Design cycle time is the cycle time at which you design

Assignment Help Mechanical Engineering
Reference no: EM131096896

Scope of Project
You must develop a manufacturing plan to machine the part to the final dimensions. The company is a small company of about 30 workers currently.

Product Design
You will design 1 tensile test bar using the following diagram

49_Untitled.png

Develop a part print WITH tolerancing for this part

Material Cost
The raw material will be a material you specify. It will come as 1 diameter bar stock at a length you specify

Labor Cost
The labor cost for your plant is $15 per hour for all employees, except maintenance personnel, which cost $22 per hour.

Volume
Your manufacturing facility must provide 200,000 of the tensile test specimens

The equipment will be a stand alone cell or line. No other parts will flow though this area at this time.

Operational Plan

The facility is scheduled to operate 250 days per year and run two 8 ½ hour shifts per day. The workers must be given 30 minutes for lunch and two 15-minute breaks. The product life cycle is expected to be 5 years or more.

Reports
Reports must be written using a word processor and spreadsheet when appropriate. All drawings must be completed using CAD.

1) Title Page

2) Table of Contents

3) Executive Summary

4) A written report detailing the manufacturing plan. The individual manufacturing deliverables must support all information presented in the manufacturing plan summary.
i) Part prints (components plus assembly)
ii) Initial investment required and projected cost per part
iii) Conclusions, Recommendations

5) Manufacturing Plan Deliverables including all supporting data

Manufacturing Plan Deliverables

TAKT Time Calculations - TAKT is a German word for pace. TAKT time is the rate at which your customer requires the product. TAKT time defines the manufacturing line speed and the cycle time for the manufacturing operations. TAKT time is computed as:
Available work time per day / Daily required demand (parts/day)

Design Cycle Time Calculations - Design cycle time is the cycle time at which you design your manufacturing operations after considering contractual breaks, setup time, planned maintenance, estimated downtime, reject rates, etc. All of the items above reduce your actual work time available per day and reduce the required cycle time. Each team must also consider the reject produced by the system and increase the required production to offset the loss. The team must report the manufacturing cells planned operational availability. Operational availability is the Planned operating time /Available work time.

Process Plan Block Diagram - After reviewing the product prints, develop a process plan block diagram that represents the product flow through the various machines and processes. Include equipment, material handling, material flow, quality checks, repair loops, etc..

Equipment Sequence of Operations and Balance Chart - Develop a detailed step-by-step sequence of operations for each process or piece of equipment. Calculate the time required for each cut or step in the process. This document is required to determine if the operation can produce parts at the required rate. Do not forget to include operator load and unload times. When the sequence-of-operation charts are complete, use a graph to compare the cycle time of each process against the design cycle time for the line. The line should be balanced without any process above or well below the design cycle time of the line.

Tooling - A list of all cutting tools with holders must be specified. Also include speeds and feeds. Be specific

Fixture - A fixture concept must be specified. This does not have to be drawn

Machining Equipment Specifications - Select the actual machines required to produce the parts including manufacture and model number. Make sure the machines can meet the required horsepower, federates, and spindle speeds to make the cuts. Investigate the standard work holding device, turret and spindle supplied with the machine and make sure the selected tooling will mate appropriately. Consider the following factors: tool change time, MCU manufacturer, machine work envelope, machine footprint, cost, HP, etc.... Also specify the required chip removal system. Include any sales information you deem helpful on why you made your choice.

Cost Estimate - Develop a detailed cost estimate of the initial investment required to purchase and install the manufacturing cell. Then determine the approximate unit cost of the product based on your manufacturing cell design. Include the following items in your calculations:

a) Direct Material Cost - Include the initial purchase price of each component ($/unit).

b) Direct Labor Cost - Calculate the total labor cost per shift divided by the number of parts produced per shift ($/unit).

c) Burden Rate - The manufacturing facility has a burden rate of 250%. The burden rate includes such items as employee benefits, taxes, insurance, etc... Multiple the direct labor cost per unit (item b) by the burden rate to determine the burden rate cost per piece ($/unit).

d) Depreciation Cost - Use straight-line depreciation to determine the impact of the initial investment. Assume the usable life of the equipment is 5 years with a salvage value of 15% at the end of the life span. Divide the initial cost minus the salvage value by five to determine the depreciation cost per year. Divide the annual depreciation cost by the annual volume to determine the cost per piece ($/unit)

e) Add all of the above items together to determine the estimated unit cost of the product.

Reference no: EM131096896

Questions Cloud

Prove a linear-time lower bound for the maxflow problem : Show that, for any values of V and E, any maxflow algorithm might have to examine every edge in some network with V vertices and E edges.
Discuss economic costs and benefits of utilizing wind energy : Discuss the economic costs and benefits of utilizing wind energy for electricity production. Following this analysis, discuss whether or not the costs and benefits justify the proliferation or abandonment of wind energy.
Transferable skills program for surrounding community : An employment agency is planning to create a transferable skills program for the surrounding community. The fixed monthly cost of the program will be $6,000 and it will cost $35 per person. This includes licensed professionals, computer and intern..
Create the greatest hardship for proponent of hydrogen power : Based on the article by Jeff Wise, which of the four hurdles do you believe creates the greatest hardship for proponents of hydrogen power? Furthermore, which hurdle do you think will be the easiest to overcome as the technology advances?
Design cycle time is the cycle time at which you design : Develop a detailed step-by-step sequence of operations for each process or piece of equipment. Calculate the time required for each cut or step in the process. This document is required to determine if the operation can produce parts at the requ..
How could culture interact to encourage a persons ability : How could culture interact to encourage or discourage a person's ability or desire to implement the simple intervention described by Dr. Mike Evans?
What differences might you expect in compilers designed : Compilers are used in many different circumstances. What differences might you expect in compilers designed for the following applications?
Writing depends on the quality of the source material : The quality of the argument you make in writing depends on the quality of the source material you choose to include in your writing. Therefore, an annotated bibliography begins the preliminary research process.
Differences between the original re and the re that produced : Explain any differences between the original re and the re that you produced. How does the DFA that you built compare with the DFA built in the chapter from following RE.

Reviews

Write a Review

Mechanical Engineering Questions & Answers

  Package design

Package Design Brief: Assume you are the packaging engineer for a large consumer products company. In this company, the Packaging Design Briefs are initiated by the marketing group and forwarded to the Package Engineering group.

  Mechanical engineering questions

Define dynamic viscosity, Determine the centroid, Pressure due to the height of liquid, Advantage of changing the liquid, Calculate the total moment about the hinge of the seal gate.

  Automatic control

DOF system and Find the differential equation describing the system

  Write a paper on boyle''s law

Write a paper on Boyle's law and describe Compression and Combustion stroke . Also explain Charles's law and illustrate SI engine and CI engine.

  Verify the law for parallelogram of forces

To Verify the law for parallelogram of forces, law for triangle of forces and law of polygon of forces. These laws are very useful to calculate unknown forces in very short time.

  Discharge pressure of the compressor

What is the discharge revised discharge pressure of the compressor.

  The Case for Global Accounting Standards

The role of IFRS in both developing and developed capital markets.

  Wind turbine

Wind turbines are becoming more and more common as a method of energy production, wind turbines by their very nature are dynamic and are subject to and create their own internal and external kinematics and kinetics.

  Advanced design methodologies

8 x product engineering and design review (week 2 – 12), ~3 pages per item which must contain a brief description of the product then delve into concepts such as materials selection, manufacturing methods, life cycle analysis, recyclability and overa..

  Design of absorption column and the cooler

Design of absorption column and the cooler. Process design of other units should be completed along with pipe sizes.

  Determine the maximum total bending moment

Determine maximum total bending moment (static plus dynamic) of the beam under steady-state conditions.

  Force of the water on the gate

Determine the magnitude of the horizontal and vertical components of the force of the water on the gate.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd