Design and build a small building in a local industrial park

Assignment Help Civil Engineering
Reference no: EM133187028

N5E06 Construction Information (Drawing, Detailing, Specification) - Higher Nationals Diploma

Learning Outcome 1: Evaluate different types of construction information in the context of diverse project types.

Learning Outcome 2: Develop construction drawings, details, schedules and specifications in support of a given construction project.

Learning Outcome 3: Interpret different types of construction information in order to explain a construction project.

Learning Outcome 4: Assess ways in which construction professionals collaborate in the production of construction information.

Scenario: You have recently been employed as a civil engineering technician. Your employer, a medium-sized general contractor, has been commissioned to design and build a small building in a local industrial park. The design team within the company has prepared a set of outline design drawings, which provide general information about the proposed building, site and form.

You are tasked with the responsibility of preparing the construction information package that will allow the construction team to build the project. The package of information required includes the following:
• Site Location Plan
• Site plan
• Floor plan
• Elevations
• Section/Details
• Door and window schedules
• Outline bill of quantities
• Schedule of works

Accompanying the construction information package, your employer wishes to understand your reasons for the drawings, specification and schedules that you have produced.

The submission is comprised of two parts:
1. Construction Infrmation; to include:
a) Site Location Plan (1:1250)
b) Site plan (1:500 or 1:1000)
c) Floor plan (1:50 or 1:100)
d) Elevations (1:50 or 1:100)
e) Section (1:20)
f) Detail(s) (1:5)
g) Door and window schedules
h) Outline bill of quantities
i) Schedule of works

All drawings are to be on a minimum sheet size of A3. They should include a title block, showing project information and be numbered using an industry standard.

Drawings should be produced using an industry standard CAD software package. BIM software may be used but is not required.

2.A written report - this should be a justification of your decisions for producing specific information for the project and compare the choices you have made with other potential information types.

Part 2: Scenario
One of your colleagues, in a medium-sized general contracting firm, has produced a set of construction information documents for a small industrial building. Before issuing this information to the construction team, your employer has asked that you review the information to ensure that it is fit-for-purpose. In particular, your employer asks you to:

• coordinate the drawings with the schedules, specifications and bill of quantities
• identify any information clashes
• highlight areas where there may be missing, or incorrect information provided.

You are then tasked with making corrections to the construction information, ensuring that copies of the originals and your recommended changes are recorded.

Finally, you are asked to prepare a short report on the construction information package that you have reviewed. You will discuss your findings with the original author of this work, as part of both of your continuing professional development.

The submission is comprised of two parts:

1. Construction Information Review; to include:
a. ‘Redlined' construction drawings (highlighting errors or inaccuracies)
b. ‘Marked-up' specifications and schedules (highlighting errors or inaccuracies)
c. Corrected versions of all documentation, with suitable revisions recorded.

2. Feedback Report - Produce a report explaining the design team roles (such as Architect, Landscape Architect, Quantity Surveyor, Civil Engineer, Building Services Engineer etc), how they work with each other and assessing the types of information produced by each. The report should also highlight and compare the impact of CAD and BIM in the collaborative process of producing construction information.

Attachment:- Construction Information Drawing Detailing Specification.rar

 

Reference no: EM133187028

Questions Cloud

Calculate the real worth of the investment in today dollars : The relevant nominal discount rate is 7.5% and the inflation rate is 4.2%. Calculate the real worth of the investment in today's dollars
Calculate the labor rate and the labor efficiency variance : Calculate the labor rate variance and the labor efficiency variance. Indicate whether the variances are favorable or unfavorable
How much gain or loss would be recorded : If the company sells the equipment for $42,000 on December 31, 2023, how much gain or loss would be recorded in the company's financial statements
Prepare the journal entries related to this bond : Assume that Hitt Company follows IFRS and accounts for the bonds under FV-NI model. Prepare the journal entries related to this bond for 20X1
Design and build a small building in a local industrial park : Design and build a small building in a local industrial park. The design team within the company has prepared a set of outline design drawings
Indicate the effects on assets and liabilities : For each transaction described above, indicate the effects on assets, liabilities, and stockholders' equity using the format below
Collaborate in the production of construction information : Develop construction drawings, details, schedules and specifications in support of a given construction project and Interpret different types of construction
What is the amount allocated to the work-in-process : Work-in-process records revealed that 13,500 card units were started in January, 6,750 card units were complete, What is amount allocated to the work-in-process
How much in total dollars is company behind in its payment : Enterprise Storage Company has 400,000 shares of cumulative preferred stock outstanding, How much in total dollars is company behind in its payment

Reviews

Write a Review

Civil Engineering Questions & Answers

  Compare and contrast the anticipated effects of grain size

load ratio on the fatigue life predicted on the basis of the following three approaches to fatigue:

  What must be the daily mass of chlorine added to reactor

A minimum contact time of 30 mins is required to reduce the pathogen concentration from 100 pathogens/L to below 1 pathogen/L through a first order decay process. You plan on treating water at a rate of 1,000 gal/min.

  Find the work and heat transfer in all components

A steam power plant has a high pressure of 3 MPa, and it maintains 60?C in the condenser. A condensing turbine is used, but the quality should not be lower than 90% at any state in the turbine. For a turbine power output of 8 MW, find the work and..

  Determine the retention system characteristics

Design an embedded wall to support a 6m deep excavation - Determine the retention system characteristics, i.e. construction material, dimensions of the wall

  What is the required detention time and tank

A chlorination process is to be used to disinfect a wastewater treatment plant effluent. The plant treats 1.8MGD (million gallon per day). The water entering this unit has about 4500mg/L of coliforms, and the effluent target is 0.1 mg/L of coliforms.

  What is the equilibrium constant for the reaction at 298 k

If PSO2 = PH2S and the vapor pressure of water is 25 torr, calculate the equilibrium SO2 pressure in the system at 298 K.

  Determine rate of ammonia utilization nd biomass growth rate

Determine the rate of ammonia (NH4-N) utilization and the biomass growth rate for the following conditions: µm = 0.50 g VSS/g VSS-d Ks = 0.50 mg/L X = 10 mg/L S = 40 mg NH4-N/L

  Design moment-nominal and ultimate moment

What is difference between design moment, nominal, required, resisting and ultimate moment?

  Calculate the velocity as plunger strikes a

THe upper end of the spring is welded to the lunger and the lower end is welded to the base plate. If the plunger is lifted 1.5" above equilibrium and released from rest, calculate its velocity as it strikes A.

  Find the required depth y as a function of the length x

For the cantilever beam shown the depth is h at the support. Find the required depth y as a function of the length x in order for all sections to be equally effective in their resistance to bending

  What is a low-e coating, and what are its beneþ ts

What is a low-e coating, and what are its beneÞ ts?

  Overview of the types of earthmoving equipment

Provide an overview of the types of earthmoving equipment that you can use on the London college construction site. What measure will you employ to ensure that the equipment is used efficiently, effectively and economically?

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd