Design of a new private school building

Assignment Help Civil Engineering
Reference no: EM13697477

Instructions:

1. Provide an organized report.

2. Use tables and figures/drawings to present your design results.

Additional information:
- Perform structural design for a school building in Chicago.
- This design project is provided by Arup.
- Architectural Drawings are available on Blackboard.
- 3 people per group.

Project Description:

The project scope includes the design of a new private school building in Chicago.

The building area is approximately 77,000 square feet with potential for a future expansion of 40,000 square feet (addition of two levels above the cafeteria/administrative block on the east end of the building).

The program includes exterior spaces, pre-kindergarten through 12th grade classrooms, labs, library, cafeteria, gymnasium, administration offices, and support spaces.

The scope of work excludes the soccer field and tennis court.

Design of the future expansion is also excluded from the current scope, however provisions have been made in the structural and services design for the future expansion.

Verified Expert

Reference no: EM13697477

Questions Cloud

Impact of hr practices on the performance of business units : The impact of HR practices on the performance of business units - Write two paragraphs- summarizing the article
Calculate the number of moles of base in the antacid : A 0.204-g sample of a CO3^2- antacid is dissolved with 25.0 mL of 0.0981 M HCl. The hydrochloric acid that is not neutralized by the antacid is titrated to a bromophenol blue endpoint with 5.83 mL of 0.104 M NaOH.
The equivalence point and 5 ml past the equivalence point. : A solution containing 100.0 mL of 0.135 M CH3COOH (ka=1.8E-5) is being titrated with 0.54 M NaOH. calculate the ph:  at the equivalence point and 5 mL past the equivalence point.
Consider the hydrogen atom line spectrum for transitions : Consider the hydrogen atom line spectrum for transitions in the infrared region of the  electromagnetic spectrum. The line corresponding to wavelength 1.28μm corresponds to the  electron transition from n=5 to what level?
Design of a new private school building : The project scope includes the design of a new private school building in Chicago -  Design of the future expansion is also excluded from the current scope, however provisions have been made in the structural and services design for the future exp..
What amount would give him satisfaction equal to lottery : What is the asymptotic distribution of the minimal melting temperature of alloy A and what is the asymptotic distribution of the maximal melting temperature of alloy A?
How much interest revenue will salsa recognize : Give the entry required to record the lease on Salsa's books.2. How much interest revenue will Salsa recognize in 2006?
Compute the amount of postretirement expense : Compute the amount of postretirement expense for 2015. (Show computations)B) Prepare the journal entry to record postretirement expense and Stone's contributions for 2015.
Investment in debt securities at premium : Investment in debt securities at premium. On April 1, 2014, West Company purchased $400,000 of 6% bonds for $415,750 plus accrued interest as an available-for-sale security. Interest is paid on July 1 and January 1 and the bonds mature on July 1..

Reviews

Write a Review

Civil Engineering Questions & Answers

  What is the value of the kinetic coefficient of friction

A 2kg moves down a 45 degree incline at a constant velocity of .1m/s. What is the value of the kinetic coefficient of friction between the object and the incline?

  Determine the shear stress 3 inches above the neutral axis

a.) Determine the maximum shear stress in a rectangular beam 6 in. wide and 8 in. deep produced by a shear force of 38,400 lb. b.) For the same section and shear force conditions of part (a) above.

  What is the minimum chain length for the application

A motorcycle sprocket on the rear wheel has a diameter of 24 cm, and trhe driver sprocket has a diameter of 4.0 cm. The driver sprocket shaft and rear axle are 60 cm apart. What is the minimum chain length for the application.

  Determine the maximum stress and strain in the ball

A rubber ball is inflated to a pressure of 65kpa. At that pressure, the diameter of the ball is 240 mm and the wall thickness is 1.25 mm.The rubber has a modulus of elasticity E of 3.6 MPa and a poisson's ratio of 0.48.

  What are the problems associated with bridge widening method

In bridge widening projects, the method of stitching is normally employed for connecting existing deck to the new deck. What are the problems associated with this method in terms of shrinkage of concrete

  Determine the variation of jet are with elevation

A stream of liquid moving as low speed leaves a nozzle pointed directly downward. The velocity may be considered uniform across the nozzle exit and the effects of friction may be ignored.

  Determine the capitalized cost of the project to construct

This project is expected to have a first cost of $2,000,000 and an annual maintenance cost of $50,000. In addition, major repairs costing $250,000 will be required after 25 years and each 15 years thereafter.

  Derive an equation for concentration of a chemical in a lake

Account for chemical reactions, groundwater flows, streams, precipitation, evapotranspiration. Indicate any assumptions that can be made to simplify your equation.

  Determine tension in rope ab required for static equilibrium

The frame is designed to carry the hanging mass at G equal to 167 kg. The frame is supported by a pin connection at C and the rope AB, and constructed with pin connections at points E, F, and D. Importantly, members BEFG and EDC are continuous mem..

  Runoff rate into the inlet grate

If the detention storage on the paved section is increasing at the rate of 60 m3/hr, what is the runoff rate into the inlet grate?

  Calculate the unit weight and dry unit weight of the soil

A cube of moist soil weighs 330 lb and has a volume of 3.00 ft3. Its moisture content is 27.0% and the specific gravity of solids is 2.72. Compute the void ratio, porosity, degree of saturation, unit weight and dry unit weight of this soil.

  Calculate and plot the distribution of total and stresses

A borehole at a site reveals a soil profile comprising 6 m deep fine sand layer overlying a 9 m thick clay layer, which in turn overlies weathered bedrock. The groundwater table is located at a depth of 4 m from the ground surface.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd