Mine Power Supply and Drainage

Mine Drainage Design Task

Answer all questions

If required it may be assumed that g = 9.81 m/s2, Density of water = 1000 kg/m3,

You are a mine planning engineer at a medium sized operation producing 1.5 mtpa of coper ore at 3% Cu. The mine was originally designed as an open cut using a bench height of 15m. Footwall benches were 15 m wide to give a slope angle of 45°, but on the hanging wall side alternate benches are only 10m wide to produce an angle of about 50°.

Underground mining was commenced using a footwall decline from the 15m bench to access 2 lifts of open stoping down to the -210m level. The first lift of stopes are completely mined out, an extraction of the second lift is 50% complete. A 6m diameter shaft has been sunk to a depth of 700m from a collar at +55m for the long term. Mining below the -210m level is to be by sub-level caving. A transport level is to be developed at the -510 level to transport all ore from levels above via ore passes to a crushing station at the -610m level and then to a loading station at the - 630m level.

You are required to design a drainage and pumping system to deal with the mine water for the next 10-15 years based on the data in the following sections. As the mine grade is low and power costs are high every effort should be made to minimise the operating costs of the pumping system. Describe your proposed drainage and pumping system with the aid of diagrams where required and explain the general philosophy behind the system. Detail and assumptions made and make comments and conclusions as required.

Data

Development gradients

Decline to -210m 1 in 9 , curves 1 in 15

Decline below -210m 1 in 7 , curves 1 in 12

Drill levels 1 and 3 1 in 50 down

Extraction levels 2 and 4 1 in 50 up

Future sub levels 1 in 50 up

Main haulage level -590 m 1 in 200 up

Mine water

Ground water: currently averages 2,000,000 litres/day and is expected to increase at a rate of 10% per year as the mine deepens. Flows are higher in winter up to double the average for 3-4 months. The main source is the fissured footwall rock.

Mine water: averages 700,000 l/day with large variations in use on an hour by hour basis. When sub level caving commences the usage is likely to double but usage is also expected to be more uniform.

Surface runoff: Currently this is contained in the open cut and is pumped from a sump in the pit bottom. Once crown pillars are blasted and caving is initiated this surface water will find its way into the cave and eventually into the mine. Any future estimates need to be based on expanding the catchment area and on the following rainfall data.

Rainfall: the average annual rainfall s 740 mm, the average monthly figures are as follows

January 10mm

February 10mm

March 40mm

April 60mm

May 80mm

June 100mm

July 110mm

August 120mm

September 90mm

October 60mm

November 40mm

December 20mm

Based on measurements in the locality the maximum rainfall intensity recorded over the last 50 years is as indicated below and needs to be accounted for:

Storm duration (hours) Intensity (mm/hr)

2 40

4 25

8 15

12 12

16 10

20 9

24 8

36 6

48 5

Water Quality: Run of mine water is expected to be slightly acidic due to the formation of sulphuric acid from sulphides within the rock. Likely pH is in the range 3.5-4.5.

Cave angles: Expected cave angles are 60° in both footwall and hanging wall and 75°at ends of the ore body

Rock properties: SG of 2.5 for all rocks. Hanging wall and ore have moderate strength, footwall is very strong.

Mine Section

Mine Plan Shaft Section.

Reference no: EM13839913

Questions Cloud

What conditions and practices promote childcare program : What conditions and practices promote childcare program
Rectangle data class and an executable program to test : For this assignment you are to create a Rectangle data class and an executable program to test
Evaluation of jobs and job structure : Evaluation of Jobs and Job Structure
What is the ascii collating sequence : Which standard C++ library function allows you to paste one string onto the end of another. What must you be careful of when using this function
Design a drainage and pumping system to deal with mine water : You are required to design a drainage and pumping system to deal with the mine water for the next 10-15 years based on the data in the following sections.
Discussion on the right to carry guns on college campuses : Discussion on the Right to Carry Guns on College Campuses
Display all product columns for products : Display all product columns for products that are red and black and have a list price greater than or equal to $400 and less than or equal to $800. Use the keywords BETWEEN and IN.
What is an annotated bibliography : What is an annotated bibliography? A description/summary of the central theme of the work. A mention of the intended audience, Comments about the work's quality and scope,and the relevance of the work as it pertains to your topic
Conduct a swot analysis on the case study company : Conduct a SWOT Analysis on the case study company's current lack of strategic control. Create a case study analysis focusing on the company's challenge relative to strategic control through a balanced scorecard and implementation

Reviews

Write a Review

Civil Engineering Questions & Answers

  Engineering ethics and ethical issue

what is the engineering ethics course where to write about any engineering ethical case and discuss the ethical issue?

  Engineering ethics and concept and cases

what is the engineering ethics case related to civil engineering with reference and discuss all the engineering ethics issues which covered the "Engineering etics concepte and cases?

  Transportation and management

In the construction management, there is a lot of procurement route that are necessary and suitable for the construction industry.

  Supporting Investment Promotion: ERNST & YOUNG

Ernst & young is currently providing support to various sectors. In this regards it was felt that if this report is able to document good practices currently being adopted or planned in ceramic sector.

  Personalized Cancer Therapy-A step forward

Cancer is the uncontrolled growth of abnormal cells in the body resulting in tumours that can be benign or malignant (cancerous cells). A proper treatment is necessary to fight with this serious disease.

  Discuss the different environmental companies

Discuss the different agencies, institutes, centers, different environmental companies that are active in UAE.

  Develop a simple urban constructed wetland design

Develop a simple urban constructed wetland design.

  Evaluate company performance in relation to GRI standards

Evaluate company performance in relation to GRI standards and comment on Stigler's theory.

  Water system design

Determine the corresponding error in the computed discharge

  Hydraulic behaviour in open channel

Describe how test flumes and associated equipment are used to assess and confirm hydraulic behaviour in open channel

  Write a paper on steel sustainability

Write a paper on steel sustainability.

  Writing case study about bridge collapse

Writing case study about bridge collapse

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd