Q.1 Screw Conveyer

For a specific job, it is required to transport a limestone (Dust) from slotted hopper to feed a higher-level application. As the feed is controlled at the level of 25+P metric t/hr, a screw feeder without extension for placement under the slotted hopper is suggested for the job.

Put in consideration that even flow rate required along the whole inlet opening. The length of the feeder is 10+ (Q/3) m, inclined at (30 + P)° to discharge at the application. A motor with 1000 + QPQ rpm nominal speed, v-belt drive, connected to a double reduction shaft mounted speed reducer to run the screw feeder.

Design and select the proper screw feeder for the job.

Bucket Elevator
You are required to design a vertical spaced bucket elevator to elevate a dry sand with density of 1600 kg/m3 at ambient temperature. You must recommend an adequate bucket style and determine the power required for operation.
Design Considerations:
• Required tonnage = 180 + (PQ/2) t/h
• Elevator centre/centre height = 27 + P m
• Maximum head pulley diameter 1250 mm (due to space limitations)
• Angle of wrap of head pulley = 180º

 

Reference no: EM132887306

Questions Cloud

Compute the tax base of each of the assets and liabilities : A loan payable is shown at $60,000. Compute the tax base of each of the assets and liabilities and identify any deferred tax asset or liability for each item.
Design a new compensation system for a healthcare services : As the human resources director on an internal team that includes the owner and a benefits analyst, you must design a new compensation system for a healthcare s
What should be reported as total intangible assets : In the preparation of Flint's balance sheet as of December 31, 2019, what should be reported as total intangible assets
Data collection for different kinds of research : What are the main sources of data collection for different kinds of research? Explain
Design a vertical spaced bucket elevator : Design a vertical spaced bucket elevator to elevate a dry sand with density of 1600 kg/m3 at ambient temperature. You must recommend an adequate bucket style
Prepare journal entries in the books of vtc ltd for the year : Prepare journal entries in the books of VTC Ltd for the years ended 30 June 2020 and 2021. Prove that the interest rate implicit in the above lease is 8%.
Violence against women act : Analyze how effective you believe that the Violence Against Women Act and criminal justice based protective actions
Discuss and evaluate the methods of learning : Discuss and evaluate the methods of learning, training and development in the workplace.
Discuss the external stakeholders : Discuss internal stakeholders and the role they play in business

Reviews

Write a Review

Civil Engineering Questions & Answers

  What are their fundamental differences

Name the two basic projections used in state plane coordinate systems. What are their fundamental differences? Which one is preferred for states whose long dimensions are north-south? East-west?

  Find the conductive heat loss through the furnace wall

Assuming unit surface area, find the conductive heat loss through the furnace wall and the temperature at the interface of the fire clay and red brick.

  What is the magnitude of the average force exerted

A carpenter uses a hammer to strike a nail. Approximate the hammer's weight of 1.8lbs, as being concentrated at the head, and assume that at impact the head is traveling in the -j direction.

  Determine the factor of safety of the footing

Assume the soil above the groundwater level to be saturated and v' = 0.35. Determine the factor of safety of the footing (use the footing size designed according to CSM) using the conventional method.

  What will happen to any water that leaks through cladding

Make sketches of how the materials are detailed, especially how they are anchored to the building. What will happen to any water that leaks through the cladding?

  Will the quantity of coarse aggregate incease or decrease

A concrete mix with a 3in slump, w/c ratio of .5, and sand with a fineness modulus of 2.4 contains 1700lb/yd3 of coarse aggregate. Compute the required weight of coarse aggregate per cubic yard.

  Compute detention time and horizontal flow through velocity

Compute the detention time and horizontal flow through velocity. Do these values satisfy the standards for water works, which stipulate detention time is greater and equal to 30 min and 0.5 ft/min =

  Construction of the embankment

Pore water pressure is to be observed during the construction of the embankment. Calculate the pore water pressure which must not be exceeded at any point in the clay layer 9 m below the surface of the embankment to ensure a shear strength of 100 ..

  Determine what manometer reading can be expected

Is this flow laminar. What is the viscosity of the oil. For the same flow in the opposite directio, what manometer reading can be expected.

  Determine the average impact force which is exerted on body

the coefficient of the restitution for the collision is e = 0.3, and friction is negligible. if the time duration of the collision is 0.025 s, determine the average impact force which is exerted on the 3 kg body.

  Can it be concluded that fewer than half of the incinerators

Incinerators can be a source of hazardous emissions into the atmosphere. Stack gas samples were collected from a sample of 50 incinerators in Chicago. Of the 50 samples

  Determine the resultant moment produced by the load and the

The tower crane is used to hoist the 2-Mg load upward at constant velocity. The 1.5-Mg jib BD , 0.5-Mg jib BC , and 6-Mg counterweight C have centers of mass at G1 , G2 , and G3 , respectively.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd