Design of the wit sport complex

Assignment Help Civil Engineering
Reference no: EM131035530 , Length: word count:1300

Introduction-

North West Corner of the Cork road camps was founded in January 2016. It was founded by NAME, NAMEand NAME. North West Corner of the Cork road camps is based in CITY, Ireland. As a company we are passionate about harnessing innovation as a positive force for change. We instil this mind-set culturally in every element of our operations and project delivery. We invest heavily in research and development within our engineering facilities where we put the academic theory into practice.

We take our duty to act responsibly at all times very seriously through proactively managing the impacts of our activities on the environment, our people and the communities in which we operate. We believe in employing and developing the very best talent in the industry, challenging them to find and follow a better way and deliver excellence for our clients whilst leaving a lasting legacy for the communities in which we operate. Our depth of knowledge, experience and capability enable us to provide a fully in-house solution to tackle even the toughest challenge, giving the customer the reassurance of quality and safety they would expect when investing in large-scale construction projects.

South East Civil Engineering strives to deliver quality projects safely, on time and within budget. Innovative solutions, engineering ingenuity, adherence to the highest safety and quality standards and professional construction management are the corner stones of North West Corner of the Cork road camps.

What Our Company Strives to Achieve:

"To always be worthy of the respect and admiration TWA customers and employers bring to mind when they hear our name."

We at TWA strive to be an engineering company worthy of high regard. We will do all within our power to construct what our customers want, to retain the level of respect we have reached since our establishment. We ensure our developments reach the standards our customers, employees, suppliers and community have come to expect. In accordance with this, we will always treat our customers, employees and suppliers in a fair and rightful manner.

To our customers, we promise teamwork to fulfil your needs with excellent service. Additionally, we will produce products of the highest quality while always aware of the challenging market.

To our employees, we promise a safe and stimulating working environment, in which work will be enjoyable and rewarding. We endeavour to stimulate learning, teamwork and personal growth in our company, whether on site or in the office.

Safety First Quality Permanently.

To our suppliers, we expect our relationship to be mutually beneficial as this relationship affect our customer's needs.

Mission Statement

We strive to deliver quality projects safely, on time and within budget.

Core Values

Safety: Our number one value is the safety of our employees, subcontractors, clients, and the general public. Safety coincides with production and quality and is an integral part of our business.

PEOPLE: We are successful because people make us successful. We are dedicated to enhancing the lives of those within our company and those that we interact with in the community on a daily basis. Our relationships between our employees, partners and the communities in which we work are critical to the continued success of our company.

Results: We partner with our clients to deliver superior quality projects on time and on budget in a diligent, honest, reliable, efficient and collaborative manner.

Lasting relationships: We are committed to building lasting relationships that will have a positive influence on our clients, employees, subcontractors, community and the construction industry.

Respect: Mutual respect is essential. We respect individuals and their opinions and we exhibit the knowledge, skills and attributes to gain respect from others.

Project Introduction:

North West Corner of the Cork road camps was tasked with the design and construction of The PROJECT NAME for Waterford Institute of Technology. Included in the requirements for this project are:

• The design of The W.I.T Sport Complex with reference to Building Information Modelling (BIM), design of floor slabs, columns and beams.

• Site Investigation.

• Health and Safety.

• Costings.

• Conclusions and Recommendations.

The PROJECT NAME will be purpose built for Waterford Institute of Technology. The new building will be constructed on the North West side of the campus opposite the Tourism and Leisure building. It will be built on a (.....) acre site. The new building and will rise one floorsan 3 section. The firstsection will measure. (.... .....)m2, second section = (........)m2, third section =(......) m2and level 3 = (........)m2 giving an overall floor area of 10800m2. The overall height of the new building will be (........) metres. The new development will house undergraduate and postgraduate facilities and will include state-of-the-art engineering laboratories, research facilities, workshops, computer suites, lecture rooms, canteen and a 350+ seat auditorium.

The main construction material for the new building will be steel and concrete. The new building will be a steel frame constructed using reinforced concrete floor slabs, big steel truss,steel beams and steel columns. The frame will be built on pile foundations as with other buildings on the main college site. Decisions regarding the foundations were made from the results of the site investigation. The building will have a glass façade on parts of the southern and western exposures, white brick on all other exposures excluding the eastern side of the building which will be finished with a white "K- Rend" plaster in keeping with other buildings on the campus. The building will be capped with a waterproof and insulated concrete roof. The decision to use concrete for the roof was to enable future expansion if needed.

Reference no: EM131035530

Questions Cloud

Why do you think us and saudi arabia may have own practice : Why do you think each country may have their own practice in term of reporting the government accounting and budgetary system?
Estimation of stock x''s intrinsic value : Suppose three honest individuals gave you their estimates of Stock X's intrinsic value. One person is your current roommate, the second person is a professional security analyst with an excellent reputation on Wall Street, and the third person is ..
What is the difference between a police officer : What is the difference between a police officer who views his/her position as a career and the police officer who views the position as a job
Ford auto exhange b2b marketplace : Download and review the attached PDF document,.Ford Auto Exhange B2B Marketplace. Click on the URL video link that is listed in the PDF document and watch the video.
Design of the wit sport complex : The design of The W.I.T Sport Complex with reference to Building Information Modelling (BIM), design of floor slabs, columns and beams
Calculate and interpret of financial statements : Using the financial statements provided, calculate and interpret the days to collect ratio for each of the four years presented. Assume credit sales are 15% of total net sales.
Classical v keynesian approaches : Fiscal policies are the actions of Congress on spending and taxing. (Note that this is different from monetary policy, which is the action take by the Federal Reserve to change the money supply.)
Identify and describe a needed change in your workplace : Start with an introductory paragraph that includes the purpose of the paper.
Prepare the journal entry to record the bad debts expense : Prepare the journal entry to record the bad debts expense at year end. Show the balance sheet presentation of the accounts receivable account.

Reviews

Write a Review

Civil Engineering Questions & Answers

  Engineering ethics and ethical issue

what is the engineering ethics course where to write about any engineering ethical case and discuss the ethical issue?

  Engineering ethics and concept and cases

what is the engineering ethics case related to civil engineering with reference and discuss all the engineering ethics issues which covered the "Engineering etics concepte and cases?

  Transportation and management

In the construction management, there is a lot of procurement route that are necessary and suitable for the construction industry.

  Supporting Investment Promotion: ERNST & YOUNG

Ernst & young is currently providing support to various sectors. In this regards it was felt that if this report is able to document good practices currently being adopted or planned in ceramic sector.

  Personalized Cancer Therapy-A step forward

Cancer is the uncontrolled growth of abnormal cells in the body resulting in tumours that can be benign or malignant (cancerous cells). A proper treatment is necessary to fight with this serious disease.

  Discuss the different environmental companies

Discuss the different agencies, institutes, centers, different environmental companies that are active in UAE.

  Develop a simple urban constructed wetland design

Develop a simple urban constructed wetland design.

  Evaluate company performance in relation to GRI standards

Evaluate company performance in relation to GRI standards and comment on Stigler's theory.

  Water system design

Determine the corresponding error in the computed discharge

  Hydraulic behaviour in open channel

Describe how test flumes and associated equipment are used to assess and confirm hydraulic behaviour in open channel

  Write a paper on steel sustainability

Write a paper on steel sustainability.

  Writing case study about bridge collapse

Writing case study about bridge collapse

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd