Design a spherical tank with a wall thickness

Assignment Help Civil Engineering
Reference no: EM131216412

Design a spherical tank, with a wall thickness of 2 cm that will ensure that no more than 50 kg of hydrogen will be lost per year. The tank, which will operate at 500°C, can be made of nickel, aluminum, copper, or iron. The diffusion coefficient of hydrogen and the cost per pound for each available material is listed below.

Diffusion Data



Material

D0 (cm2/s)

Q (cal/mol)

Cost ($ lb)

Nickel

0.0055

8,900

4.10

Aluminum

0.16

10,340

0.60

Copper

0.011

9,380

1.10

Iron (BCC)

0.0012

3,600

0.15

Reference no: EM131216412

Questions Cloud

Find the autocorrelation function : Let a random process consist of a sequence of pulses:- Find the mean function.- Find the autocorrelation function.
Determine the magnitude and direction of the force p : determine the magnitude and direction of the force P that must be exerted on the free end of the rope to maintain equilibrium. (Hint: The tension in the rope is the same on each side of a simple pulley. This can be proved by the methods of Chap. 4..
What action principles you already apply to your life : Describe your personal level of commitment to living more sustainably, and what action principles you already apply to your life. Include how you and fellow Americans could better apply the three scientific principles of sustainability and any so..
Is the process wss : A random process is defined- Find the PDF of - If is an exponential random variable- Is the process WSS?
Design a spherical tank with a wall thickness : Design a spherical tank, with a wall thickness of 2 cm that will ensure that no more than 50 kg of hydrogen will be lost per year. The tank, which will operate at 500°C, can be made of nickel, aluminum, copper, or iron. The diffusion coefficient o..
Evaluate the current leadership strategy : Based on your research into a company that you have chosen to analyse (apple is the company), outline, investigate and evaluate the current leadership strategy that the company is using to achieve its key strategic goals.
Expalin why patient blood clots continue to be misdiagnosed : Even if the patient identifies a problem and seeks medical care, blood clots are frequently misdiagnosed resulting in serious medical complications and sometimes death. Why does this happen? How can you, as the advanced practice nurse, protect you..
Prepare the adjusting entries for the above transactions : KNCB Bhd. prepared the following unadjusted trial balance on 31 December 2015 for its first year of operation: Prepare the adjusting entries for the above transactions at 31 December 2015
Is the process ergodic in the mean : Consider a discrete-time wide sense stationary random processes whose autocorrelation function is of the form- Is the process ergodic in the mean?

Reviews

Write a Review

Civil Engineering Questions & Answers

  Engineering ethics and ethical issue

what is the engineering ethics course where to write about any engineering ethical case and discuss the ethical issue?

  Engineering ethics and concept and cases

what is the engineering ethics case related to civil engineering with reference and discuss all the engineering ethics issues which covered the "Engineering etics concepte and cases?

  Transportation and management

In the construction management, there is a lot of procurement route that are necessary and suitable for the construction industry.

  Supporting Investment Promotion: ERNST & YOUNG

Ernst & young is currently providing support to various sectors. In this regards it was felt that if this report is able to document good practices currently being adopted or planned in ceramic sector.

  Personalized Cancer Therapy-A step forward

Cancer is the uncontrolled growth of abnormal cells in the body resulting in tumours that can be benign or malignant (cancerous cells). A proper treatment is necessary to fight with this serious disease.

  Discuss the different environmental companies

Discuss the different agencies, institutes, centers, different environmental companies that are active in UAE.

  Develop a simple urban constructed wetland design

Develop a simple urban constructed wetland design.

  Evaluate company performance in relation to GRI standards

Evaluate company performance in relation to GRI standards and comment on Stigler's theory.

  Water system design

Determine the corresponding error in the computed discharge

  Hydraulic behaviour in open channel

Describe how test flumes and associated equipment are used to assess and confirm hydraulic behaviour in open channel

  Write a paper on steel sustainability

Write a paper on steel sustainability.

  Writing case study about bridge collapse

Writing case study about bridge collapse

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd