Net Requirements

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Planned-Order Receipts

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Planned-Order Releases

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Item:

 

Lot Size:

 

LT:

 

SS:

 

Gross Requirements

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Scheduled Receipts

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Projected On Hand

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Net Requirements

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Planned-Order Receipts

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Planned-Order Releases

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Item:

 

Lot Size:

 

LT:

 

SS:

 

Gross Requirements

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Scheduled Receipts

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Projected On Hand

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Net Requirements

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Planned-Order Receipts

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Planned-Order Releases

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Horizon Period

 

1

 

2

 

3

 

4

 

5

 

6

 

7

 

8

 

9

 

 

Item:

 

Lot Size:

 

LT:

 

SS:

 

Gross Requirements

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Scheduled Receipts

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Projected On Hand

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Net Requirements

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Planned-Order Receipts

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Planned-Order Releases

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Item:

 

Lot Size:

 

LT:

 

SS:

 

Gross Requirements

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Scheduled Receipts

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Projected On Hand

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Net Requirements

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Planned-Order Receipts

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Planned-Order Releases

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Reference no: EM13752924

Questions Cloud

Write a brief paper on discovery of a time capsule : write a brief paper on Discovery of a Time Capsule. Explain why each of these is especially important in defining the era of the 1960s.
Prepare a production budget and a direct materials budget : Each unit sells for $25. Each unit requires 2 yards of fabric, which is estimated to cost $3.50 per yard. It is the company's policy to maintain a finished goods inventory at the end of each month equal to 20% of next month's anticipated sales. Cling..
Total value and allocating available capital to the projects : The process of identifying the bundle of projects that creates the greatest total value and allocating the available capital to the projects is known as
Prepare journal entries and financial statement for year end : Prepare journal entries and financial statement for the year ended December 31, 2014. No adjusting entries have been made since December 31, 2013. Company A rented idle office space to Company B on February 1, 2014, at a rate of $1300 per month. on t..
Determine a complete material requirements plan : Use the following information and the attached editable MRP tableau worksheet to determine a complete material requirements plan for the 5 week planning horizon.
Fixed and variable cost behavior : Killy and a key supplier have entered into an arrangement that will result in a per-unit decrease in Killy's variable cost of $0.50 next year. Rental space will also be reduced, thereby decreasing fixed costs by 10 percent. Given the new cost equatio..
Projected return on investment : Develop a three- to four-page analysis (excluding the title and reference pages) on the projected return on investment for your college education and projected future employment. This analysis will consist of two parts:
Assuming that the company uses variable costing : McIntyre Manufacturing produces a single product. Last year, the company produced 20,000 units, out of which 18,000 were sold. There were no units in beginning inventory. Calculate McIntyre's product cost per unit, assuming that the company uses vari..
What other concern are presented by professors woodworth-ney : what other concerns are presented by Professors Kuhlman, Woodworth-Ney and Foner? Were these concerns answered with suffrage? Why, or why not?

Reviews

Write a Review

Operation Management Questions & Answers

  Estimate the average number of cars in the system

Automobiles arrive at the drive-through window at the downtown Urbana, Illinois, post office at the rate of 4 every 10 minutes. The average service time is 2 minutes.

  Compare npv, roi, and payback analysis methods

Compare NPV, ROI, and Payback analysis methods. Discuss advantages and disadvantages of each. Which one of these methods would you prefer to use and why?

  Which alternative is most desirable from an expected cost

The design of a system is to be pursued from one of the available alternatives. Each alternative has a life cycle cost associated with an expected future. The costs for the corresponding futures are given in the following table (in millions of dol..

  How can an organization optimize supply chain management to

supply chain management is the integration of activities that procure materials and services transform them into

  Examine two scholarly sources that may prove valuable

Describe methods that may be helpful in identifying and narrowing your research paper topic. Examine two scholarly sources that may prove valuable as you seek to defend your claims.

  What are the various punishments for fraud

What are the various punishments for fraud and what can we do to educate doctors them early on? Cite were needed.

  What do you mean by strategic objectives describe the

what are strategic objectives? what is the purpose of strategic objectives? what makes an effective strategic

  Calculate the average hourly output

A processor makes two components, A and B, which are then packaged together as the final product. The processor can do only one component at a time: either it can make As or it can make Bs.

  How much does she need to invest each year

How much does she need to invest each year at 5% compounded annually to meet her goal?

  Elucidate what is the production

Due to the physical separation of these 2 steps, an additional delay of 0.5 days is allowed for transportation. If daily demand = 13 units, Elucidate what is the production. Lead Time between Steps 1 also 2.

  An examination of the overall negative effects technologies

An examination of the overall negative effects of new technologies on the safety and security field

  Illustrate the differences between cost-based and

1. what are the differences between cost-based and value-based pricing?2. pricing is based on customer perceptions of

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd