Detail comprehensive strategy for contractor

Assignment Help Project Management
Reference no: EM133546961

INTRODUCTION TO FIDIC AND FIDIC RED BOOK

Company A (the Employer) and Company B (the Contractor) are both private limited companies registered and incorporated as such under the company laws of the Republic of South Africa. The Parties concluded a written construction contract for the supply, fabrication, installation, commissioning and handover of the Power Island Package (which consisted of an 8 MW biomass to electricity generation power plant where wood waste is burned as fuel) in Beaufort West, Eastern Cape on 09 November 2010 in Sandton, Johannesburg. The written contract employs the FIDIC Conditions for Construction Works (1999, First Edition) - the "New Red Book". The Engineer appointed by the Employer in accordance with the provisions of sub clause 3.1 [The Engineer] is Mr. Ready Eddie (PR Eng). The Contractor fabricated, supplied and delivered to Site all the equipment and Plant necessary to complete construction of the 8 MW biomass power plant. Delivery was completed to the satisfaction of the Engineer on 28 July 2014. The Employer was required to give the Contractor right of access to, and possession of, the Site for construction on or before 18 August 2014.

Notwithstanding the Contractor's repeated requests, the Employer failed to give the Contractor right of access to, and possession of, the Site within such times as required by the Contractor to proceed with execution of the Works in accordance with the programme submitted by the Claimant under sub clause 8.3 [Programme] by 15 June 2015. The Employer and Engineer have both failed to enter into any further communications whatsoever with the Contractor on this issue or at all since June 2015.

You are consulted by the Contractor on 5 August 2015 and instructed, with specific reference to the relevant provisions of the Contract, to:

1. Detail a comprehensive strategy (including supporting argument) for the Contractor to implement in order to effectively resolve these unsatisfactory circumstances; and

2. having detailed the aforementioned strategy prepare the necessary correspondence and / or documentation to the Employer and / or the Engineer which you have determined is necessary in order to implement your strategy.

Reference no: EM133546961

Questions Cloud

Despite considerable investment in infrastructure : Despite considerable investment in infrastructure since 1994, South Africa is still plagued by poverty, income inequality and unemployment.
Project risk and project quality plan : What are the documents that are considered input to a project risk and project quality plan?
Chose project risk or project quality management : Chose project risk or project quality management, then discuss the content required per the PMBOK for completing this activity for any project
Discussion section in student engagement study : How is the results section different than the discussion section in a student engagement study? Differentiate between the discussion and the conclusion.
Detail comprehensive strategy for contractor : Detail a comprehensive strategy for Contractor to implement in order to effectively resolve these unsatisfactory circumstances
Meetings-deliverables of this documents : What are the list of Key Reports/Meetings/Deliverables of this documents? What are the contents of this document?
Quality management process : we discussed the importance of a close-out review as part of the quality management process
Representation and equality and current black lives movement : Do you see a connection between the colonists' struggle for freedom, representation and equality and the current Black Lives Movement?
Insurrectionists who stormed capitol often invoke : The January 6th insurrectionists who stormed the Capitol often invoke 1776 to justify their actions.

Reviews

Write a Review

Project Management Questions & Answers

  Create a project schedule and align resources

Create a project schedule and align resources, Analyze project schedule and resource allocation

  Managerial roles and gap analysis

Write a report on Managerial Roles and Gap Analysis

  Questionaire on project management

Questionaire on Project Management

  Describe the market growth rate for product

Describe the market growth rate for product and service.

  Prepare a work plan and project schedule - gantt chart

Design an online system for the human resources department to manage available job positions.

  Project risk management approach

How does a project risk management approach pro-vide an early warning signal for impending problems or issues

  Black-scholes options pricing model

Calculate the payoff and the profits for investments

  Describe the features or characteristics of product

Describe the features or characteristics of your product or service.

  Write paper on inventory management system

Write paper on Inventory Management System.

  Analysis of the overall project risk

Analysis of the overall project risk

  Investment and performance analysis

Evaluate the usefulness of ROCE

  Distribution strategy and project management

Distribution strategy and project management

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd