Design of temporary support for an excavation

Assignment Help Civil Engineering
Reference no: EM131684089 , Length: 20

Geotechnical Course Project

Task: Design of temporary support for an excavation for a cut-and-cover tunnel for a major highway project.

Dimension of excavation: Depth 1.5m, Width 30m

Geotechnical information: BH114 & BH115, Groundwater table at 1.5m depth

2387_figure.jpg

Design criteria:

1) Maximum wall deflection 50mm,

2) Maximum ground settlement 30mm,

3) Minimum FoS against piping 1.5,

4) Minimum FoS against basal heave 1.5,

5) Minimum FoS against blow-in 1.5, and

6) Minimum FoS for wall stability 2.0.

Design assumptions:

1) No drawdown of groundwater table outside excavation,

2) Groundwater table lowered to 1m below base of excavation, and

3) Surcharge load adjacent to excavation 20kPa.

Walling system:

1) Diaphragm wall,

2) Sheetpile wall, or

3) Contiguous bored pile wall.

Bracing system:

1) Internal struts,

2) Ground anchors, or

3) Any suitable systems.

Required design output: 1) Walling system (type, size & depth),

2) Bracing system (type, size and arrangement),

3) Construction sequence, and

4) Demonstration of design meeting design criteria.

Attachment:- Geotechnical engineering.zip

Reference no: EM131684089

Questions Cloud

What do historians mean by the columbian exchange : What three concepts are useful in understanding the so-called "Rise of the West"? Define each, and discuss the example of each given in the video.
Is this an issue you have noticed in your community : Is this an issue you have noticed in your community, too? If you joined your classmate in this advocacy project, what skills could you bring.
What is being done to protect the environment : What is being done and by who to protect the environment, repair the damage, stave off the effects of climate change or address
Consequences of too much sun exposure : List the four precautions you need to take to protect yourself from the nasty consequences of too much sun exposure.
Design of temporary support for an excavation : Design of temporary support for an excavation for a cut-and-cover tunnel for a major highway project - Groundwater table lowered to 1m below base of excavation
Provide an example of given two techniques or methods : Using the first e-Activity, provide an example of two of the following techniques or methods that you or someone that you know has endured or witnessed.
Common student misconception is that plants photosynthesize : A common student misconception is that plants photosynthesize only during the day and conduct cellular respiration only at night
How much heat is transferred through the walls on that day : How much heat is transferred through the walls on that day, The room is 20 feet long and 20 feet wide with walls that are 10 ft high
Universal energy currency of cells : Name the molecules that serves as the universal energy currency of cells. Describe or depicted the cycle of this molecules and which steps in this cycle release

Reviews

len1684089

10/17/2017 8:40:30 AM

I am doing master in civil engineering and i need a report of minimum 20 pages. This report is related to geotechnical engineering subject. All other information regarding to report is given below Design of temporary support for an excavation for a cut-and-cover tunnel for a major highway project.

Write a Review

Civil Engineering Questions & Answers

  Engineering ethics and ethical issue

what is the engineering ethics course where to write about any engineering ethical case and discuss the ethical issue?

  Engineering ethics and concept and cases

what is the engineering ethics case related to civil engineering with reference and discuss all the engineering ethics issues which covered the "Engineering etics concepte and cases?

  Transportation and management

In the construction management, there is a lot of procurement route that are necessary and suitable for the construction industry.

  Supporting Investment Promotion: ERNST & YOUNG

Ernst & young is currently providing support to various sectors. In this regards it was felt that if this report is able to document good practices currently being adopted or planned in ceramic sector.

  Personalized Cancer Therapy-A step forward

Cancer is the uncontrolled growth of abnormal cells in the body resulting in tumours that can be benign or malignant (cancerous cells). A proper treatment is necessary to fight with this serious disease.

  Discuss the different environmental companies

Discuss the different agencies, institutes, centers, different environmental companies that are active in UAE.

  Develop a simple urban constructed wetland design

Develop a simple urban constructed wetland design.

  Evaluate company performance in relation to GRI standards

Evaluate company performance in relation to GRI standards and comment on Stigler's theory.

  Water system design

Determine the corresponding error in the computed discharge

  Hydraulic behaviour in open channel

Describe how test flumes and associated equipment are used to assess and confirm hydraulic behaviour in open channel

  Write a paper on steel sustainability

Write a paper on steel sustainability.

  Writing case study about bridge collapse

Writing case study about bridge collapse

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd