Design horizontal alignment tangents and circular curve

Assignment Help Civil Engineering
Reference no: EM13718255

It develops students' ability to design road geometric elements including roadside drainage.

Details/Questions

On the contour plan shown in attached map, a two-lane two-way road is to be designed for a target speed of 80km/hr to 100km/hr speed joining Point A (CH0+000) and Point B. The design covers route location, horizontal and vertical alignments, cross-sectional elements, earthworks and road drainage design to achieve the most safety and economical outcome.

The following are the requirements:

• At Point A, the reduced level of the road is to be RL65.000.

• At Point B, the reduced level of the road is to be RL75.000.

• There will be only one horizontal curve and only one vertical curve.

• The truck traffic is negligible. Hence consider only cars for design.

• Radius of horizontal curve [R= LN(full student ID)x 14] is upward rounded to 10m. Use average student ID if two students are working together. LN is natural log function.

• Length of vertical curve [L= LN(full student ID)x7] is rounded to nearest 5m. Use average student ID if two students are working together. LN is natural log function.

• Side slope of cut is 1:1, fill is 1:2. Shrinkage factor = 10%.

• Maximum height of fill is 2.5m and maximum depth of cut is 3.5m.

• Uniform ground slope at a particular chainage can be assumed. It can be obtained from contour map by joining two points at two sides of the road centreline, each at 20m distance perpendicular to the road centreline (approximation will be sufficient).

• Lane width= 3.6m, sealed shoulder width= 1.2m.

• Normal crossfall is -3% for lanes and -5% of sealed shoulder.

• Rainfall intensity is 80mm/hr (1 year ARI) and 120mm/hr (10 year ARI)

Within the constraints described above, design should include the following design elements (note: you cannot finalise these elements in sequence and iterative process is required):

1. Sketch two alternative alignments connecting Point A with Point B. Choose one alignment for your design. Justify.

2. Locate your alignment considering both vertical and horizontal controls. Coordinate both horizontal and vertical alignments. Provide alignment sketch with all design data (e.g., CHs/deflection angle in horizontal alignment, CHs/RLs/grades of vertical alignment.)

3. Design horizontal alignment (tangents and circular curve- also transition curves if required). Develop a horizontal alignment design table.

4. Design vertical alignment (grades and parabola) in detail. Develop vertical alignment design table.

5. Draw an appropriate longitudinal section (profile view) showing both vertical and horizontal curves, depth of cut/fill etc. at 100m interval (in scale).

6. Design superelevation for your road.

7. Determine and tabulate the cross section levels (left end of the shoulder, left end of lane,

8. Design side drain for your road for the runoff accumulated from road surfaces only.

9. Draw cross-sections at 100m interval (depths of side drain and pavement can be neglected). Manually show your area calculations for three typical cross-sections (fully cut, fully fill and partially cut/fill) and indicate all cross-sectional areas in the drawings (note: you do not have to draw in scale but you need to show all dimensions).

10. Calculate earthwork quantities using 100m cross-sections over the length of the road. Draw mass-haul diagram (in scale) and discuss the properties of your mass-haul diagram.

11. Check stopping sight distance on horizontal and vertical curves as required.

12. Check road-ponding/aquaplaning safety as required

Reference no: EM13718255

Questions Cloud

What is the initial speed of the second cart : A cart of mass m moving right at speed v with respect to the track collides with a cart of mass 0.7m moving left. What is the initial speed of the second cart
What is the total momentum of the two balls : A 3-kg ball traveling to the right with a speed of 4 m/s collides with a 4-kg ball traveling to the left with a speed of 3 m/s. What is the total momentum of the two balls before and after the collision
Specific enthalpies at entrance and exit of all components : A jet plane cruises at a speed of 980 km/hr. air enters the turbojet engines at 0.73 bar, 230 k. the pressure ratio across the compressor is 10 and the turbine inlet temperature is 1650 k.
Find the average force that her hands exert on the ball : Your friend is catching a falling basketball after it has passed through the basket. Her hands move straight down while catching the ball. Determine the average force that her hands exert on the ball while catching it
Design horizontal alignment tangents and circular curve : Design horizontal alignment tangents and circular curve- also transition curves if required. Develop a horizontal alignment design table - Design vertical alignment (grades and parabola) in detail. Develop vertical alignment design table.
Determine through how many revolutions has it turned : A computer hard disk 8.0 cm in diameter is initially at rest. a small dot is painted on the edge of the disk. The disk accelerates at 620 rad/s2 for 1/2s, Through how many revolutions has it turned
Determine the initial temperature of the mixture : A piston-cylinder device contains 1.0 kg of liquid water and 0.01 kg of water vapor (steam) in equilibrium at 7 bars. The pressure is held constant and heat is added until the temperature reaches 280 C.
What is the total work done on the crate : A factory worker pushes a 30.6kg crate a distance of 4.8m along a level floor at constant velocity by pushing downward at an angle of 31 degrees below the horizontal. What is the total work done on the crate
Collar that slides along a smooth horizontal bar : A collar (A) that slides along a smooth horizontal bar. The mass of the collar is 14 kg, and the mass of block (B) is 18 kg. The spring constant for the spring connecting the collar to the frame is 700 N/m.

Reviews

Write a Review

Civil Engineering Questions & Answers

  Development of the lateral surfaces of the pyramid

Axis of the hole is perpendicular to VP. Draw elevation, plan and development of the lateral surfaces of the pyramid.

  Determine what is one important facet of the system

With all the developments and improvements to the GNSS system over the years, what is one important facet of the system that has not improved

  The average return period of the median value

The probability that, for a 2-year period, the peak flow rate will equal or exceed the median value in the second year, but not in the first year?

  Determine the allowable value of the tensile load p

A steel bar serving as a vertical hanger to support heavy machinery in a factory is attached to a support by the bolted connection. The main part of the hanger has a rectangular cross section with width b1 = 1.5 in. and thickness t = 0.5 in.

  The load is supported equally on each side of the tractor by

The tractor boom supports a uniform mass of 500 kg in the bucket which has a center of mass at G. Determine the force in each hydraulic cylinder AB and CD and the resultant force at pins E and F. The load is supported equally on each side of the trac..

  Determine the overall specific weight of each of the samples

Two soil samples, each having a void ratio of 0.76 and density of 2.65 grains have degrees of saturation, respectively, 85% and 100%. Determine the overall specific weight of each of the samples.

  Design the pins so that the ledge can support doug

Design the pins so that the ledge can support Doug and Jeremy and eight others on each side of the building. Assume each person weighs 200 lbs.Pin properties: Ultimate shear strength = 100 lb/in^2

  Which would require less wood and by what percentage

An engineer is to design a channel lined with planed wood to carry 2 m3/s of water on a given slope. The channel cross section can be either a 90 degree triangle or a square. Which would require less wood and by what percentage

  Determine the discharge of a trapezoidal concrete channel

Determine the discharge of a trapezoidal concrete channel section with a bottom width of 4 ft and side slopes of 2:1. The depth of flow is 5 ft and the channel slope is 0.5%

  Find the force p needed to start the block a to the right

Given that us=0.24 for all surfaces, find the force P needed to start the block A to the right.

  What will be the grease concentration

A home washing machine removes grease and dirt from clothes in a first-order process in which 12% of the grease on the clothes is removed per minute. The washing machine holds 50.0L of water and has a wash cycle of 5.00 minutes before discharging the..

  Determine largest value of ft for which solution is stable

A stream conveying a flood peak of 50 m3/s (velocity 1.25 m/s and depth 1 m) is divided into 1 km long reaches for solution of the unsteady equations. Determine the largest value of ft for which the solution will be stable.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd