Reference no: EM1382160
The completion of this assignment will entail the design of the structural fire protection for a simple warehouse building. This assignment is to take place out of class and is open book and notes. However, under NO circumstances are you to discuss this project with other students (or anyone for that matter) in the class. Any student caught violating this policy will be immediately issued a "0" for the assignment.
You will provide a separate engineering calculation and all pertinent reference data (i.e. manufacturer spec sheets, UL designs, etc.) for each of the following questions. Place all calculations in a report folder in a logical order. Provide a table of contents as well.
1. Concerning the wall between the office area and the manufacturing area, answer the following questions:
a. Using NFPA 1, what is the required separation between the office area and the manufacturing area? Assume the manufacturing area is general purpose industrial.
b. Specify a fire wall of appropriate resistance which utilizes masonry. Provide a construction detail of how it is to be constructed. Please note this is a load bearing wall.
c. Specify a fire wall of appropriate resistance which utilizes gypsum wallboard over metal studs. Provide a construction detail of how it is to be constructed. Please note this is a load bearing wall.
2. Concerning the wall between the office area and the manufacturing area, answer the following questions:
a. Specify a fire door for use in question 1b.
b. Specify a fire door for use in question 1c.
3. The office area is required to have a one hour protection on all of its W8x18 columns. Specify:
a. Specify board protection using Type X gypsum wallboard to provide this level of protection.
b. Specify spray fire resistant material. You may not use the specification sheets provided in class for this problem.
4. The manufacturing area is required to have a minimum of 2 hours of protection on all structural members. The columns are W 12x45. Assume you are using normal weight concrete with the reentrant spaces filled. Provide a detail on the required thickness of concrete encasement to provide this level of protection.
5. The roof of the building will be restrained steel bar joists supporting metal rook decking with a cold applied roofing material. Provide a detail of a design that can be used for the roof construction and make sure to select the appropriate spray applied material and calculate the required thickness.
What is your business are being sued for a breach
: What is your business are being sued for a breach of contract. Create a matrix that list each business and compare and contrast your personal liability exposure as a sole owner as a result of the lawsuit.
|
Factor label method to calculate number of grams of kmno4
: Discuss how do use the factor-label method to calculate the number of grams of KMnO4 that you would need to make 100 ml of a 0.0045 M potassium permanganate solution?
|
Many students of the second city training center
: Many students of the Second City Training Center arebusinesspeople looking to gain skills for the corporatecontext. What skills from the world of improvisationalcomedy would be valuable to a business manager?
|
Write program to enter name-number of planet from sun
: Write down the program which permits the user to enter name of planet, and then prints message stating that planet's number when counted outward from sun.
|
Design project
: Specify a fire wall of appropriate resistance which utilizes masonry. Provide a construction detail of how it is to be constructed. Please note this is a load bearing wall - FSE 445 Design Project
|
Reality of the current organizational situation
: According to Senge, leaders must understand this notion, which represents the difference between the "vision" of where the organization could be and the reality of the current organizational situation.
|
Abc airlines has calculated the total costs
: ABC Airlines has calculated the total costs (fixed and variable) for the passenger service flights between Los Angeles, California and Orlando, Florida.
|
The firm is opening its headquarters in chicago
: The firm is opening its headquarters in Chicago and is considering three office locations, which differ in cost due to square footage and office equipment requirements
|
Security of debt-collateral and debtor defaults
: When a debt is secured by property as collateral and the debtor defaults, the creditor may: A) take possession of the property and retain it in full satisfaction of the debt. B) take possession of the property and sell it. C) not take possession of t..
|